HVAC Renovation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This HVAC Renovation project, managed by the New York City Design and Construction agency under solicitation number 20260527008, involves the removal and replacement of AC-3 serving the second and third floors. The scope of work includes the installation of new supply and return ductwork, new controls, and two return fans. To facilitate the installation of the new air handling unit, the third floor mechanical equipment room will be extended and updated with new lighting, a humidifier, a hot water coil with associated piping, and condenser water piping. Additional site work includes the removal and re-installation of affected lighting and ceiling-mounted devices, as well as the replacement of sprinkler heads and piping in the third floor mechanical equipment room and the securing of corridor sprinkler piping to the slab. This contract, identified by PIN 85025B0077001 and associated with Manhattan Community Board 7, was awarded to the lowest bidder through a competitive sealed bidding process.
General Info
Contract Value
$2,585,000NAICS
Place of Performance
Not specifiedSet-Aside
Awardee
ENL Mechanical IncorporatedAward Issued Date
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
This Project consists of the removal and replacement of AC-3 which serves the second and third floors. New supply and return ductwork will be installed. The Third Floor MER will be extended to accommodate the removal and installation of the new AHU. New Controls and two new return fans will be provided. Existing Lighting and Ceiling mounted devices affected by the removal and installation of new duct work will be removed, stored and re-installed upon the completion of the new ceiling installation. Existing sprinkler heads and piping in 3rd Floor MER will be replaced with new, 2nd and 3rd Floor corridor sprinkler piping will be secured properly to slab. New lighting will be provided in 3rd MER. In the 3rd Flor MER, new humidifier, Hot water coil and associated hot water piping with valves and controls, condenser water piping will be provide for new AHU. Community Board #: Manhattan 7
Special Case Determination not applicable - As per PBB Rule 3-01 (b) using Preferred Method - Competitive Sealed Bidding awarded to lowest bid
PIN: 85025B0077001
More opportunities from New York → Design And Construction
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS