Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HWY 20 West Water Line Project PH 2&3

Closed
PE-66895-NONST-2024-000000016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Cumming, Georgia, through its Utilities Department, is soliciting competitive sealed proposals for the State Route 20 Water and Sewer Improvements Phase II and III project, identified as Cumming Utilities Project No. 694. The project involves significant infrastructure upgrades, including the relocation of existing water lines, gravity sanitary sewer lines, and force mains within active GDOT road improvement zones along SR 20, also known as Canton Highway. The scope includes installing two 16-inch potable water transmission mains on either side of SR 20, along with various size distribution lines along adjacent side roads, and a 36-inch water line on Sawnee Drive. Additionally, trenchless crossings under SR 20 using steel casing are required to connect the water mains. Bids must be submitted in person at the City Hall by September 5, 2024, at 10:00 am, with the opening announced shortly thereafter. The project demands close coordination with GDOT and utility contractors, notably C.W. Matthews, Inc., to ensure seamless integration of construction activities within the active roadway zones. The contract value is estimated between five and fifteen million dollars, emphasizing the project's scale and complexity. Interested parties can find further details and submit proposals through the city's procurement webpage or contact Christa Hopkins for additional information.

General Info

Documents

1

City of Cumming - SR 20 Water and Sewer Improvements Phase II and III

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66895 CUMMING, PE-66895-NONST-2024-000000016 to PE-66895-NONST-2024-000000016.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Stone Mountain
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Cumming, Georgia, d/b/a City of Cumming, GA (d/b/a Cumming Utilities Department) (Owner) is requesting Competitive Sealed Proposals (Bids) for the construction of the following Project:
State Route 20 Water and Sewer Improvements Phase II and III Cumming Utilities Project No. 694 Garver Project No. 2302128
Bids for the construction of the Project will be received by the City of Cumming, Utilities Department at City Hall, 100 Main Street, Cumming, GA 30040, until September 5, 2024 at 10:00 am local time. At 10:05 am, the Bids received will be announced in the ground floor conference room. Submit Bids to the Utilities Department Receptionist located on the ground floor. Any bid received after 10:00 am will be returned unopened.
For additional information visit the City¿s procurement web page located at: https://cummingutilities.com/about/requests-for-proposals-rfps-and-bids/ The Project generally includes relocation of existing water lines, gravity sanitary sewer lines and sanitary sewer force mains within active Georgia Department of Transportation (GDOT) road improvements projects P.I. 0002862, (Phase III) and P.I. 0003682, (Phase II) construction zone along State Route 20 (SR 20), also known as Canton Highway. The selected Contractor will need to coordinate and schedule work activities with the GDOT road contractor, C.W. Matthews, Inc, as well as the other utility contractors in the construction zone. More specifically, the Work includes, but is not limited to, construction of the following:
1. Water Mains a. Installing two 16-inch potable water transmission mains, one on the north side and one on the south side, of SR 20. b. Installing 8-inch, 12-inch and 16-inch water distribution lines along the affected side roads of SR 20. c. Installing a 36-inch water line on the west side of Sawnee Dr (SR 306). d. Installing via trenchless method, 16-inch water line crossings under SR 20 in 24-inch steel casing to connect the 16-inch water transmission mains

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS