Hwy 21/Old Tusculum Water Improvements (PE26141)

Closed
PE-66741-NONST-2026-000000013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 5 hours ago

DEADLINE

in about 20 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 5 hours ago

DEADLINE

in about 20 hours

AI Contract Overview

Show more

Sealed bids are being accepted for the construction of water improvements along Hwy 21/Old Tusculum in Springfield, Georgia, with a deadline of May 21, 2026, at 2:00 PM. Bids must be submitted to the City of Springfield City Hall, where they will be publicly opened and read at the specified time. Late submissions will not be accepted, and bids cannot be withdrawn for 60 days following the closing date. The project scope includes furnishing all materials and labor to install water infrastructure components such as approximately 40 linear feet of 16-inch C900 PVC water main, 240 linear feet of directional bore in FPVC casing, fire hydrant installation, valves, elbows, connections to the existing system, and final grassing. The entire work must be completed within 60 calendar days. Contract documents, including plans and specifications, can be obtained from Parker Engineering, LLC for a non-refundable fee of $100 per full-size set. The work is classified as utility contracting under Georgia law, requiring the contractor to hold a valid utility contractor license and employ a Utility Manager certified to oversee the project. Bidders must submit a bid bond or certified cashier’s check amounting to at least 10% of the base bid. Funding for the project is secured through the American Rescue Plan Act and the City of Springfield. The City reserves the right to reject any or all bids and to waive informalities. For additional details and bidding instructions, interested parties may contact Lindsey Bashlor at Parker Engineering.

General Info

Sealed bids due May 21, 2026, for water improvements in Springfield, Georgia, 60-day completion.

Documents

1

Advertisement for Bids - Hwy 21 Old Tusculum Water Improvements

PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Springfield
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Springfield
Office AddressN/A

Full Description

Show more
Sealed bids for construction of Hwy 21/Old Tusculum Water Improvements will be received until May 21st, 2026 at 2:00 PM at the City of Springfield City Hall at 130 South Laurel Street, Springfield, Georgia 31329 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Water improvements including, but not limited to approximately 40 LF of 16" C900 PVC water main, 240 LF of 16" FPVC directional bore in 20" FPVC casing, fire hydrant, valve, elbows, connecting to existing system, and grassing. Time allotted for completion of work is sixty (60) calendar days. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: +1 (555) 000-0000, email: contact@example.gov, upon payment of $100.00 for each full-size set (non-refundable). The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a Utility Contractor and must also employ a Utility Manager certification holder who will have oversight of all the work. See Instruction to Bidders for additional bidding requirements. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. Funding is to be provided by American Rescue Plan Act (ARPA) and the City of Springfield. Owner reserves the right to reject any or all Bids and to waive informalities.

More opportunities from Georgia → City of Springfield

Same awarding agency

NAICS: 562111
SLED
RFP 26-004 Residential Solid Waste Collection and Disposal
Solicitation # RFP-26-004
The City of Springfield is soliciting proposals under RFP-26-004 for municipal Residential Solid Waste Collection and Disposal Services. The selected contractor will be responsible for providing all labor and equipment for once-per-week residential collection, including the provision of brand new 96-gallon containers. Additional requirements include the weekly emptying of three city-use solid waste dumpsters and two public cardboard dumpsters, as well as specialized support for the November Fall Festival. All waste must be disposed of in permitted Subtitle D Municipal Solid Waste landfills, and the contractor must provide monthly reports on waste composition and volume by the 15th of each month. The contract is scheduled to commence on April 1, 2027. Proposals must be submitted in a sealed envelope containing one hard copy and one digital copy on a flash drive by 2:00 p.m. on November 3, 2026. Submissions must include a bid bond, a proposal submission form, and a detailed costs table covering a base period of three years with two subsequent renewal options. Evaluation is based on a weighted scale: cost and fee proposals (30 points), services provided (25 points), understanding of needed services (20 points), company qualifications (10 points), and demonstrated performance within Effingham County (5 points). The City also requires evidence of a valid business license, specified insurance, and adherence to equal opportunity and drug-free workplace policies.
Solid Waste Collection

POSTED

28 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS