Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Hydraulic System Design and Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Hydraulic System Design and Installation involves the installation and integration of hydraulic power systems for prime contractors on Oregon Department of Transportation projects. The scope of work includes installing pumps, valves, and hydraulic lines powered by truck hydraulics using AW ISO 32 fluid, with all schematics developed according to ANSI Y32.10 standards. The contractor must deliver a fully functional hydraulic control system that meets a strict leak tolerance of no more than one drop every four hours. The project is located in Salem, Oregon, and falls under NAICS code 333999. There is no specified set-aside status for this opportunity. The solicitation was posted on November 19, 2026, with a response deadline of December 10, 2026.

General Info

Hydraulic system design and installation for Oregon Department of Transportation projects in Salem.

Documents

This scope was carved out of S-73000-00017704.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tow-type Snowplow Trailer with Mounted Stainless-steel Sander and De-Icer Pre-Wet System Pa

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 21 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 6 documents on the prime contractFrom Tow-type Snowplow Trailer with Mounted Stainless-steel Sander and De-Icer Pre-Wet System Pa
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation and integration of hydraulic power systems for prime contractors on Oregon Department of Transportation (ODOT) projects. Installs hydraulic lines, pumps, and valves powered by truck hydraulics using AW ISO 32 fluid. Develops schematics per ANSI Y32.10 standards. Ensures leak tolerance of no more than one drop in four hours. Delivers a fully functional hydraulic control system.

Similar Contracts

Same NAICS industry code

NAICS: 333999
New
SLED
Lake Henshaw Resort Groundwater Treatment System for Iron & Manganese Removal
Solicitation # 20261117067
The Vista Irrigation District is soliciting proposals for the procurement of a skid-mounted groundwater treatment system at the Lake Henshaw Resort in Santa Ysabel, California. The system is designed to remove iron and manganese from groundwater pumped by two existing wells, with a required capacity of up to 60 gallons per minute and the ability to reduce concentration levels of both minerals to below 0.01 mg/l. The system must be weather-resistant, NSF 61 certified, and utilize NSF/ANSI Standard 61 listed manganese dioxide filter media regenerated with chlorine. The contractor is responsible for delivering the complete system and providing an authorized service representative for up to four site visits to assist with installation, startup, and training, though the District staff will handle the actual installation and connection to the water system. The selection process is based on a weighted evaluation where non-price factors and price factors are each weighted at 50 percent. Non-price criteria include expected performance, system efficiency, contractor responsiveness, system flexibility, and proposal responsiveness. Proposals must be submitted electronically via the PlanetBids portal by December 9, 2026. Key requirements include the submission of detailed shop drawings, a completed fee response sheet, and adherence to prevailing wage and insurance requirements. For contracts exceeding $80,000, the successful bidder must provide payment and performance bonds. There is no specified set-aside status for this solicitation.
Vista Irrigation District

POSTED

1 day ago

DEADLINE

in 20 days
View Details

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238160
New
SLED
Davis Slough three roofs replacement
Solicitation # 00018265
The Oregon Department of Transportation is soliciting bids for the replacement of metal roofs, insulation, and gutters on three buildings at the Davis Slough Maintenance Station in Coos Bay: Storage building #04, Maintenance building #01, and Electrical storage building #03. The scope of work includes the demolition and removal of existing materials and the installation of new systems, including fasteners, ridge caps, and eave trim. The contractor is responsible for obtaining the Coos County Building Department permit and coordinating all inspections. Performance is subject to State Buy America requirements, BOLI prevailing wage rates, and Oregon OSHA safety standards. Substantial completion is required by March 31, 2027, with final completion by April 10, 2027. Award will be granted to the responsible bidder submitting the lowest responsive bid, evaluated based on total price using lump sum, unit price, or a combination of both. Bidders must provide bid security equal to 10% of the total bid amount and must submit a record of three similar projects completed within the last three years. Required certifications include non-discrimination in subcontracting and adherence to workplace policies regarding sexual harassment and discrimination. There is no set-aside status specified for this solicitation. All materials must be delivered in original packaging and stored according to specific moisture control and stacking guidelines to ensure quality.
Roofing Contractors

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS