Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hydraulics & Hydrology Services for the Hardy Downtown Connector (HDC) Program for the Harris County Toll Road Authority

Closed
26/0080State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Harris County Toll Road Authority is soliciting hydraulics and hydrology services for the Hardy Downtown Connector (HDC) Program, focusing on comprehensive drainage infrastructure engineering for the Buffalo Bayou, White Oak Bayou, Hunting Bayou, and Greens Bayou watersheds. The work includes hydraulic and hydrologic modeling using XP-SWMM, HEC-RAS, and HY-8; culvert and cross-drainage design; bridge scour analysis; pump station planning; stormwater detention evaluations; and implementation of water quality best management practices compliant with TCEQ standards and TxDOT manuals. Proposals must demonstrate qualifications-based selection under Texas Government Code §2254.004, with evaluation centered entirely on the respondent’s statement of qualifications, experience, and availability—weighted at 30 points—including an executive summary, project management contacts, and evidence of relevant past projects. Price is not evaluated initially but will be negotiated after selection of the most qualified firm. Key personnel must be Texas-licensed Professional Engineers with TxDOT precertifications in hydraulic design categories, and resumes must include licensure numbers, experience, and availability starting October 1, 2026. The solicitation requires strict adherence to formatting guidelines: proposals must be divided into four sections with page limits of two pages for the transmittal letter, five pages for the statement of qualifications, and one page per resume, with all documents labeled by vendor name and job number. Submissions are exclusively via the Bonfire portal by June 1, 2026. M/WBE participation is mandatory with a 19.60% goal, requiring certified firms to demonstrate Significant Local Presence through three prior contracts in specific Texas counties and maintain a physical office within those areas. Contractors must submit Good Faith Efforts documentation if the goal is not met, along with letters of intent and certifications from approved agencies. Insurance requirements include general liability with additional insured endorsements and a 30-day cancellation notice. The place of performance spans Harris, Fort Bend, Montgomery, Brazoria, and Galveston counties, and all deliverables must align with ProjectWise and TxDOT design standards. No geotechnical services, survey, or SUE are required under this contract.

General Info

Harris County seeks qualified firms for hydraulic hydrology services on HDC Program, requiring Texas-licensed engineers, M/WBE compliance, and Bonfire submission by June 1, 2026.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

11

26-0080 RFQ Hydraulics & Hydrology Services for Hardy Downtown Connector

PDF, High priority: read this firstrfq
High

26-0080 RFQ Special Requirements H&H Addendum #1

PDF, High priority: read this firstrfq
High

Addendum No. 1 for RFQ 26-0080 Hydraulics & Hydrology Services

PDF, High priority: read this firstamendment
High

Harris County Minimum Insurance Requirements Attachment

PDF, High priority: read this first9 pages · insurance-requirements
High

MWBE Goal Information and Tip Sheet

PDF, High priority: read this firstspecial-notice
High

MWBE Goal Participation Information Packet - Harris County

PDF, High priority: read this firstspecial-notice
High

MWBE Utilization Plan Commitment Form for Solicitation 26/0080

PDF, High priority: read this firstmwbe-utilization-plan
High

RFQ 26-0080 Pre-Submittal Agenda for Hydraulics & Hydrology Services

PDF, High priority: read this firstpresolicitation
High

26-0080 Pre-Submittal Sign in Sheet for Hydraulics & Hydrology Services

PDF, Low priorityspecial-notice
Low

Acknowledgement of Addendum No. 1

PDF, Low priorityacknowledgment-of-addendum
Low

MWBE Trucking Procedure Compliance Packet

PDF, Low priority9 pages · compliance-procedure
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Harris County
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → Harris County
Office AddressTX, USA
Contacts
SueEllen Arredondo

Interested Companies (122)

Associated Testing Laboratories
Paquin Ramezani
EnsolumDallas, Texas

See All 122 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Hydraulics & Hydrology Services for the Hardy Downtown Connector (HDC) Program for the Harris County Toll Road Authority

More opportunities from Texas → Harris County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS