Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Hydrogen Flame Detection and FACP Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of hydrogen flame detection systems for prime contractors working on Victor Valley Transit Authority facility projects in Hesperia, California. The scope of work requires the installation of dual-spectrum UV/IR Triple-IR flame detectors equipped with air purge assemblies. The contractor is responsible for interfacing these detectors with existing Simplex Fire Alarm Control Panels using addressable monitor modules. This includes programming the panels for detector-specific alarm and supervision to ensure a fully integrated system that reports directly to the central control panel. The solicitation was posted on October 13, 2026, with a response deadline of November 19, 2026.

General Info

Install hydrogen flame detection systems and integrate with fire panels in Hesperia, California.

Documents

This scope was carved out of IFB 2027-01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Building Modifications For Hydrogen Fuel Cell Bus Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Victor Valley Transit Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs hydrogen flame detection systems for prime contractors on Victor Valley Transit Authority facility projects. Installs dual-spectrum UV/IR Triple-IR flame detectors with air purge assemblies. Interfaces detectors with existing Simplex Fire Alarm Control Panels (FACP) using addressable monitor modules and programs the FACP for detector-specific alarm and supervision. Delivers an integrated flame detection system reporting to the central FACP.

Similar Contracts

Same NAICS industry code

More opportunities from California → Victor Valley Transit Authority

Same awarding agency

NAICS: 236220
New
SLED
Building Modifications For Hydrogen Fuel Cell Bus Maintenance
Solicitation # IFB 2027-01
The Victor Valley Transit Authority (VVTA) is soliciting bids under IFB 2027-01 for construction services to modify its bus maintenance and fuel island facility in Hesperia, California. The project's primary objective is to enable the safe storage, maintenance, fueling, and operation of Fuel Cell Electric Buses (FCEBs). The scope of work includes the removal and replacement of the existing gas detection system in the maintenance building, the installation of hydrogen, methane, and carbon monoxide detection, and the implementation of a hydrogen flame detection system using Triple-IR detectors integrated with the existing Simplex Fire Alarm Control Panel. Additionally, the fueling canopy area will receive hydrogen and methane gas detection and alarm functions. All work must comply with NFPA 2, UL 2075, and UL 2017 standards. This is a lump sum contract with an estimated performance period of 180 days. Award will be granted to the responsible and responsive bidder offering the lowest price, though VVTA will also evaluate life expectancy, operating efficiency, and past performance. Bidders must provide a bid bond of at least 10 percent of the total bid, and the successful contractor will be required to furnish performance and payment bonds for 100 percent of the contract sum. Because the project is financed with federal funds, contractors must adhere to Buy America requirements and prevailing wage rates as determined by the Secretary of Labor or the State of California. Administrative requirements include the submission of a preliminary project schedule within five working days of the Notice to Proceed and monthly partial payment requests subject to a five percent retention. Bids must be submitted by November 19, 2026, and must include a separate envelope for pricing, a list of subcontractors, and a minimum of five client references. Final acceptance of the work is contingent upon successful inspections and tests conducted during the first year of operation.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS