Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Florida was posted on April 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hydrotesting Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for Hydrotesting Services, issued by the Florida Solid Waste agency, requires the performance of a 24-hour hydrostatic test on an installed tank. The primary objective of the service is to verify the structural integrity and leak-free performance of the tank, with a requirement for full documentation of the results. The solicitation was posted on April 10, 2026, and requires responses to be submitted by April 30, 2026. The project is categorized under NAICS code 541330, focusing on engineering services to ensure the installation meets all necessary safety and performance standards.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-0374-ITB.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IWTF Microfiltration Feed Tank Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 12 days
  • Production Lot Testing (PLT) ServicesOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → SOLID WASTE
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → SOLID WASTE
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform a 24-hour hydrostatic test on the installed tank to verify structural integrity and leak-free performance, including documentation.

More opportunities from Florida → SOLID WASTE

Same awarding agency

NAICS: 237130
New
SLED
Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)
Solicitation # 27-0075-RFQ-DB
Pinellas County is seeking a design-build firm for the design and construction of a centralized microgrid and power distribution system at the County Solid Waste Disposal Complex in St. Petersburg, Florida. The project aims to consolidate and modernize electrical infrastructure for multiple facilities, including a Waste-to-Energy facility, mosquito control operations, and sheriff's training facilities, by replacing existing Duke Energy services with a new microgrid. Key technical requirements include the construction of a new switchgear building elevated above the 500-year floodplain, the integration of a floating photovoltaic array with an estimated 5 MW capacity, and compliance with the Florida Building Code, NEC, and NESC standards. The project is divided into two phases: a design phase lasting 274 to 365 days and a construction phase lasting 390 to 480 days. The procurement process utilizes a multi-phase evaluation based on a 200-point scale, weighing firm experience, previous work with the county, and oral presentations regarding project understanding and managerial methods. Awarded contractors must provide a 5% bid bond for the Phase 2 base bid and 100% performance and payment bonds for the total lump sum price. Payments are processed in arrears per the Local Government Prompt Payment Act with Net 45 terms. This solicitation is a CCNA Non-Continuing Contract and does not have a specific set-aside status. All software and hardware for the microgrid must meet IEEE 1547 cybersecurity requirements.
Power and Communication Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS