Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

I-280 Culvert Replacement (EA 04-0V250)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

N/A

Place of Performance

San Jose, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes removing and replacing a culvert system on the Interstate (I-) 280 southbound separation to State Route (SR-) 87 in Santa Clara County from post mile (PM) R2.8 to R3.0. There is a substantial amount of water seeping through the pavement and depressed areas between the two drainage inlets (Dis) on the asphalt concrete (AC) pavement. Based on visual inspections of the site and review of the as-builts, the settlement and cracks is likely due to the failure of the underdrain pipes. The underdrains have limited capacity as they are partially filled with soil, corroded, and at some locations are fully blocked, causing water seepage through the roadway surface. The foundation soils are migrating into the underdrain system and as a result, cavities and settlement have been created. To prevent the underdrain system from migrating into the water seepage, the existing underdrain will be removed and replaced with a new system consisting of 10” Perforated PVC pile (PPP) (Refer to D102 in 2022 Standard Plans), and a Class 3 Permeable Material (PM) drainage layer under the shoulder with a length of 330’ to draw down the inflow of the groundwater. Trenching of the roadway will be required to access the underdrain. The foundation soils under the pavement will be strengthened using compaction grouting in combination with sodium silicate, which is a fast-acting chemical setting agent. Before the construction of the new underdrain, the compaction grouting will be used within the limits of the settled areas to an approximate depth of 20 feet. The roadway will then be repaved with hot mix asphalt (HMA). Traffic control will be required during construction.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS