Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 9, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ICE CAVES TRAIL BRIDGE SUPPLY

Awarded
R6-MBS-8-29Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Mt Baker Snoqualmie National Forest is soliciting the design, fabrication, and delivery of a prefabricated trail bridge superstructure to replace a structure destroyed in 2006. The project requires a bridge approximately 210 feet long and 6 feet wide, featuring weathering steel girders or trusses to replace existing glu-lam components. The structure will consist of two main spans of 110 feet and 55 feet, along with 22-foot approach spans at each end, and will include timber or steel decking and railing. Because the new bridge will be 2 feet higher than the original, short bents must be provided for the existing piers. This contract is a 100 percent set-aside for HUBzone small business concerns. All materials must be delivered to the Ice Caves Express Trailhead parking lot in Washington no later than September 15, 2008. The scope of this specific solicitation is limited to the supply of materials, while the installation phase is handled under a separate project. Interested parties may submit multiple proposals for consideration.

General Info

Contract Value

$278,709.6

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

Darrington Ranger District, Snohomish County, WA, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment-1.pdf

PDF

Amendment-2.pdf

PDF

Attachment01-Ice_Caves_Title_Sheet_Sheet_1_of_5.pdf

PDF

Attachment02-Ice_Caves_+Bridge_Location_Map_Sheet_2_of_5.pdf

PDF

Attachment03-Ice_Caves_General_Notes_Sheet_3_of_5.pdf

PDF

Attachment04-Ice_Caves_Existing_Bridge_Sheet_4_of_5.pdf

PDF

Attachment05-Ice_Caves_Existing_Bridge_Sheet_5_of_5.pdf

PDF

r6-mbs-08-29-copy-to-submit.pdf

PDF

r6-mbs-08-29-solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts2 people available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA
Contacts
Jorge A. SomozaProcurement Technician
Janet E. HadaPurchasing Agent

Full Description

Show more
This project consists of the supply of an approximately 210' long, 6' wide prefabricated trail bridge superstructure to replace a bridge destroyed in the 11/2006 flood. The plan is to replace the destroyed glu-lam girders and the remaining glu-lam girders with weathering steel girders or trusses supported by the remaining (3) piers (110' and 55' main spans) as well as a 22' approach span at each end. It will include timber or steel decking and railing. The new bridge will be approximately 2' higher than the old one so short bents need to be supplied to set on top of existing piers. The bridge supply will include the design, fabrication and delivery of all superstructure materials. More than one proposal may be submitted by each quoter. To reach the project site, from Granite Falls, WA take the Moutain Loop Highway east approx 25.6 miles to the Big Four Picnic Area, then take the Ice Caves Trail approx 0.3 miles to the bridge site, which is across the South Fork Stillaguamish River. The bridge may also be accessed from the Ice Caves Express Trailhead which is near milepost 26.0 and the trail distance is the same. Estimated issued date of the solicitation is or or about April 30, 2008. Delivery shall be made no later than September 15, 2008. The delivery site is the Ice Caves Express Trailhead parking lot. This project is 100% set-aside for HUBzone small business concerns. Technical contacts for this project are Gary Paull +1 (555) 000-0000 ext 207 or email contact@example.gov or Peter Wagner +1 (555) 000-0000 ext 311 or email contact@example.gov Note: For Installation portion of this project see R6-5-08-06

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS