Ice Harbor Dam Navigation Lock Upstream Tainter Gate
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the fabrication, delivery, and installation of a new upstream Tainter Gate at the Ice Harbor Dam Navigation Lock, including associated storage cradles, metrology services, and site preparations. The work is to be performed in accordance with detailed technical specifications, supplemental drawings, and engineering plans prepared by the US Army Corps of Engineers Walla Walla District. The primary performance period spans from May 3, 2027, to July 15, 2027, with specific outage work scheduled in March 2026. Delivery of the completed gate and related components must occur no later than mid-July 2027, with the contractor responsible for transportation, secure storage, and site coordination. The project location is at Ice Harbor Lock and Dam in Burbank, Washington, and all work must comply with applicable safety, environmental, and technical standards, including AISC, AMPP, and USACE safety regulations. The solicitation is issued as a sealed bid (IFB), with award based on the lowest responsive and responsible bid, considering a 10% evaluation preference for HUBZone small businesses. Bids must include all required certifications, technical qualifications, and a bid guarantee. The contract incorporates numerous FAR clauses covering security, responsible contractor requirements, and prohibitions on certain foreign technology and equipment. Payment will be made via progress payments through the Resident Management System, with specific procedures for submission, documentation, and approval. The contract also mandates strict security protocols for personnel accessing the project site, including vetting, AT Level I training, and adherence to security policies. Overall, the project emphasizes technical compliance, schedule adherence, quality control, and security, with detailed instructions for proposal submission, documentation, and contract administration.
General Info
Place of Performance
Burbank, WA, 99323, USASet-Aside
Timeline
Organization & Contact Information
Full Description
This notice is to announce the results of the Bid Opening for the Ice Harbor Dam Navigation Lock Upstream Tainter Gate requirement, which was held on December 15, 2025.
The documents required by Federal Acquisition Regulation (FAR) 14.403 have been uploaded to SAM.gov.
Please note, a supplementary PDF is attached that reflects the correct pricing for each Contract Line Item Number (CLIN). This PDF was necessary because the character limitations of the standard form prevented the entry of the complete pricing amounts and complete company names.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → US Army Engineer District Walla Wal
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
