This Solicitation opportunity from Massachusetts was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
IFB #26-04 Stone Revetment Work at Northfield Point
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Stone Revetment and Embankment Stabilization project at Northfield Point in Fall River, Massachusetts, issued through an Invitation for Bids (IFB #26-04) by the City of Fall River. The project involves installing approximately 1,200 feet of armor stone along the shoreline revetment, utilizing existing stone where feasible, and implementing erosion controls, turbidity curtains, and site restoration. The estimated project value ranges from $500,000 to $1.5 million, with bids due by August 21, 2025. Bidders must submit four copies of their bid, including one original and a digital copy on a flash drive, accompanied by a bid deposit of 5% of the total bid amount, payable via certified or cashier’s check, bid bond, or similar instrument. An optional pre-bid conference is scheduled for August 6, 2025, at the project site, and questions must be submitted in writing by August 13, 2025, with responses issued by August 18, 2025. The contract is anticipated to be awarded within 30 days of bid opening. The procurement is governed by Massachusetts state law (M.G.L. c.30, Section 39M), requiring compliance with local, state, and federal environmental permits, including those from the Fall River Conservation Commission, Massachusetts Department of Environmental Protection, and the Army Corps of Engineers. The award process is strictly price-based, with the contract awarded to the lowest responsible and responsive bidder, as no qualitative or technical evaluation factors are specified. The project location is at Northfield Point, with work to be performed in accordance with all relevant permits and regulations. The contract documents do not specify detailed performance periods, FOB terms, or specific packaging, marking, or inspection procedures, focusing instead on regulatory compliance, technical scope, and procurement timelines. Overall, the contract emphasizes adherence to legal, environmental, and technical standards, with clear instructions for bid submission and project execution.
General Info
Place of Performance
MA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Massachusetts → City of Fall River
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS