Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

IFB 27-0241 Brooks Turf Field Repair Project

Active
BD-26-1154-PUCH1-PUCH1-131001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Massachusetts → PUCH1 - PurchasingView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Medford, MA, 02155, US

Set-Aside

NONE

Documents

(2)

commbuys-source-page-BD-26-1154-PUCH1-PUCH1-131001.html

HTML

IFB 27-0241 Brooks Turf Repair and Drainage Project

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → PUCH1 - Purchasing
Contacts1 person available
OfficeMedford, MA, 02155, US
Organization / Agency
Massachusetts → PUCH1 - Purchasing
View Agency Profile
Office AddressMedford, MA, 02155, US
Contacts
Kellie CavanaughPurchaser

Full Description

Show more
The City of Medford, led by the School Department, is accepting sealed bids for the Brooks Elementary School Turf Repair and Drainage Project located at 388 High Street, Medford, Massachusetts, 02155.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is preparing to upgrade the Central Mechanical Plant by replacing the existing Deaerator and Condensate tanks, aiming to enhance system efficiency, reliability, and safety. This procurement initiative is scoped under NAICS code 238110, indicating it is for plumbing, heating, and air-conditioning contractors, and will likely require specialized expertise in industrial boiler and steam system components. The project involves the removal of outdated equipment and the installation of new, modern systems meeting current operational and regulatory standards, with performance expected at the Central Mechanical Plant facility. All work must be coordinated to minimize disruption to ongoing facility operations. Leila Gonzalez-Rigatto serves as the primary point of contact for inquiries, with Matthew Piccolo designated as the Project Manager overseeing implementation. The solicitation was posted on July 22, 2026, and while it is currently listed as a forecast, interested vendors should prepare to respond once formal bidding documents are released. There is no set-aside designation specified, making this opportunity open to all qualified contractors without restriction based on business size or ownership type. Contractors are encouraged to review the official posting via the provided UI link for detailed technical specifications, timelines, and submission requirements once available.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and safety upgrade initiative for the airfield infrastructure at the Port of Seattle, targeting critical systems that enhance operational reliability and compliance with aviation safety standards. Key components include replacing aging airfield lighting circuits exhibiting low megger readings with new LED lighting fixtures and signs to improve visibility, energy efficiency, and longevity. Parallel efforts involve the replacement of deteriorating pavement sections and essential utilities to ensure structural integrity and prevent service disruptions. Wildlife hazard mitigation is prioritized through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter bird activity, and the regrading of low-lying areas coupled with new storm drainage infrastructure to eliminate ponding and reduce attractants to wildlife. Additional scope includes the replacement of failing flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response teams. The project falls under NAICS code 237990 and is managed by the Aviation Project Management Group under the Port of Seattle, with Yanet Maldonado listed as the primary point of contact. Though formally issued as a forecast on July 22, 2026, this consolidated effort brings together multiple capital improvement components under a single procurement umbrella, signaling an integrated approach to airfield resilience, safety, and long-term operational readiness.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves comprehensive upgrades to airfield infrastructure at the Port of Seattle, focusing on critical safety and operational enhancements. Key components include replacing airfield lighting circuits with low megger readings with modern LED lighting fixtures and signs to improve visibility and energy efficiency. Failing pavement and essential utility systems will be removed and replaced to ensure structural integrity and reliable service. Wildlife hazard management is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and mitigation of ponding via regrading and new storm drainage infrastructure. Additionally, failing flush fire hydrant access hatches will be replaced to maintain emergency response capabilities. The contract, titled 2027 Airfield Project - Contract 2, was posted on July 22, 2026, under NAICS code 237990 for other heavy and civil engineering construction. It is managed by the Aviation Project Management Group of the Port of Seattle, with Moraa Omwega as the primary point of contact and David Neds serving as Project Manager. The project is anticipated to enhance airfield safety, reduce maintenance costs, and support long-term operational efficiency through modernized systems and environmental controls, though no set-aside details are specified. All work is expected to occur at the Port of Seattle’s airfield facilities.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details

More opportunities from Massachusetts → PUCH1 - Purchasing

Same awarding agency