Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB# 27-03 Kelly Power Plant Roof Replacement

Closed
BD-27-1070-MMA01-PURCH-134063State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
IOOF Main Dorm Flat Roof Replacement Project
Solicitation # ioof-main-dorm-flat-roof-replacement-project
The IOOF Main Dorm Flat Roof Replacement Project is a subcontracting opportunity with the Flint Hills Job Corps Center and Serrato Corporation for the replacement of four flat roofs at the center in Manhattan, Kansas. The scope of work requires the installation of a 60 mil, fully adhered EPDM white membrane with minimum average R-0 poly isocyanate tapered insulation and staggered joints. Approved systems include those from Elevate Building Products, Carlisle SynTec, Johns Manville, or an equivalent. The project must be completed within 30 consecutive business days and adhere to NRCA and SMACNA standards, as well as EPA and OSHA regulations. Required deliverables include an insulation layout plan, product cut sheets, a minimum 20-year No Dollar Limit manufacturer warranty, and a 5-year installer warranty for materials and workmanship. This solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals will be evaluated based on price and price-related factors, with the award going to the responsible contractor most advantageous to Serrato Corporation. Submissions must include a detailed pricing schedule with labor, material, and other cost breakouts, a W-9, DUNS number, and a Certificate of Liability Insurance listing the Center as an additional insured. The response deadline is December 11, 2026.
Flint Hills Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 17 days
NAICS: 238160
New
SLED
Imaging Research Center Roof Replacement
Solicitation # 20261121008
The University of California, UC Davis Health is soliciting bids for the Imaging Research Center Roof Replacement project in Sacramento, California. The scope of work involves replacing approximately 14,400 square feet of roofing at the Image Research Center Building, which includes the removal of existing roofing and substrate and the installation of a new single-ply PVC membrane system. The project requires the replacement of deteriorated roofing deck material, the installation of new fall protection at the building perimeter, and the temporary removal and raising of mechanical equipment units to accommodate new disconnects and roof outlets. Because the work will be performed in an operational healthcare and research facility, the contractor must coordinate efforts to minimize disruptions to ongoing operations. The contract will be awarded to the lowest responsible and responsive bidder, with an estimated construction cost of 1,500,000.00 USD. The anticipated project award date is February 2027, with an expected construction duration of 180 days. To be eligible, contractors must undergo a prequalification process, which includes submitting a questionnaire via BuildingConnected by December 11, 2026. Prequalification requirements include agreement to state prevailing wages, a 10% bid bond, 100% payment and performance bonds, and adherence to insurance requirements. All work is subject to the California Labor Code and must comply with UC Fair Wage and DIR registration standards.
University of California, UC Davis Health

POSTED

about 4 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Massachusetts Maritime Academy is soliciting bids for the complete roof replacement of the Kelly Power Plant Building located at 101 Academy Drive in Buzzards Bay, Massachusetts. The project, identified as IFB# 27-03 (Solicitation BD-27-1070-MMA01-PURCH-134063), involves replacing an existing built-up roof insulated assembly with a new cold-applied SBS modified bituminous insulated roof assembly that meets current energy code requirements. The scope of work includes the installation of all perimeter roof flashings, scuppers, rain leaders, and counter flashings at masonry wall conditions, following documents prepared by Perry Dean Rogers Partners Architects. The estimated cost for the project is 290,000 dollars. Bids must be submitted electronically via biddocs.com by October 22, 2026, at 3:00 PM EDT, as hard copy bids will not be accepted. A mandatory pre-bid conference and site visit are scheduled for October 15, 2026. To be considered, general bidders must be certified in the Roofing category by the Division of Capital Asset Management and Maintenance (DCAMM) and provide a current DCAMM Certificate of Eligibility and a signed Prime/General Contractor Update Statement. Additionally, bids must include a deposit of at least five percent of the greatest possible bid amount. Awardees must adhere to specific supplier diversity benchmarks, including minimums of 4 percent for MBE, 3 percent for VBE, and specific workforce participation targets for women and minorities.

General Info

Bids for Kelly Power Plant roof replacement due October 22, 2026, costing $290,000.

Place of Performance

Academy Drive Buzzards Bay, MA, 02532, USA

Set-Aside

NONE

Documents

22
HTML, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
PDF, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High

Read all 22 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • EPDM Flat Roof Installation and ReplacementOpen now, due in 18 days
  • Roofing and Accessories InstallationOpen now, due in 23 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts Maritime Academy
Contacts2 people available
OfficeAcademy Drive Buzzards Bay, MA, 02532, USA

Full Description

Show more
Kelly Power Plant Roof Replacement A complete roof replacement of an existing built-up roof (BUR) insulated roof assembly with a new cold-applied SBS modified bituminous insulated roof assembly meeting current energy code requirements at the Kelly Power Plant Building. Replacement includes all perimeter roof flashings, scuppers, rain leaders and counter flashings at masonry wall conditions

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS