Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB 4CA06834 Flooring Removal and Installation

Closed
4CA06834State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Transit Maintenance Facility Maintenance Floor Recoating
Solicitation # TRT-26-27-TMF42026
The City of Santa Clarita is soliciting bids for the Transit Maintenance Facility Maintenance Floor Recoating project located at 28250 Constellation Road, California. This federally funded project requires the complete removal of approximately 12,000 square feet of existing floor coating down to the subsurface concrete, the application of a built-in moisture control system, and the installation of a new high-strength, high-traffic epoxy coating with non-slip grit following the existing pattern. The contract will be awarded to the lowest responsible and responsive bidder, with work governed by the 2018 Greenbook and 2026 Cumulative Supplement. Bidders must submit proposals via BidNet by November 20, 2026, at 11:00 AM PT, while providing a notarized proposal guarantee bond of at least 10 percent of the bid value to City Hall. The project mandates strict compliance with federal and state regulations, including the Davis-Bacon Act for prevailing wages, Buy America certifications, and EEO requirements. Awardees must provide faithful performance and labor and material bonds for 100 percent of the contract price, as well as comprehensive insurance coverage for general liability, auto liability, and workers compensation. Additionally, the contractor must adhere to specific material storage requirements and provide safety data sheets for all chemical degreasers used on site.
City of Santa Clarita

POSTED

about 5 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract requires the contractor to remove existing flooring and install new porcelain wood-look tiles measuring 8 inches by 48 inches, specifically MSI Surfaces Cottage Brown or a comparable high-traffic commercial-grade tile that matches the existing flooring in the Main Bathroom. If an alternative tile is proposed, the contractor must provide at least three comparable options that are similar in price, material, and suitable for high-traffic areas, with all material approvals subject to the CAL FIRE Project Manager's approval. The scope includes delivery, setup, installation, disassembly, removal, and disposal of the old and new flooring materials. The project is overseen by the California Department of Forestry and Fire Protection, with a contract value estimated between $20,000 and $50,000, and responses are due by June 10, 2024. The primary contact for the project is Gilbert Delpasen, reachable via email or phone, and further details can be accessed through the provided procurement link.

General Info

Documents

1

4CA06834 Flooring Removal and Installation

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Forestry and Fire Protection
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, to remove existing flooring and install new MSI Surfaces 8 " inches X 48 " inches Cottage Brown Porcelain Wood Tile flooring to match existing flooring in the Main Bathroom or a comparable in price high traffic commercial grade tile that matches the existing flooring. If an alternative tile is to be used, the contractor shall be required to provide a minimum of three (3) different options that are comparable in price, similar material that match the existing flooring, and must be commercial high traffic grade. All materials shall be approved by the CAL FIRE Project Manager prior to services. Delivery, set up, installations, disassembling, removal, and disposal shall be included.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS