Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB-Painting, Window, Door and Gutter Services in Los Angeles County.

Closed
07A6421State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
Federal
Building Exterior Repair Project – FDA Pacific Southwest LaboratoryThe U.S. Food and Drug Administration’s Office of Facilities Engineering and Mission Support Services is seeking a contractor for repair and preventative maintenance work at the Pacific Southwest Laboratory in Irvine, California. The project entails structural steel surface preparation and the application of corrosion-resistant coatings on various exterior elements such as stairs, sunshades, and canopies, alongside interior and exterior concrete crack repairs and restoration of damaged resilient flooring where necessary. All work will require coordination with FDA personnel and must adhere to security and safety protocols, as the facility will remain operational throughout the construction period. This requirement is a competitive, firm-fixed-price construction contract set aside entirely for small businesses, with a period of performance spanning 180 calendar days from the Notice to Proceed and including a one-year workmanship warranty. Contractors must comply with the relevant wage determination and provide performance and payment bonds post-award. A mandatory site visit is scheduled for July 1, 2026, at the Irvine location, with registration required in advance and attendance being a condition for proposal consideration. Offerors are responsible for thorough review of all solicitation documents and must submit compliant proposals by the July 20, 2026 deadline.
FDA Office Of Acq Grant Svcs

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the provision of comprehensive exterior renovation services at locations within Los Angeles County, including the removal and installation of gutters, lead abatement, surface preparation and painting, as well as the removal and replacement of windows and exterior doors. Additionally, new doors must be re-keyed to Caltrans specifications. The contractor is responsible for supplying all necessary labor, materials, tools, equipment, travel, permits, and disposal services required to complete the work. To qualify, bidders must hold a valid B-General Building Contractor license issued by the California Contractors State License Board, as well as current lead abatement certifications and hazardous waste transporter registration from the California Department of Public Health and Department of Toxic Substances Control, respectively. Both contractors and subcontractors must also maintain active registration with the Department of Industrial Relations throughout the contract duration. The solicitation is issued by the California Department of Transportation and responses are due by May 28, 2026. The point of contact for queries is JoAnna Nevarez, and accessible versions of the solicitation documents can be requested if needed.

General Info

Exterior renovation in LA: gutters, lead abatement, painting, windows, doors; licensed contractors only; bids due May 28, 2026.

Agency

California Department of Transportation

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

(1)

IFB 07A6421 Painting, Window, Door and Gutter Services in Los Angeles County

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Organization / Agency
California Department of Transportation
Office AddressN/A
Contacts
JoAnna Nevarez

Full Description

Show more
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request at http://bit.ly/dpac-ada or call (916) 654-2852. Contractor shall furnish all labor, materials, supplies, parts, tools, equipment, travel, disposal, permits, and incidentals necessary to remove and install new gutters, lead abatement, prepare surfaces and apply paint, remove existing windows and replace with new windows, remove existing exterior doors and replace with new exterior doors, including re-keying new doors to Caltrans. Bidder shall have at time of bid submittal, continually thereafter, and for the duration of the Agreement, a current and valid B-General Building Contractor license issued by the CSLB license issued by the Contractors State License Board for the type of work to be performed. Contractor or subcontractor performing lead abatement work must possess, at the time of bid submittal, continually thereafter, and for the duration of the agreement, a valid and current Lead Removal Certificate for supervisor(s) and worker(s) issued by the California Department of Public Health (CDPH). Contractor or subcontractor performing lead abatement work must possess, at the time of bid submittal, continually thereafter, and for the duration of the agreement, a valid and current Hazardous Waste Transporter Registration issued by the California Department of Toxic Substances Control (DTSC). Bidder and subcontractor shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder¿s DIR registration; it is not necessary to provide a copy.