Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Virginia was posted on March 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB - Sanitary Sewer Repair Project

Closed
IFB-116252State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The project involves open cut point repairs on two damaged sections of the Town of Middleburg's unreinforced concrete sanitary sewer system located along West Washington Street (Route 50). These repairs are a priority due to the Virginia Department of Transportation's plan to repave Washington Street in late July or August 2026, requiring the repairs to be completed before resurfacing to avoid delays or additional costs. The contract, titled "IFB - Sanitary Sewer Repair Project" with solicitation number IFB-116252, was posted on March 19, 2026, and has a response deadline of April 10, 2026. The Town of Middleburg in Virginia is the awarding agency, and the project will be performed at the specified location on West Washington Street. Interested parties can contact Rhonda North via email or phone for more information. The timing and scope of the project emphasize the need for prompt and efficient repair to support the upcoming repaving schedule.

General Info

Repair two concrete sanitary sewer sections on West Washington St. before 2026 repaving.

Agency

Virginia → Town of MiddleburgView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Middleburg, VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Town of Middleburg
Contacts1 person available
OfficeN/A
Organization / Agency
Virginia → Town of Middleburg
View Agency Profile
Office AddressN/A

Full Description

Show more
This project includes open cut point repairs of two damaged sections of the Town's unreinforced concrete sanitary sewer system along West Washington Street (Rt 50) as shown on the drawings. These repairs will be considered priority for scheduling purposes, as VDOT intends to repave Washington Street in late July/August 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS