This Solicitation opportunity from Utah was posted on September 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves replacing an existing hybrid tank with a reinforced concrete tank for the City of St. George, Utah. Bidders are required to submit a bid bond equal to 5% of their bid, issued by a surety licensed in Utah and on an acceptable form, with the City named as obligee. Additionally, a performance bond covering 100% of the contract value for labor and materials will be mandatory to ensure project completion. The solicitation, identified as "IFB - St George Industrial 2 Mg Tank Project" with solicitation number 24-180, was posted on September 12, 2025, and responses are due by October 7, 2025. The project is estimated to have a contract size between two and five million dollars. The City of St. George reserves the right to reject any or all proposals or to waive formalities or technicalities if deemed in the best interest of the city.
HighAI Summary for 13-St. George Industrial 2 MG Tank Replacement Project Addendum 1: This document is Addendum #1 for the St. George City Industrial 2MG Tank Project dated October 3, 2025. It provides additional information and clarifications to the original contract documents, plans, and specifications dated August 2025. Key updates include mandatory pre-bid meeting attendance, permit requirements, demolition material reuse, and revisions to construction drawings (Sheets T5, T7, T8) with changes to foundation details and pipe flowlines. Specification modifications cover bid item #21 for power service salvage and re-installation, and tank pad construction requirements including structural fill and underdrain system installation. The addendum also includes the mandatory pre-bid meeting attendance record from October 1, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 2024 Lancaster County Culvert Pipe Bid 24-180: This document is a Notice to Bidders for the 2024 Lancaster County Culvert Pipe project, issued on 9/11/2024. It includes key dates such as the question deadline on 9/20/2024 and the response deadline on 9/25/2024. The document provides contact information for the Lincoln Purchasing office and details for shipping and billing to Lancaster County Engineering. It lists multiple bid attachments including instructions to bidders, specifications, and various plan sets and drawings. The document outlines bid attributes, delivery requirements, and compliance certifications such as the U.S. Citizenship Attestation and Foreign Adversary Contracting Prohibition Act. It also specifies bid lines for different types of culvert pipes with quantities and unit prices to be provided by bidders.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2024 Lancaster County Culvert Pipe Bid Specifications: This document contains the 2024 Lancaster County Culvert Pipe Bid Specifications. It references the 2017 Edition of the Standard Specifications for Highway Construction of the Nebraska Department of Transportation and details requirements for culvert pipe types 3 and 5, including corrugated metal and polyethylene pipes. It specifies fabrication, delivery, measurement, and payment methods for culvert pipes and metal headwalls. The document also outlines pipe lengths, markings, and order lists. It serves as a technical guide for contractors on materials, installation, and compensation related to the culvert pipe project.
PDF
PDF, High priority: read this firsttechnical-specifications
HighAI Summary for 5-St. George Industrial 2 MG Tank Bid Technical Specifications 2025-08-26: This document contains the technical specifications for the St. George Industrial 2 MG Tank Replacement project dated August 26, 2025. It outlines the general requirements including project scope, contractor responsibilities, construction timelines, site examination, and construction staking. Key details include maintaining water service during construction, coordination with homeowners and utility agencies, and restoration of affected areas. The document emphasizes the critical project completion time of 365 calendar days and liquidated damages for delays. It also covers contractor responsibilities for protecting existing structures and utilities, handling utility interferences, and ensuring safety and access during construction.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for 6-041-162 STG Industrial 2MG Tank Replacement Construction Plans: This document contains the construction plans for the St George Industrial 2MG Tank Replacement Project in St George City, Utah. It includes a master index of sheets detailing general notes, tank site plans, grading plans, underlayment and drain sections, service line sections, and tank details. The document outlines water and utility notes specifying contractor requirements, standards, and installation guidelines. General construction notes emphasize compliance with city standards, protection of existing improvements, permit requirements, and signage instructions. The plans are essential for guiding the construction and replacement of the 2MG tank, ensuring adherence to local codes and specifications.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond Template for City of St. George Project: This Bid Bond template is for a construction project under the City of St. George. It binds the Principal and Surety to a penal sum as a guarantee for the payment and faithful performance of the contract if the bid is accepted. The bond ensures the Principal will execute the contract and furnish a performance bond and payment bond. The Surety's liability is limited to the penal amount stated. The document includes conditions under which the bond is void or remains in effect, and stipulates that the Surety waives notice of any extension of bid acceptance time. It requires the Surety to be authorized under Treasury Department Circular 570 and to transact business in the project state. The document is signed by the Principal and Surety representatives.
PDF
PDF, High priority: read this firstbid-terms
HighAI Summary for Bid Terms for St. George Industrial 2 MG Tank Project 24-180: This document titled 'Bid Terms' pertains to the St. George Industrial 2 MG Tank Project, reference number 24-180. It outlines the bidder's proposal requirements to the City of St. George, including compliance with contract documents, specifications, and site conditions. The document emphasizes independent bid submission and the City's authority over work quality and contract fulfillment. Key content includes contract time stipulations and liquidated damages: $550 per day for delays beyond contract time and $250 per day for failure to repair deficiencies within 10 days of notification. These liquidated damages are cumulative. The document serves as a critical part of the bidding process, detailing terms bidders must adhere to.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City of St. George Construction Contract Agreement: This document is a construction contract agreement between the City of St. George and a contractor. It outlines the contractor's obligations to commence and complete work, comply with contract documents, and file a notice of commencement. The contract includes payment terms, bonds (payment and performance bonds), and legal provisions binding the parties. The document references various contract documents such as proposals, bonds, specifications, plans, and change orders. It is intended to formalize the construction project agreement, ensuring compliance with Utah state laws and city requirements.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for General Conditions - Construction Contract: This document titled 'General Conditions - Construction Contract' provides comprehensive terms and definitions applicable to a construction contract. It includes an index of 42 sections covering topics such as definitions, additional instructions, schedules, drawings, inspections, changes in work and contract price, time for completion, payments, insurance, subcontracting, safety, and contract closeout. The document defines key contract terms like BID, CONTRACTOR, CONTRACT DOCUMENTS, CHANGE ORDER, and SUBSTANTIAL COMPLETION. It outlines contractor obligations for submitting schedules, reports, and shop drawings, and details the roles of the City and Inspecting Officer. This version appears to be a standard set of general conditions intended to govern the contractual relationship and execution of construction work under the contract.
XLSX
XLSX, High priority: read this firstbid-schedule
HighAI Summary for Industrial 2MG Tank Project Bid Schedule: This document is the bid schedule for the Industrial 2MG Tank Project dated February 21, 2025, for the City of St. George. It lists item numbers, descriptions, quantities, and units for various construction and installation tasks including mobilization, removals, earthwork, installation of a concrete water tank, piping, valves, fencing, and related appurtenances. The schedule provides detailed quantities for each item to be bid on, serving as a critical component for contractors preparing their bids.
PDF
PDF, High priority: read this first4 pages · instructions-to-bidders
HighAI Summary for Instructions to Bidders 11-2023: This document titled 'Instructions to Bidders 11-2023' provides detailed procedures and requirements for bidders responding to solicitations issued by the City of Lincoln and related entities. It covers electronic bid submission, registration on the Owner's Ebid site, deadlines, handling deviations, communication restrictions, and consequences of violations. It also explains clarification processes, independent price determination, brand name alternates, sample demonstrations, delivery terms for non-construction items, and warranty requirements. The document is essential for bidders to understand the rules and expectations for submitting compliant and competitive bids.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid 24-180 Inbound Scales for Weber County Transfer Station: This document is an Invitation to Bid (ITB) numbered 24-180 issued by Weber County for the procurement of new inbound scales and structure for the Weber County Transfer Station located in Ogden, UT. The ITB opens on June 28, 2024, and closes on July 11, 2024. It includes scope of work, specifications, bid submission instructions, and award criteria. Bidders must submit technical bids and questions through the specified procurement portal. The award will be based on the lowest responsive and responsible bid including delivery charges, with the county reserving rights to reject bids or award multiple purchase orders.
PDF
PDF, High priority: read this firstspecial-plan
HighAI Summary for Special Plan for Concrete Headwalls 1-C Dated 4-8-2022: This document is a special plan dated April 8, 2022, detailing concrete headwalls for construction projects. It includes elevation drawings and angle specifications for single, twin, and triple pipe arch and headwall configurations with no skew. The plan provides technical details necessary for fabrication or installation of these headwalls, supporting construction contract requirements.
PDF
PDF, High priority: read this firstinformation-for-bidders
HighAI Summary for St. George Industrial 2 MG Tank Project - Information for Bidders: This document titled 'Information for Bidders' for the St. George Industrial 2 MG Tank Project outlines the bidding process and requirements. It includes the bid timeline with key dates such as bid opening on September 12, 2025, mandatory pre-bid meeting on October 1, 2025, and submission close on October 7, 2025. The document details bid submission instructions, bid bond requirements, contract documents, and conditions for awarding the contract. It emphasizes the importance of the construction schedule and the city's intent to start construction within 30 days of award and complete within 365 days. The document also covers the qualifications and responsibilities of bidders, bond requirements, and the process for contract execution and notice to proceed.
PDF
PDF, Low priorityother
LowAI Summary for A137_FINAL.pdf: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for B-321 Final Plan Set: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for C-331 Final Plan Set: The document titled 'C-331 Final Plan Set' appears to be a final plan set, but the content is empty or unreadable. No specific procurement information or details are available from the provided content.
PDF
PDF, Low prioritycertificate-of-insurance
LowAI Summary for Certificate of Liability Insurance - City of St George: This document is a Certificate of Liability Insurance issued as a matter of information only. It certifies that the insured has policies of insurance covering commercial general liability, automobile liability, umbrella liability, and workers compensation for the policy period 2020-2021. The City of St George is listed as an Additional Insured with primary and non-contributory endorsements and waiver of subrogation. The certificate includes policy limits, coverage types, and cancellation notice requirements. It does not confer rights or alter coverage and is not a contract.
PDF
PDF, Low prioritycertification
LowAI Summary for Certification of Legal Work Status (Contractor): This document is a Certification of Legal Work Status for contractors working on a project. It certifies that the contractor does not knowingly employ or subcontract with entities that violate 8 USC § 1324a regarding employment eligibility. The contractor agrees to require subcontractors to sign similar certifications and to use E-Verify to verify employment eligibility. Non-compliance may result in contract cancellation and suspension from future projects. The document includes spaces for contractor information, signature, and notarization.
PDF
PDF, Low priorityvendor-information-form
LowAI Summary for City of St. George Vendor Information Form 2024: This document is the City of St. George Vendor Information Form for 2024. It collects essential vendor details such as legal business name, DBA or subsidiary names, website, primary remittance address, and accounts receivable or credit contact information including primary contact name, title, phone number, and email address. The form includes a certification statement affirming the accuracy and completeness of the provided information and authorizes the use of the data for city procurement purposes.
PDF
PDF, Low priorityother
LowAI Summary for F-265 Final Plan Set: The document titled 'F-265 Final Plan Set' appears to be a final plan set, but contains no readable content or detailed information. The file is essentially empty or corrupted, providing no usable data for procurement analysis or contract response.
PDF
PDF, Low priorityother
LowAI Summary for G-179 Final Plan Set: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for G-215 Final Plans: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for G-231 Final plans: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for G-255 Final Plans: Document titled 'G-255 Final Plans' contains no readable content or details. The file appears empty or corrupted with no extractable information.
PDF
PDF, Low priorityother
LowAI Summary for H-110 Preliminary Plan Set: The document titled 'H-110 Preliminary Plan Set' appears to be a set of preliminary plans. However, the content provided is empty or unreadable, containing only page split markers without any substantive information.
PDF
PDF, Low priorityother
LowAI Summary for J-002 Final Plan Set: The document titled 'J-002 Final Plan Set' appears to be a final plan set, but contains no readable content or detailed information to determine its specific procurement type or purpose.
PDF
PDF, Low prioritysubcontractor-listing
LowAI Summary for Major Subcontractor Listing Form: This document is a Major Subcontractors Listing form intended for use by the General Contractor to list subcontractors whose proposals were used and who will perform work for each area at the time the proposal is due. It includes instructions to mark 'NA' if not applicable and to provide subcontractor names, addresses, and amounts. The form also requires the General Contractor to list employees acting as foremen for self-performed work. This document serves as a schedule of values for monthly progress payment checks.
PDF
PDF, Low priority1 page · attestation-form
LowAI Summary for United States Citizenship Attestation Form: This document is the United States Citizenship Attestation Form dated January 19, 2010. It is used to comply with Nebraska Revised Statutes §§ 4-108 through 4-114, where the individual attests to their status as either a U.S. citizen or a qualified alien under the federal Immigration and Nationality Act. The form requires the individual's printed name, signature, and date, and includes a declaration that the information provided is true, complete, and accurate for verification of lawful presence in the United States.
PDF
PDF, Low priorityother
LowAI Summary for Y-165 Final Plan Set: The document titled 'Y-165 Final Plan Set' appears to be a final plan set, but the content is empty or unreadable. No further details or specifications are available from the provided content.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
3 updates
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Jul 11, 2024 to Sep 25, 2024. The notice title changed. NAICS code added: 237310. The notice description changed. The point of contact changed.
Notice updated
Response deadline changed from Sep 25, 2024 to Feb 21, 2025. The notice title changed. NAICS code changed from 237310 to 722320. The point of contact changed.
Notice updated
Response deadline changed from Feb 21, 2025 to Oct 7, 2025. The notice title changed. NAICS code changed from 722320 to 237110. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Replacement of an existing hybrid tank with a reinforced concrete tank.
Every BID shall be accompanied by a bid bond in the amount of 5% of the BID, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George.
The 100% performance – labor and materials bond will be required on this project.
The City of St. George reserves the right to reject any or all PROPOSALS or to waive any formality or technicality in any PROPOSAL in the interest of the city.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award