Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFPQ - Carpet Replacement in Sacramento County

Closed
03A3909State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Replacement of Gym Floor at Elizabeth Shelton School
Solicitation # 2027-12
The City of Shelton is soliciting competitive bids for the replacement of the gymnasium floor at Elizabeth Shelton School, located at 138 Willoughby Road, Shelton, CT. This project requires the contractor to provide all labor, materials, and equipment for the demolition and replacement of the existing floor, including an allowance for floor leveling. Bidders must provide lump sum pricing for the primary scope and include alternates for the abatement of asbestos-containing materials and the installation of an alternative flooring system, such as a pad and pour polyurethane system. The successful contractor must provide manufacturer and workmanship warranties upon completion, and an abatement certification if applicable. Bids must be submitted via the City e-Procurement Portal by December 4, 2026, at 11:00 am. Requirements for submission include a signed and notarized non-collusion affidavit and a completed vendor questionnaire. The project is subject to Connecticut prevailing wage determinations and requires the contractor to provide both performance and payment bonds before commencing work. Additionally, contractors must comply with non-discrimination and affirmative action provisions, make good faith efforts to employ minority business enterprises, and adhere to all applicable federal, state, and local building codes and environmental regulations.
Board of Education

POSTED

about 21 hours ago

DEADLINE

in 27 days
NAICS: 238330
New
SLED
P-26001 RFP for Pour in Place Playground Surface Repairs and Replacement
Solicitation # P-26001
The Chicago Park District is soliciting proposals under RFP P-26001 for the repair and replacement of Pour-In-Place (PIP) playground surfaces across its existing outdoor playgrounds and any future constructions. The selected awardee must provide all necessary labor, equipment, and materials, including TPV top layers and SBR base layers, to perform corrective maintenance, preventive maintenance, and complete surface replacements. The scope includes specific tasks such as re-capping and site restoration, with a strict requirement that the awardee perform at least 25% of the work using its own forces. Performance is subject to specific operational hours from 6:00 a.m. to 4:00 p.m., Monday through Friday, with emergency response times mandated at two hours on weekdays and twenty-four hours on weekends. Proposals are due by November 30, 2026, via the BONFIRE portal and will be evaluated based on experience (30%), implementation plan and capacity (20%), personnel qualifications (20%), and cost reasonableness (20%). To be eligible, firms should have at least five years of experience and a proven reputation for servicing large-volume commercial customers. The contract requires strict adherence to non-discrimination laws, including the Illinois Human Rights Act and the Public Works Employment Discrimination Act. Administrative requirements include submitting itemized invoices in triplicate to the Office of the Comptroller, with payments processed within thirty days in accordance with the Local Government Prompt Payment Act.
Chicago Park District

POSTED

about 21 hours ago

DEADLINE

in 23 days

General Info

Place of Performance

CA, USA

Set-Aside

small_business

Documents

1
PDF, High priority: read this firstifpq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
**Certified SB, including MB, SB-PW, or a DVBE Only** The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request to contact@example.gov or call +1 (555) 000-0000. Furnish all labor, tools, equipment, Modular Systems Furniture (MSF) lifting system, materials supplies, parts, permits, protective covering, incidentals, and travel necessary to remove and legally dispose of existing carpet and baseboards and furnish, prepare, and install new carpet and baseboards in the Caltrans Department of Transportation District 3 office, first and second floor offices approximately 13,823 square feet (sq ft).

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project scope covers the segment from 0.1 mile north of Route 1 at Leggett to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key work activities include the placement of hot mix asphalt, replacement of signs, and improvements to drainage systems. The estimated cost for the project is 24 million dollars, with a required bid range of 140 to 200 working days. Bids are set to open on December 10, 2026, and job site activities must commence within 55 days of contract approval by the Attorney General. The contract is governed by 2025 Standard Specifications and Standard Plans, with specific modifications detailed in the Special Provisions across multiple divisions, including earthwork, surfacing, structures, and electrical work. Performance is subject to strict environmental and technical constraints, such as limiting work within drainage channels to the period between June 15 and October 15. Compliance requirements include Buy America/Build America standards, prevailing wage rates as determined by the California Department of Industrial Relations, and specific certifications for small businesses and Disabled Veteran Business Enterprises. Additionally, the contractor must designate an on-site safety representative and adhere to rigorous quality assurance standards for concrete and electrical components.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS