Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on May 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IL 9 & Hershey Rd Infrastructure Improvements: Policy, Overlay, ADA Upgrades, Curb/Gutter, and Signal Replacement

Closed
224-70F21 State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334290
New
DIBBS
INTERFACE UNIT, COMMUNI
Solicitation # SPE4A7-27-T-2289
Solicitation SPE4A7-27-T-2289 is a request for quotations issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of three interface units for communication equipment, identified by NSN 5895-01-739-0196. The requirement specifies parts from Watlow Electric Manufacturing Co (P/N 2292-6980 and PM6C1CJ-ARAAVWP). Delivery is required within 146 days after order, with a need ship date of April 1, 2027, and an original required delivery date of August 13, 2027. The items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the destination. Quality assurance follows MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for sample lots under MIL-STD-105/ASQ Z1.4. Administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing and payment. The solicitation incorporates several federal regulations, including the Buy American and Balance of Payments Program, DFARS cybersecurity reporting requirements, and prohibitions on covered telecommunications equipment. Award may consider the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 23 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves comprehensive infrastructure improvements along Illinois Route 9 from west of Towanda Avenue to Carnahan Drive east of Bloomington, as well as on Hershey Road from Lamon Drive to Castleton Drive within Bloomington, covering a total length of approximately 2.189 miles. The scope includes implementing a designed overlay, upgrading ADA accessibility features, installing new curb and gutter systems, and replacing traffic signals to enhance safety and traffic flow. The project aims to modernize and improve transportation infrastructure in the specified areas, ensuring compliance with accessibility standards and traffic management needs. The solicitation for this project was posted on May 15, 2025, with a response deadline set for June 13, 2025. The contract is valued between five million and fifteen million dollars and is managed by the Illinois Department of Transportation Construction. The project falls under NAICS code 334290, indicating a focus on electrical and electronic component manufacturing, likely related to traffic signal equipment. This comprehensive upgrade aims to improve roadway safety, accessibility, and traffic efficiency in the Bloomington area.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois Department of Transportation Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS