Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IMPELLER, FAN, AXIAL

Closed
SPE8E7-26-T-3297Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
Federal
Dust Collector with Installation
Solicitation # FA488726Q0054
Solicitation FA488726Q0054 is a Firm-Fixed Price contract for the procurement and installation of a wood dust collection and ambient-air filtration system at Building 948, Luke Air Force Base, Arizona. The requirement consists of two primary line items: the provision of one 7.5 HP dust collector meeting specific salient characteristics, including NFPA 664 compliance and a 230-gallon dump bin, and the professional installation of the unit, including new galvanized ducting, a custom capture plenum, and electrical work. The project requires the removal of the old system and all new packaging, with a mandatory minimum 12-month parts and labor warranty. The required delivery and completion date is December 10, 2026. This is a total small business set-aside with a 10 percent price evaluation preference for HUBZone small business concerns. Award will be made to the technically acceptable offeror with a Green or better Supplier Performance Risk System rating and the lowest Total Evaluated Price. Technical acceptability is determined on a pass/fail basis covering delivery schedule, technical approach, and material specifications. Prospective contractors must coordinate base access through the contracting officer, providing REAL ID compliant identification and vehicle documentation. It is noted that funds are not presently available, and no award will be made until such funds are secured. All invoicing and payment processing must be conducted through the Wide Area WorkFlow system.
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract pertains to the procurement of one axial fan impeller with part number 50204-1 and NSN 4140-01-670-5064, supplied by MEGGITT (NORTH HOLLYWOOD), INC. The item is subject to covered defense information requirements and must be delivered FOB origin within 167 days of contract award, with no tolerance for quantity variance. Inspection and acceptance occur at the destination, and packaging must strictly comply with MIL-STD-2073-1E and MIL-STD-129, including specific packaging methods, materials, and marking guidelines. Palletization follows DLA’s RP001 packaging requirements, and no special marking is required. The delivery address is the DDSP New Cumberland Facility in New Cumberland, Pennsylvania, with a required ship date of January 4, 2027, and an original delivery deadline of February 21, 2027. Transportation logistics are governed by DLA procedural notes C19 and C20, and the solicitation was issued under contract number SPE8E7-26-T-3297 with a response deadline of July 20, 2026, under the NAICS code 333413 for aerospace product and parts manufacturing. The primary point of contact is Kelly Mitchell of the Department of Defense.

General Info

Axial fan impeller NSN 4140-01-670-5064 solicited by DLA, due July 20, 2026, for U.S. performance.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment ManufacturingView NAICS

Place of Performance

USA

Set-Aside

NONE

Documents

(1)

SPE8E7-26-T-3297.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressUSA

Full Description

Show more
IMPELLER, FAN, AXIAL NSN/Part Number: 4140-01-670-5064 Purchase Request: 7017422161QTY: 1

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency

NAICS: 335910
New
DIBBS
BATTERY, STORAGE
Solicitation # SPE7L7-26-Q-2418
Solicitation SPE7L7-26-Q-2418 is a firm-fixed-price request for quotations issued by the Defense Logistics Agency Land and Maritime for the procurement of sealed lead acid storage batteries, identified by NSN 6140-01-624-9682. The requirement consists of two line items totaling eight units, with two units for item 0001 and six units for item 0002. Approved sources include EnerSys Delaware Inc. (part numbers ODS-AGM6M or PC2250) and Stored Energy Products, Inc. (part number PC2250). These items are designated as critical application items and are restricted source items requiring engineering source approval by the government design control activity. The batteries are classified as Type I (Code H) with a non-extendable shelf life of 12 months. Delivery is required within 60 days after receipt of the order, with shipping terms set as FOB Destination. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements RP001, while hazardous materials must be handled according to IP025 and FAR 52.223-3. Quality assurance will be managed through destination inspection and acceptance using sampling methods such as MIL-STD-1916 or ASQ H1331. Award will be based on cost alone for quotes that conform to the solicitation requirements. Quotations must be submitted by September 21, 2026, and payment will be processed electronically via the Wide Area WorkFlow system.
Battery Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS