Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Independent Assurance Services For Aten Blvd Sidewalk Installation Phase 1 Between Progress Trail & Old Sr-86

Active
20260811018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Imperial is seeking proposals for Independent Assurance Services for the Aten Blvd Sidewalk Installation Phase 1 project, located between Progress Trail and Old SR-86. This federally-funded CMAQ Program project requires a qualified geotechnical firm to verify materials and compaction testing performed by the Geotechnical Quality Control consultant. The scope of work involves taking samples, conducting field and laboratory tests under the direction of the Resident Engineer, and verifying all certifications and testing methods within the public right-of-way. Qualified firms must ensure that all technicians and laboratories hold the necessary Caltrans certifications. Test reports and results must be submitted to the City and the Resident Engineer within 48 hours of activity. These services will be provided on an as-needed basis for the duration of construction. Proposals for solicitation number 20260811018 must be submitted by August 27, 2026.

General Info

City of Imperial seeks geotechnical firms for Aten Blvd sidewalk independent assurance services.

Agency

California → City of ImperialView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Imperial, CA, 92251, USA

Set-Aside

NONE

Documents

(1)

RFP P2026-08 Aten Blvd Sidewalk_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Imperial
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Imperial
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #P2026-08: The City of Imperial is soliciting proposals for Independent Assurance Services for the Aten Blvd Sidewalk Installation Phase 1 project, located between Progress Trail & Old SR-86. This federally-funded project (CMAQ Program) requires a qualified geotechnical firm to provide independent assurance services to verify materials testing, compaction testing, and other geotechnical services performed by a Geotechnical Quality Control consultant. The scope includes taking samples, performing field and laboratory tests as directed by the Resident Engineer, and verifying certifications, tests, and testing methods. All work will be conducted within the existing City of Imperial public right-of-way. IA technicians and laboratories must possess proper Caltrans certifications. Test reports and results are required to be submitted to the Resident Engineer and City within 48 hours of testing activities. The services are anticipated to be on an as-needed basis for the duration of the construction work.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design, bidding support, and engineering services required to replace and abandon the existing Corydon groundwater production well. The scope is divided into two phases: Phase 1 focuses on technical specifications, civil site design, and construction management oversight for the new well and abandonment of the old one; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation design for equipping and commissioning the new facility. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA, SWRCB-DDW, and DWR standards. The contract is a professional services agreement with an estimated total project cost of 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Eligible firms must be Disadvantaged Business Enterprises (DBE) or other small business set-asides. Compliance requirements are extensive, including Build America Buy America (BABA) domestic-content mandates, SAM registration, and strict adherence to federal drug-free and anti-lobbying regulations. Proposals must be submitted via the PlanetBids portal by September 1, 2026, and the project is scheduled to commence on November 2, 2026.
Ardurra Group, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project is a professional services engagement managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District in California. The project involves a two-phase approach to replace the existing Corydon Well. Phase 1 focuses on the design, technical specifications, and bid scheduling for the drilling of a new well and the abandonment of the old one, including full-time on-site construction management. Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new groundwater production well, along with engineering services during construction. The total estimated project cost is 2,260,788 dollars, with a project start date of November 2, 2026, and a final reporting deadline of January 28, 2028. The contract is partially funded by a Department of the Interior Bureau of Reclamation WaterSMART grant, requiring strict adherence to federal procurement standards, including the Build America, Buy America Act and 2 CFR Part 200. Qualified firms, particularly certified DBE and small diverse businesses, are encouraged to apply. Requirements for respondents include providing a detailed project approach, personnel resumes, and evidence of California professional licenses and CARB compliance. Award selection is based on the most advantageous proposal, considering both qualifications and price. The agreement is governed by California law with venue in Riverside County and requires comprehensive bonding, including 100 percent performance and payment bonds, as well as significant general liability and automobile insurance coverage.
GEI Consultants, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details