Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on June 8, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Independent Design Review of Lost Creek Watershed, Structure B-2, Newton County, Missouri

Awarded
AG-7482-S-10-10-0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The USDA Natural Resources Conservation Service awarded Task Order AG-7482-D-10-0003 to URS Corporation under contract AG-3A75-C-09-0022 for the independent design review of Structure B-2 in the Lost Creek Watershed located in Newton County, Missouri. This specific opportunity was restricted to the contractor holding the primary contract. The project requires the provision of all necessary personnel, equipment, labor, materials, and facilities to conduct a technical evaluation of dam design procedures and decisions in accordance with the National Engineering Manual. The primary objective of this review is to ensure the functional adequacy, structural soundness, and safety of the dam design to prevent potential loss of life or property damage. The contractor is responsible for verifying that the design addresses all safety deficiencies, meets stated objectives, and complies with the most stringent NRCS or state policies. This involves evaluating the appropriateness of analysis methods and assumptions to ensure the final design is consistent with industry practices for similar structures.

General Info

Agency

N/A

Contract Value

$19,490

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Judith A. WeberContracting Officer

Full Description

Show more
RECOVERY - TAS::12 1142::TAS THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS ONLY AVAILABLE TO THE CONTRACTOR UNDER CONTRACT NO. AG-3A75-C-09-0022. RECOVERY - The USDA, Natural Resources Conservation Service (NRCS) awarded Task Order No. AG-7482-D-10-0003 to URS Corporation, under Contract No. AG-3A75-C-09-0022. The Contractor shall furnish the personnel, equipment, labor, materials, transportation, and facilities required to perform the services described herein: I. Purpose The Contractor shall perform an independent review as required by the policy of the USDA'Natural Resources Conservation Service as stated in the National Engineering Manual (NEM) Part 501.05(a), Part 520.26 and Part 511.05(b). The NEM defines independent review as an examination and evaluation of procedures used and decisions made during the design of a dam by peers from outside NRCS or from an organizational unit other than the one responsible for the design. The NEM requires an independent review of designs for engineering job class VII and other projects, as determined, based on their complexity and potential hazard. The Contractor shall assume responsibility, along with the designer, for the functional adequacy and structural soundness of the design, except in those instances where the contractor's recommendations are not incorporated into the final design. The Contractor's capability must be equal to that needed to independently perform the design. Independent reviews are made to ensure that design and construction procedures and decisions reflect safety considerations as well as economy. Dam safety considerations are directly related to the potential for loss of life, damage to valuable property, or disruption of transportation and utility facilities if the dam fails. The classification of dams is determined by the potential for such losses and damage (see NEM 520.2l). The Contractor shall determine whether the methods of analyses are appropriate and the assumptions are justified by the site conditions, as well as whether the results are reasonable. The Contractor shall ensure that the design: - Addresses all potential dam safety deficiencies - Safely and effectively meets the stated objectives - Addresses unique site conditions - Is consistent with industry practice for similar structures - Generally complies with, or has appropriate variances to, the more stringent of NRCS or applicable state policy and criteria.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS