Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Industrial Control Component Supply

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Industrial Control Component Supply involves the procurement and delivery of industrial control hardware for prime contractors working on Alameda County Water District desalination facility projects. The scope of work includes the supply of PLC CPUs, I/O modules, power supplies, and NEMA-rated enclosures, with a requirement that the provider be an authorized distributor of the specified PLC brand. Hardware components must be delivered directly to the site or the fabricator. The contract is associated with NAICS code 423610 and was posted on November 20, 2026, with a response deadline of December 17, 2026. There is no specified set-aside status for this opportunity. Interested parties can find further details through the provided Bonfire hub link for the Alameda County Water District in California.

General Info

Subcontract for industrial control hardware supply for Alameda County Water District desalination projects.

Documents

This scope was carved out of 21437.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DESAL FACILITY HOT STANDBY PROGRAMMABLE LOGIC CONTROLLER AND REMOTE I/O DROP FABRICATION

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom DESAL FACILITY HOT STANDBY PROGRAMMABLE LOGIC CONTROLLER AND REMOTE I/O DROP FABRICATION
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda County Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies industrial control hardware for prime contractors on Alameda County Water District desalination facility projects. Procures and delivers PLC CPUs, I/O modules, power supplies, and NEMA-rated enclosures. Must be an authorized distributor of the specified PLC brand. Delivers specified hardware components to the fabricator or site.

Similar Contracts

Same NAICS industry code

NAICS: 423610
New
SLED
Security System Parts
Solicitation # 2627-656JW
Charlotte County Public Schools is soliciting bids for the procurement of high-quality security system parts and electronic hardware to maintain, repair, and upgrade current systems to enhance the safety of students, staff, and visitors. The scope of work includes the delivery of various security components, such as Aiphone video door stations, master touchscreens, Linear micronodes, and HID proximity readers, with a requirement for 20 units of each specified item. All products must be delivered in new condition on an FOB Destination basis, meaning proposed prices must include all shipping, handling, and delivery costs. Proposals must be submitted electronically via BeaconBid by 2:00 PM EST on January 8, 2027. Required documentation includes a pricing submission in Excel format, a narrative submission form, and a copy of the SunBiz Detail showing the corporation has been active for at least six months. Vendors must be actively registered in the federal System for Award Management (SAM.gov) and submit several certifications, including those regarding a drug-free workplace, debarment, lobbying, and public entity crimes. The district may evaluate proposals based on the vendor's capability, integrity, and financial ability, with local preference governed by CCPS Board Policy 6450. There is no specific set-aside status for this solicitation.
Charlotte County Public Schools

POSTED

about 18 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Alameda County Water District

Same awarding agency

NAICS: 541330
SLED
MSJWTP Tank Decommissioning and Building Systems Modification
Solicitation # 21121
The Alameda County Water District is soliciting proposals for professional engineering consulting services for the Mission San Jose Treated Water Tank Decommissioning and Building Systems Modification project. The scope of work focuses on decommissioning the treated water tank and implementing critical infrastructure upgrades, including fire suppression modifications using non-potable water from the South Bay Aqueduct, upgrading the Ohlone Regulator to Zone 3, and integrating new controls into the SCADA system. Additional requirements include evaluating HVAC infrastructure, performing hazardous waste material sampling, and providing CEQA compliance support. Key deliverables consist of a Basis of Design report, verified as-built drawings in PDF and AutoCAD formats, and a comprehensive Field Commissioning Plan and Report for the Building Management System. Proposals must be submitted electronically via the Bonfire portal by December 1, 2026, divided into a technical proposal volume and a separate cost data volume. The contract will be awarded based on best value, evaluating the proposed scope of work, qualifications of key personnel, references from the past six years, the project schedule, and the estimated level of effort. Compensation is structured on a time and materials basis with a not-to-exceed cost ceiling, with monthly invoicing and a 45-day payment term. Notably, the treated water tank cannot be taken out of service before March 1, 2027. Selected consultants must comply with California prevailing wage laws and maintain required workers compensation insurance.
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 10 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS