This Government Contract opportunity from Department Of Defense was posted on January 25, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Industry Day Notice: Indian River Lagoon - South C-23/24 Stormwater Treatment Area & Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir

Closed
W912EP21Z0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bids for Phase 1 construction of Henry H. Bradby Park in Rushmere, Isle of Wight County, Virginia. The project involves the development of a 51.67-acre county-owned parcel, with approximately 6.63 acres of land disturbance and 45.038 acres remaining as undisturbed open space. The scope of work includes site preparation, clearing, demolition, grading, drainage, and the installation of erosion and sediment control and stormwater management facilities. Additionally, the contractor will construct parking trails, recreational facilities, site furnishings, and landscaping, all while adhering to the 2018 Virginia Statewide Building Code and the latest Virginia Stormwater Management Handbook. The project is funded via the National Park Service's Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with the Federal Civil Rights Act of 1964. Award will be granted to the lowest responsive and responsible bidder. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Financial requirements include a 5% retainage on construction projects and the provision of performance and payment bonds, with a specific bid bond required for bids exceeding 500,000 dollars. Bids must be submitted through the designated procurement portal by November 16, 2026.
Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 5 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Documents

4

CERP_C2324STA_IntermediateATRBCOES_SPECS_marked.pdf

PDF

Full+Set+Intermediate+BCOES+C-23-24+STA+2020-11-05_marked_Part1.pdf

PDF

Full+Set+Intermediate+BCOES+C-23-24+STA+2020-11-05_marked_Part2.pdf

PDF

Industry+Day+Slides+-+IRLS+and+A2+Reservoir.pptx

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

event

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
INDUSTRY DAY Indian River Lagoon South (IRL-S) Project, C-23/C-24 Stormwater Treatment Area and Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project DATE: Monday, Janaury 25, 2021 TIME: 9:00 AM Eastern Time LOCATION: WebEx Presentation (a slide show will be posted following the event). Join from the meeting link: https://usace1.webex.com/usace1/j.php?MTID=mb8315e3fa3201c284b2808a874e3c8e5 Join by meeting number: Meeting number (access code): +1 (555) 000-0000 Meeting password: VVerX6ex*76 Tap to join from a mobile device (attendees only): +1 (555) 000-0000,,1991962424## Join by phone: +1 (555) 000-0000 US Toll Free All interested parties must contact Mr. Timothy Humphrey via email at contact@example.gov and Ms. Tedra Thompson via email at contact@example.gov no later than January 22, 2021 by 4:00pm EST to confirm your attendance. The email subject line should be addressed as - Industry Day Request - (Company Name) - IRL-S and EAA and include the following information: Your Company Name Point Of Contact Company Address Phone Number Email Address Duns Number Cage Code Business classification (Large Business, Small Business, Small Disadvantage Business, 8(a) Small Business, HUBZone, SDVOSB or WOSB) IRL-S PROJECT DESCRIPTION: The work associated with IRL-S includes construction of a stormwater treatment area consisting of two contiguous cells (about 410 acres) west of County Road (CR) 613, and three contiguous cells (about 1,560 acres) east of CR 613. Cells are parallel, flowing west to east, and consist of about 17,690 feet of perimeter levee and about 3,950 feet of cell division levee west of CR 613, and about 34,240 feet of perimeter levee and 2 cell division levees of about 12,190 and 9,410 feet east of CR 613. Collection and distribution channels run along the east and west ends of each cell. Work includes construction of one 2-barrel ungated culvert structure (8 feet diameter culverts) under CR 613; one 3-barrel gated culvert structure (5 feet diameter culverts) under CR 609; five gated 8 feet x 6 feet box culverts for release into cells; two ungated 5 feet diameter culverts for boundary seepage return; four ungated 3 feet diameter culverts with weirs for runoff relief; two gated 8 feet x 6 feet box culverts for release from cells; six gated 5 feet diameter culverts with weirs for release from cells; and one gated 7 feet diameter sag culvert under the C-24 canal. Work includes construction of site access from CR 613 and modification of CR 609 and CR 613 roadway drainage (swales and detention features). There is South Florida Water Management District (SFWMD) owned property east of CR 613 and north of the contiguous cells that can be used for staging. SPECIFIC PROJECT CHALLENGES: The work will be divided into four phases including: (i) construction of the S-425 Gated Sag Culvert and site access from CR 613, (ii) construction of the Connection Canal connecting the North St. Lucie River Water Control District (NSLRWCD) C-70 canal to the NSLRWCD C-69 canal, (iii) construction of the two contiguous cells (about 410 acres) west of CR 613 including associated structures, and (iv) the construction of the three contiguous cells (about 1,560 acres) east of CR 613 including associated structures. The Government intends to issue a separate Notice to Proceed (NTP) for each phase. Existing Florida Power & Light (FPL) service towers are approximately 100-ft from the sag culvert centerline on the STA side (east of the C-24 canal). Experienced personnel will be required to avoid this existing infrastructure. In addition, vehicle traffic access must be maintained for FPL to access the project site and existing infrastructure during construction. EAA PROJECT DESCRIPTION: The work associated with EAA will include construction of approximately 7.2 miles of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and an approximate depth of 16.5 feet below natural ground surface. The southern most canal (Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and an approximate depth of 16.5 feet below natural ground surface. The maintenance road and benches will separate the seepage and Inflow/Outflow Canals by approximately 65 feet and will have a minimum crest width of 14 feet approximately 4.5 feet above natural ground surface. Work will also include the crushing, processing, and stockpiling of excavated material within the project limits. Work may also include construction of or modification to site access from U.S. Hwy 27 as well as the construction and maintenance of haul roads and associated site drainage features. All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features. SPECEIFIC PROJECT CHALLENGES: The work will require blasting to penetrate sub-surface rock layers prior to excavation of both canals. The work will also occur in the vicinity of pending or ongoing construction activities managed by the SFWMD and Florida Power & Light (FP&L) and will require close coordination with those agencies and their contractors. Further, additional construction contracts for other components of the EAA A-2 Reservoir may be issued during the performance period of this contract that require further coordination with the USACE and their contractors. NOTE: All interested Offerors are required to access Beta.Sam.gov for future updates on these projects.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS