Industry Day - Selma AL Flood Management Risk and Bank
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Army Corps of Engineers, Mobile District, is organizing an industry day for solicitation number W9127827RA009 to discuss a flood risk management and bank stabilization project located near downtown Selma, Alabama. This event serves as a Request for Information rather than a formal Request for Proposal, and no award will result directly from the event. The project is anticipated to be a Design-Build-to-Budget procurement with an estimated construction magnitude between 30 and 40 million dollars. The industry day is scheduled for October 28, 2026, at the Mobile District Annex Building in Mobile, Alabama. The technical scope of the project involves the design and construction of approximately 1,000 linear feet of soldier-pile wall along the Alabama River with a top elevation of 100-ft NAVD88, a secondary retaining wall at 110-ft NAVD88, and rip-rap protection at the toe of the wall at 90-ft NAVD88. Key technical requirements include the use of prestressed ground anchors based on Post-Tensioning Institute recommendations and the implementation of vibration monitoring and mitigation strategies to protect nearby historic structures. The project falls under NAICS code 237990.
General Info
Place of Performance
Selma, AL, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.
The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Annex Building, 201 Saint Michael St, Mobile, AL 36602.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → US Army Corps Of Engineers
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
