Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 17, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Industry Engagement for Construction of New Soo Lock Chamber

Closed
PANGLR20P0000001990-NewSooLockChamber-IndustryEngagementFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 7 hours ago

DEADLINE

N/A

General Info

Agency

Department Of Defense → Engineer Division Great Lakes And Ohio

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Sault Sainte Marie, MI, 49783, USA

Set-Aside

NONE

Documents

3

NLC+Industry+Engagement_Final_29Jul2020.pdf

PDF

Site+Visit+Roster.pdf

PDF

Soo+Lock+-+NLC+-+Briefing+to+Industry+-+1+Oct+20+For+Posting+on+Beta.Sam.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

special-notice

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Engineer Division Great Lakes And Ohio
Contacts1 person available
OfficeN/A
Organization / Agency
Department Of Defense → Engineer Division Great Lakes And Ohio
Office AddressN/A

Full Description

Show more
*****Update: 19 October 2020 The site visit roster and industry day slides are hereby incorporated. Sandra Kenzie will be replacing Justin Bennett as the Contract Specialist on this project. Her contact info is as follows: Sandra Kenzie contact@example.gov +1 (555) 000-0000 ***** ****UPDATE: 10 September 2020 Interested parties may request a virtual meeting in lieu of an in-person meeting for the Individual Contractor Meetings with USACE to be held on 06-08 October 2020. Please follow the same registration procedures as originally posted. Note: There is a 4-person limit for contractor representatives whether a virtual or in-person meeting is utilized. **** ***UPDATE: 31 August 2020 This update is to incorporate the Contractor Questionnaire, draft Request for Proposal evaluation criteria, and the draft 70% plans and specifications. Contractors that are interested in downloading these files must submit their DD2345 to the Defense Logistics Agency (DLA) for approval OR must have an approved DD2345 on file with the DLA which is within the last 5 years. *** The U.S. Army Corps of Engineers (USACE), Detroit District, is conducting a series of Industry Engagement events from 1 Oct 2020 through 8 Oct 2020 to seek feedback from potential contractors on the New Lock at the Soo Chamber construction at Sault Ste. Marie, Michigan. The intent is for USACE to share the 70% plans with contractors (28 Aug 2020), present an Overview of Chamber Design webinar (1 Oct 2020), conduct an Industry Site Visit (6 Oct 2020), and meet individually with contractors to gain feedback from a contractor perspective towards clarity and constructability of the current plan (6 ? 8 Oct). The 70% Plans will be available for your review on or about 28 August 2020. In order to access the 70% Plans, security clearance is required (see below table). In order to participate in the 01 Oct webinar and/or the 6 Oct site visit, pre?registration is required (see below table). In order to schedule an individual meeting with USACE on 6, 7, or 8 Oct, an appointment is required (see below table). A list of questions for discussion with contractors during the individual meetings will be posted on SAM on or around 28 Aug 2020.***

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS