Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Infrastructure - Invitation to Bid - VULCAN - PARKS WORKSHOP - Roof Replacement

Active
AB-2026-06875International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This infrastructure project involves a comprehensive roof replacement for the Parks Workshop located in Vulcan, Alberta. The scope of work requires the complete removal and disposal of the existing asphalt and felt BUR membrane system, including gravel protection, gypsum board, vapour retarders, insulation, and associated metal flashings. Additionally, the contractor must remove roof-mounted antenna towers and their related components, while carefully storing and reinstalling any exterior instruments or devices displaced during the process. The installation phase includes the placement of new gypsum board on the steel deck, an air barrier, vapour retarder membrane, insulation, composite coverboard, and a new 2-ply SBS membrane system. Key structural and safety additions include new metal flashings, roof drain assemblies, two overflow scuppers, a non-penetrating safety zone warning line, and a grab handle for the roof hatch. The project also requires the fabrication and installation of an engineered fixed roof access ladder connecting lower Roof Area 2 to upper Roof Area 4. Bids for solicitation AB-2026-06875 are due by November 5, 2026.

General Info

Roof replacement for Parks Workshop in Vulcan, Alberta. Bids due November 5, 2026.

NAICS

N/A

Place of Performance

Vulcan, AB, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyInfrastructure
Contacts1 person available
OfficeN/A
Organization / AgencyInfrastructure
Office AddressN/A
Contacts
Rauf RamoozProject Procurement Specialist

Full Description

Show more
Work of this Contract comprises the following: .1 Remove and dispose of existing asphalt and felt BUR membrane system and gravel protection including gypsum board on deck, asphalt vapour retarder membrane, and insulation. .2 Remove and dispose of existing roof related metal flashings and counter flashings. .3 Delete existing roof mounted antenna towers, bases, related cables, and guy wires. .4 Remove, store, and reinstall instruments/devices mounted on the exterior or through the parapet where required to accommodate new roofing. .5 Replacement of metal flashings, roof penetration flashings, and roof drain assemblies. .6 Install two (2) new overflow scuppers where indicated on the Roof Plan drawing. .7 Replace the roof with new gypsum board on steel deck, new air barrier and vapour retarder membrane, new insulation, new composite coverboard, and new 2-ply SBS membrane system. .8 Provide non-penetrating, free-standing safety zone warning line positioned 2m from the roof edge (In accordance with OHS requirements). .9 Install new external corner grab handle on the existing roof hatch. .10 Fabricate and install a new Engineered fixed roof access ladder to the wall from lower Roof Area 2 to upper Roof Area 4.

More opportunities from Infrastructure

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS