Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Infrastructure Surveying and Field Data Collection

Open
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Infrastructure Surveying and Field Data Collection subcontract for the City of Fort Saskatchewan focuses on providing essential survey services for storm drainage projects. The contractor is responsible for deploying survey crews to map underground pipes, verify existing conditions, and analyze lot grading. This work requires the use of professional land surveying equipment and the ability to integrate data with the City's GIS and AutoCAD systems. The primary deliverables include comprehensive surveyed data sets, detailed field notes, and updated infrastructure maps. This project falls under NAICS code 541370 and is performed within Canada. There is no specified set-aside status for this contract.

General Info

Documents

This scope was carved out of AB-2026-07663.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Fort Saskatchewan - Request for Proposal - Storm Drainage Master Plan

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 26 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom City of Fort Saskatchewan - Request for Proposal - Storm Drainage Master Plan
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Fort Saskatchewan
ContactsNo contacts available
OfficeN/A
Organization / AgencyCity of Fort Saskatchewan
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Collects missing field data and provides survey services for prime contractors on City of Fort Saskatchewan storm drainage projects. Deploys survey crews to verify existing conditions, maps underground pipes, and analyzes lot grading. Requires professional land surveying equipment and the ability to interface with City GIS/AutoCAD data. Delivers surveyed data sets, field notes, and updated infrastructure maps.

Similar Contracts

Same NAICS industry code

More opportunities from City of Fort Saskatchewan

Same awarding agency

NAICS: 541330
New
International
City of Fort Saskatchewan - Request for Proposal - Storm Drainage Master Plan
Solicitation # AB-2026-07663
The City of Fort Saskatchewan is soliciting proposals for a Storm Drainage Master Plan to serve as the guiding document for existing developed areas. The project aims to align infrastructure designs with current and future weather patterns to reduce flooding and manage surface runoff. The scope includes reviewing existing systems, identifying shortfalls, and recommending upgrades for storm drains, ponds, wetlands, ditches, underground pipes, and lot grading. Key deliverables are divided into three phases: a 75-year lifecycle analysis and timeline, a staging plan for neighborhoods with conceptual cost estimates, and the submission of a draft and final report. All work must adhere to the January 2025 Engineering and Servicing Standards. The contract term runs from the date of execution until December 31, 2027. Proposals are evaluated on a 100-point scale, weighting the work program and schedule (25 points), comparable experience (20 points), staff expertise (20 points), project cost/value for money (20 points), and understanding of requirements (15 points). Mandatory pass/fail criteria include the submission of signed addenda and the completion of Sections 1–3 of the Safety Qualification Form. The selected consultant must maintain a compliant ComplyWorks connection and provide insurance naming the City as an additional insured, with coverage remaining effective for two years post-completion. Payment is processed via monthly invoices with a 30-day payment term, exclusive of GST. There is no set-aside status for this solicitation.
Engineering Services

POSTED

about 3 hours ago

DEADLINE

in 25 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS