Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Initial Electrical Connection and Site Wiring

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 1240.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Used Single-Wide Manufactured Home and Supporting Services for Cool Roofing Research

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Ornl Ut-Battelle Llc-Doe Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs initial electrical connection from site utility source to a manufactured home for prime contractors on Oak Ridge National Laboratory research projects. Installs electrical service drops, panels, meters, and conduits to support continuous HVAC and research instrumentation. Requires licensed electrician and compliance with National Electrical Code (NEC). Delivers functional electrical power supply.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The project involves removing retired aerial fiber lines and splice boxes from utility poles and building 2436, and installing new Belden FS3L0024NS 12 strand OS2 OSP fiber or an equivalent brand to provide network connectivity between the building 2436 network closet and the building 2443 maintenance office. The contractor is responsible for providing all labor, equipment, and materials, including fiber supports, ends, a rack-mounted enclosure, an adapter panel, and lift rentals. Bids are due by October 5, 2026, and must include a signed bid form and a detailed cost breakout on company letterhead. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. Awards will be based on overall best value, and bidders must provide a bid bond guarantee, cashier's check, or money order to be considered. Performance and payment bonds from a surety with at least an A- rating are required for contracts valued at $25,000 or more. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Contractors must provide a Unique Entity ID and comply with FAR regulations regarding business size certification and debarment disclosure. The project is subject to Davis-Bacon Act prevailing wage rates for building construction in Kentucky and requires adherence to strict government security and confidentiality standards for protecting sensitive information. Final acceptance of work is contingent upon satisfactory workmanship and the completion of all punch list items as approved by center and government representatives.
Earle C. Clements Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238210
New
SLED
UPS And In Row Cooling Replacement And Citywide UPS Maintenance Services
Solicitation # 20260930072
The City of Santa Monica Information Services Department is soliciting proposals for a turnkey replacement of the Uninterruptible Power Supply (UPS) system and seven in-row cooling units at City Hall. In addition to the replacement project, the selected vendor will provide citywide maintenance, repair, assessment, and 24/7 support services for UPS, cooling, and environmental monitoring equipment across all City facilities. Replacement cooling units must meet or exceed the performance specifications of existing APC ACRC100 units, and all work must comply with applicable federal, state, and local codes. Key deliverables include a phased implementation plan to ensure continuous operation of critical systems, verification documentation of successful startup and testing, and comprehensive maintenance and warranty documentation. The contract will be awarded to the best qualified firm based on a points-based scoring method that evaluates training, experience, financial resources, and the fairness of the proposed pricing; the City is not required to select the lowest bidder. Proposers must be registered with the California Department of Industrial Relations, hold all required state licenses, and possess manufacturer certification or authorized service provider status for the proposed equipment. Submissions must be uploaded via the OpenGov portal by November 2, 2026, at 3:00pm and must include a detailed cost proposal covering the City Hall replacements, annual citywide maintenance, and burdened hourly labor rates for as-needed repairs. Compliance with the Living Wage Ordinance, OSHA regulations, and prevailing wage requirements is mandatory.
City of Santa Monica

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Energy → Ornl Ut-Battelle Llc-Doe Contractor

Same awarding agency

NAICS: 333243
New
Small Continuous Kraft Digester
Solicitation # 1241
The Center for Research and Advancement of Fiber Products Technologies (CRAFT), through the Department of Energy and ORNL UT-Battelle LLC, is issuing a Request for Interest for a laboratory-scale digester. The required system must accurately simulate continuous Kraft pulping conditions to evaluate cooking chemistry, process performance, and pulp yield, with a specific technical requirement to reliably detect yield changes of approximately 1%. The equipment must offer programmable control over temperature, pressure, residence time, alkali concentration, and liquor-to-wood ratio, utilizing either chip movement or a stationary wood-chip bed with circulated liquor. The final system will be delivered and installed at ORNL facilities in Oak Ridge, Tennessee. This sources-sought notice is for market research and does not constitute a commitment to purchase, though any future contract is anticipated to be firm-fixed-price under NAICS code 333243. Interested providers must submit their responses by October 16, 2026, to Procurement Manager Tess Klatt. Submissions must include a survey of abilities covering Ariba Supplier Portal registration, US Government debarment status, and a three-year history of safety and environmental compliance. Technical responses should detail equipment specifications, performance data regarding repeatability, estimated costs, delivery schedules, and a reference list of relevant project experience.
Sawmill, Woodworking, and Paper Machinery Manufacturing

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 459930
New
Used Single-Wide Manufactured Home and Supporting Services for Cool Roofing Research
Solicitation # 1240
Oak Ridge National Laboratory (ORNL), under the Department of Energy, is soliciting a qualified vendor, property owner, or manufactured housing community to provide a used single-wide manufactured home and a supporting installation site for a four-year cool roofing research project. The preferred home should be approximately 70 feet long and 14 to 16 feet wide with a conventional flat interior ceiling. While cosmetic renovations are not required, the home must be structurally sound and serviceable, specifically regarding the building envelope, roof structure, and electrical systems, to allow researchers to partition the attic into seven test sections for the application of various coatings and sheathing. The selected provider must ensure the site offers open and unobstructed solar exposure to the roof during primary daylight hours and remains the permanent location of the home for the duration of the project. Required site services include electrical power, water, sewer, and reliable internet connectivity for remote data transmission. The vendor is responsible for all transportation, setup, permits, and ongoing maintenance, as well as providing property and liability insurance and physical security measures such as locks and monitoring. ORNL requires reasonable year-round access to the facility and permission to perform research-related modifications to the roof and attic, while the interior must be maintained at temperatures between 68 and 75 degrees Fahrenheit.
Manufactured (Mobile) Home Dealers

POSTED

2 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS