Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Inlet Drive Shoreline Resiliency

Closed
RFB-25031-0-2026/DFState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of St. Augustine is seeking a licensed Florida contractor to undertake shoreline resilience improvements along Inlet Drive, specifically between 117 and 151 Inlet Drive. The project involves constructing approximately 692 linear feet of precast concrete segmented block retaining wall behind the existing coquina block wall adjacent to Salt Run, with the new wall reaching a height of 8.75 feet NAVD88. The scope also includes stormwater infrastructure upgrades, such as raising and replacing existing curb inlets and a 12-inch CMP with a 14x23-inch elliptical reinforced concrete pipe fitted with a tidal check valve. Additional work encompasses filling gaps with Rip-Rap, transitioning between new and existing walls, and minor repairs to a wooden pier, concrete sidewalk, water, and electrical services. All work must be completed by June 1, 2026, and is funded through the Florida Department of Environmental Protection's Resilient Florida Grant Program, with federal requirements applicable. The project emphasizes environmental protection by ensuring all construction occurs above the Mean High Water Level to prevent impacts on surface waters and wetlands. The contract value ranges from two to five million dollars, with a response deadline of November 26, 2025.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of St. Augustine
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The City of St. Augustine is seeking the services of a qualified and licensed Florida contractor for construction of improvements to the existing seawall located along Inlet Drive (between 117 and 151 Inlet Drive) in St. Augustine, Florida. The project (precast concrete segmented block wall with concrete cap, stormwater upgrades, see Bid Tabulation) shall be completed no later than June 1, 2026. This project is currently funded through the Florida Department of Environmental Protection's Resilient Florida Grant Program. The funding is also subject to federal requirements.
The construction scope of work shall include installing approximately 692 linear feet precast concrete segmented block retaining wall behind (landward) the existing coquina block wall that is located adjacent to Salt Run. The existing coquina block wall cap elevation is approximately 4.5 feet (NAVD88). The new retaining wall shall be constructed to an elevation of 8.75 feet (NAVD88) top of wall and will connect to the existing walls that are located on either end of the project.
Additionally, two (2) existing curb inlets and the existing 12” diameter corrugated metal pipe (CMP) with associated stormwater outfalls shall be raised and replaced by 14”x23” elliptical reinforced concrete pipe (ERCP) and retrofitted to include a tidal check valve. Rip-Rap is proposed to fill the gap between the existing coquina wall and the new retaining wall and in areas where the coquina wall is missing. Appropriate transitions from the new wall back to the curb along Inlet Drive are included. Also included is the removal and replacement of a minor section of wooden pier and concrete sidewalk, water service line replacement and electrical service relocation to the pier. Appropriate erosion and sediment control measures shall be utilzed during construction. All work is proposed to be completed above the Mean High Water Level (MHWL), therefore avoiding any impacts to surface waters and/or wetlands.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS