Inspection of a Radial Thrust Bearing Assembly

Closed
W912ES26QA0110001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves a two-phase project for the inspection and potential repair of a radial thrust bearing assembly on a VOSTA HPD 550-1350-280 dredge pump. In the first phase, the contractor is required to conduct a thorough inspection to assess the condition of all components, identify the cause of observed oil leakage, and produce a detailed report with photographic documentation and a repair cost estimate. Upon government approval, the second phase involves performing repairs or replacements using OEM-certified parts following manufacturer procedures to restore full operational capability. The contract emphasizes attention to seal integrity and lubrication, requiring all replaced components to be documented and returned for government inspection. The contractor must follow relevant industry standards and OEM guidelines, ensuring quality workmanship by qualified personnel. Deliverables include the inspection report and repair estimates, with testing and verification of the assembly’s performance after repairs. The project schedule mandates submission of a detailed timeline by mid-January 2026, with all work completed by mid-March 2026. The contractor is responsible for logistics related to shipping the approximately 8,000-pound unit to and from the government facility in Fountain City, Wisconsin, including loading and unloading during specified business hours. Government representatives may oversee the processes to ensure compliance with contractual requirements. This solicitation is a total small business set-aside under NAICS code 333914 and is managed by the Department of the Army’s W07V Endist St Paul office.

General Info

Two-phase inspection and repair of dredge pump bearing with OEM parts, timeline, and government oversight.

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing

Place of Performance

Fountain City, WI, 54629, USA

Set-Aside

SBA

Documents

3

Amendment W912ES26QA0110001 SF 30

PDF, High priority: read this first15 pages · amendment
High

Solicitation W912ES26QA011 for Goetz Radial Thrust Bearing Inspection

PDF, High priority: read this first56 pages · rfq
High

Image+of+packed+RTB.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more

Statement of Work (SOW)


Radial Thrust Bearing Assembly Inspection and Repair



1. Scope


This Statement of Work (SOW) defines a two-part effort for the inspection and repair of the radial thrust bearing assembly installed on the VOSTA HPD 550-1350-280 dredge pump.


Phase 1 – Inspection, Report, and Repair Estimate


The contractor shall perform a full inspection of the radial thrust bearing assembly to document component condition, identify the cause of oil leakage, and produce a written inspection report with a detailed repair/replacement cost estimate. The phase 1 price will include return shipping to the Corps’ FCSB location.


Phase 2 – Repair and Replacement (Upon Government Approval)


Repair or replacement activities shall occur only after the Government issues written approval. The objective is to restore the assembly to full operational capability in accordance with OEM and industry standards.


Oil leakage has been observed at the seals; therefore, special attention shall be given to seal condition, integrity, and lubrication during both inspection and repair.


The Corps reserves the right to compete the repair among other vendors. Should the firm awarded the inspection contract not win the contract for repair work the unit will be, reassembled (if needed), safely packaged, and returned to the Corps’ FCSB location no later than 14 business days from notification.


2. Applicable Documents


The following documents shall guide this effort.


The contractor shall have permission for use and access to the following company provided documents:


  • VOSTA HPD 550-1350-280 Operation and Maintenance Manual
  • OEM technical drawings, specifications, and service bulletins

The work shall comply with the latest revisions of the following standards:


Standard


Description


ISO 13709 / API 610


Centrifugal Pumps for Petroleum, Petrochemical, and Natural Gas Industries (primary heavy-duty pump specification).


ISO 5199


Technical specifications for centrifugal pumps — Class II.


ISO 281


Rolling bearings — Dynamic load ratings and rating life.


ISO 1940-1


Mechanical vibration — Balance quality for rigid rotors.


ANSI/ABMA 9


Load Ratings and Fatigue Life for Ball Bearings.


ANSI/ABMA 11


Load Ratings and Fatigue Life for Roller Bearings.


ANSI/ABMA 7


Shaft and Housing Fits for Metric Radial Ball and Roller Bearings.


ANSI/EASA AR100


Recommended practice for repair of rotating electrical apparatus—Section 2.2 regarding bearings.



3. Requirements


3.1 Phase 1 – Inspection Requirements


The contractor shall:


  • Perform a complete inspection of the radial thrust bearing assembly to identify wear, damage, or defects.
  • Document the condition of all bearing components, including races, rollers, cages, seals, lubrication channels, and other related parts.
  • Evaluate and document the source and extent of oil leakage, including photographs and corrective recommendations.
  • Provide a written inspection report identifying components requiring replacement.
  • Include photographic documentation of all damaged or worn components.
  • Provide a detailed cost estimate for repairs or replacements, including part lead times.


3.2 Phase 2 – Replacement of Damaged Components (Upon Approval)


The contractor shall:


  • Remove and replace only Government-approved components identified in Phase 1.
  • Use OEM-certified replacement parts only.
  • Install components using OEM procedures and correct torque specifications.
  • Apply proper lubrication, seals, and fasteners in accordance with OEM guidance.
  • Document all replaced components with photographs.

3.2.1 Government Approval Requirement


No removal, replacement, or repair work shall begin without written authorization from the Contracting Officer (CO). Any unauthorized repair work shall be performed at no cost to the Government.



3.3 Testing and Verification – to be priced as part of any repair submission.


After completion of approved repairs, the contractor shall:


  • Perform alignment and functional checks.
  • Verify rotational performance, load capacity, and lubrication flow per OEM standards.
  • Provide documentation of all test results.


4. Materials and Workmanship


  • All replacement parts shall be new, OEM-certified, and free of defects.
  • All work shall comply with OEM instructions and accepted industry best practices.
  • Personnel performing the work shall be qualified in heavy-duty pump bearing maintenance.


5. Deliverables


The contractor shall provide:


  1. Phase 1 inspection report, including findings, required replacements, and photos.
  2. Repair cost estimate.


6. Quality Assurance and Acceptance


Government representatives may witness inspection, repair, and testing activities.


Final acceptance shall be based on:


  • Compliance with this SOW


7. Schedule


  • The contractor shall submit a detailed schedule for inspection, reporting, approval, repair, and testing no later than 15 January 2026.
  • All work, to include any authorized repair, shall be completed no later than 15 March 2026.


8. Shipping, Delivery, and Reporting


  • The contractor is responsible for all shipping costs and logistics for transporting the unit to and from their facility.
  • The unit is Approx. 8,000 pounds, is on cribbing and can be loaded and unloaded from/to the Army Corp. facility 0730-1500 Mon-Friday.
  • Loading/unloading from Corp. facility shall be completed by the contractor.  
  • Pick up/Shipping Address:
    431 North Shore Drive
    PO Box 397
    Fountain City, WI 54629
  • All documentation shall be submitted to the Government Technical Point of Contact (TPOC).
  • All replaced components shall be returned to the Government for inspection and final disposition.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 237110
New
Federal
Well Replacement at Lac Qui Parle Project shop site
Solicitation # W912ES27QA002
Solicitation W912ES27QA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a well replacement project at the Lac Qui Parle Project shop site in Watson, Minnesota. This acquisition is a 100% small business set-aside under NAICS 237110, with an estimated construction magnitude between $25,000 and $60,000. The scope of work requires a Minnesota-licensed well driller to install a new well with a 5-inch PVC casing within 30 feet of the existing site, including new underground wiring to the shop building and the installation of a concrete slab around the base of the new well. Additionally, the contractor must abandon the old well by pulling the pump, sealing the casing with bentonite grout, and restoring the surface. The performance period is 205 calendar days, with all work required to be completed by June 1, 2027. Key deliverables include a detailed system drawing submitted prior to the start of work. The project must adhere to the Corps of Engineers Safety and Health Manual EM-385-1-1 and Minnesota Department of Health Rules Chapter 4725. Bids are due by 7:00 AM on October 22, 2026, and must be submitted via Standard Form 1442. The contract is subject to Davis-Bacon Act prevailing wage rates and requires performance and payment bonds. Notably, the St. Paul District does not use Wide Area Workflow for invoicing, requiring contractors to submit payment requests through alternative methods specified in the contract.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 1 day
View Details
NAICS: 333112
New
Federal
Lawn Mower with Trade
Solicitation # W912ES27QA007
Solicitation W912ES27QA007 is a total small business set-aside issued by the Department of Defense for the U.S. Army Corps of Engineers, St. Paul District. The requirement is for the supply and delivery of one new commercial-grade zero-turn mower with 10 hours of use or less to the Orwell Project in Fergus Falls, Minnesota. The contractor is provided the option to accept a trade-in of a 2015 Hustler Zero Turn Mower, which must be taken possession of at the time of the new mower's delivery. The delivery deadline is February 15, 2027, and the contractor is responsible for all transportation and unloading costs to the destination. The contract is a firm-fixed-price arrangement where the award will be made to the responsible offeror providing the most advantageous offer based on price. Compliance requirements include the use of two-dimensional data matrix symbology for item unique identification and adherence to Buy American and domestic commodity preferences. Offerors must be registered in the System for Award Management and submit their quotes in PDF format via the Procurement Integrated Enterprise Environment portal by October 28, 2026. Payment will be made in accordance with the Prompt Payment Act, and invoices must be submitted directly as the St. Paul District does not utilize Wide Area Workflow.
Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 334513
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St Paul District, seeks the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs) and associated factory options. These drives are critical for operations on the Dredge Goetz, specifically supporting the cutter head, main pump motors, ladder, swing and spud drives, and the carriage drive. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. This is a total small business set-aside procurement that will be awarded as a single firm fixed price contract to the responsible offeror providing the most advantageous price. The contractor must deliver the hardware to the Civil Works Service Base in Fountain City, Wisconsin, by February 26, 2027, with the contractor bearing all transportation costs and risk of loss until destination acceptance. Deliverables include the VFD units, a technical data package consisting of OEM manuals and drawings, a certificate of conformance, and a warranty for at least 12 months from commissioning or 18 months from delivery. All units must be 100 percent factory-new, moisture-barrier wrapped, and compliant with IEEE, UL, and CE standards, including Safe Torque Off rated SIL 3 / PL e. Strict marking requirements apply, including permanent OEM nameplates and MIL-STD-129 and MIL-STD-130 compliant labeling. Offers must be submitted in PDF format via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Proposals must include the offeror's Unique Entity Identifier, CAGE code, and a statement of agreement with all solicitation terms. Pricing must be provided in whole penny amounts with shipping costs integrated into the CLIN pricing. The government will evaluate offers based on price, and final acceptance will be executed by the USACE Receiving Official following an inspection for damage and configuration accuracy within 10 business days of receipt.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

8 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS