Install and Repair Monitoring Systems at Dams
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contractor is responsible for fully equipping, installing, and commissioning new PMU-9101-T-WR monitoring units at designated dam sites, encompassing all necessary hardware including solar panels, batteries, controllers, sensor probes, cabling, mounting poles, and ancillary components. All installations must be secured using mechanical fasteners exclusively, with no adhesive or double-sided tape permitted, and each unit must be mounted on a 2-inch diameter steel pole grounded in accordance with standards. Where installed on dam embankments, the monitoring unit must be positioned at least ten feet above ground level, and all cabling must be routed underground from the pole to the shoreline. The contractor must complete work at every listed project site, ensuring proper mobilization, transportation, labor, quality control, and warranty support as part of the full turnkey delivery. Prior to installation, the contractor must obtain formal approval from the Contracting Officer’s Representative for each proposed system location, with all activities governed by the terms of this solicitation issued by the USDA Forest Service, Office in Laurel, Mississippi, for performance in Monroe, Arkansas.
General Info
Agency
NAICS
Place of Performance
Monroe, AR, USASet-Aside
Timeline
Organization & Contact Information
Full Description
- The contractor shall provide all equipment, installation, components, terminals, enclosures, sensor probes, solar panels, batteries, controllers, mounting hardware, footings, cabling, supplies, materials, personnel, supervision, labor, quality control, transportation, shipping, mobilization, activation, incidentals, and warranty support for the completion of work.
- The contractor shall complete work at all listed sites for this project.
- New systems will be PMU-9101-T-WR monitoring units.
- All components must be assembled with hardware fasteners. Double sided tape will not be an acceptable means of assembly.
- The contractor shall mount each new unit on a 2 inch diameter steel pole.
- The contractor shall properly ground each unit.
- Where the pole is mounted on a dam embankment, the monitoring unit shall be 10 feet minimum above ground level.
- Cabling shall be placed underground from the pole to the shoreline.
- The contractor shall request approval from the COR for proposed locations of new systems.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Agriculture → R8 USDA Forest Service
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
