This Solicitation opportunity from California was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Install Concrete Pad For Metal Storage Building At Fire Station #3
Closed
20260625016State & LocalSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Agency
California → City of Santa CruzView Agency
NAICS
238110 - Poured Concrete Foundation and Structure ContractorsView NAICS
Place of Performance
Santa Cruz, CA, 95060, USASet-Aside
NONE
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyCalifornia → City of Santa Cruz
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Full Description
Show more
Bid #DEPT HERE-0313: The project involves the installation of a concrete pad and utilities for a metal storage building at Fire Station #3. The concrete pad must be engineered to support fire apparatus weighing approximately 55,000 lbs. The scope of work includes demolition (saw cutting and removal of existing AC material), utility installation (trenching for electrical and fire sprinklers, and electrical pipe installation), and comprehensive concrete pad installation, which covers subgrade preparation, formwork, rebar, concrete pour, finishing, and building anchorage installation. Additionally, the project requires the removal of an existing storm drain inlet and the installation and connection of a new Bio-Retention Area. The contractor will need to coordinate with pre-selected vendors responsible for electrical systems, above-ground fire sprinklers, and the metal building installation.
