Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

INSTALL WATER PIPELINE LOOP, C-SITE WATER DISTRIBUTION LINE

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Navy, through Navfac Far East, is forecasting a project to install a new water distribution pipeline loop for C-Site. The scope of work involves laying approximately 3,530 linear feet of 6 inch Gray PVC Schedule 40 pipe, which will be tapped into the existing 6 inch main distribution line and looped back into an 8 inch diameter underground main supply pipe located at the corner of Dolphin Way. The project encompasses all necessary infrastructure and site work, including the installation of required valves, valve boxes, and pipe fittings. Additionally, the contractor will be responsible for all trenching, excavation, and backfilling activities required to complete the underground pipeline installation. This effort is categorized under NAICS code 237110 for water and sewer line construction.

General Info

Navfac Far East project to install 3,530 linear feet of water distribution pipeline.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will Install/ lay out new 6" Gray PVC Schedule 40 Pipe diameter water distribution pipeline loop tapped into the existing 6" main distribution line supplying C-Site and loop back into the 8" diameter main supply pipe laid underground located at the corner of Dolphin way approx. 3,530-lf complete with required valves, valve box, pipe fittings and trenching / excavation and backfilling work for underground water pipelines.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Far East

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS