Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation of Air Sparge & Soil Vapor Extraction Wells -125 Canal St, Shelton

Closed
125Canal-06262025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333517
New
Federal
Y-Axis CNC Pressed Explosive Lathe Upgrade.
Solicitation # N00174-26-SIMACQ-10-0104
The Naval Surface Warfare Center Indian Head Division intends to award a firm fixed price, noncompetitive contract to Phillips Corporation Federal Division for a Y-Axis CNC Pressed Explosive Lathe Upgrade. This sole-source procurement is being conducted under FAR 12.102(a) and 41 USC 1901, as the vendor is identified as the only source capable of meeting the government's requirements. The project falls under NAICS 333515 and FSC 3416, with final acceptance of the equipment occurring at the Indian Head, Maryland facility. The scope of work requires the manufacture, inspection, and delivery of a lathe capable of +/- 0.0001 inch positioning accuracy over full X and Z axes travel, verified by laser before shipping. Due to the hazardous environment of explosive charger shaping, the equipment must adhere to strict safety standards, including NFPA 70 and NFPA 496, and must be FM or UL approved. Required electrical ratings include NEMA 7, 9, and 4X to meet NEC Class I and Class II Division 1 specifications. All documentation must comply with MIL-STD-1916, and technical drawings must follow ASME Y14.100 and Y14.5 standards. Contractors must be U.S. citizens to enter the facility and must adhere to FOUO protection standards for Controlled Unclassified Information. The contractor is responsible for all packaging and transportation in compliance with Title 49 of the Code of Federal Regulations. Final payment is contingent upon the delivery of the material, a Certificate of Compliance, and formal government acceptance. Interested parties must submit evidence of capability to Marjorie Gray by November 30, 2026, to demonstrate if competition would be advantageous to the government.
Nswc Indian Head Division

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 333517
New
International
Purchase of a Dual Laser Cutter/ Engraver
Solicitation # 26-58199
The National Research Council Canada is soliciting proposals for the procurement of a Dual Source Laser Cutter/Engraver to support prototyping activities involving the cutting of large plastic sheets and the engraving of plastics, painted parts, and bare metal. The selected system must feature a material processing bed of at least 1000mm x 600mm, an enclosed and interlocked processing area, an aluminum grid cutting bed, and a vacuum table bed. Additionally, the contractor must provide a standalone HEPA/activated carbon air-filtration unit with a minimum flow capacity of 850 cubic meters per hour, all necessary control software and licenses, on-site assembly and installation in M50 Room 278, and basic equipment training. The contract will be awarded to the compliant offer with the lowest evaluated price, provided all mandatory technical criteria are met. Proposals must be submitted in separate technical, financial, and certification volumes by December 4, 2026. The required delivery date for all hardware is March 31, 2027, with shipping terms set as DAP Ontario, Incoterms 2020. The agreement includes a firm unit price payment structure and a two-year warranty on parts and labor. Furthermore, the contractor must adhere to mandatory environmentally preferable packaging requirements, ensuring materials are reusable, returnable, or recyclable.
National Research Council of Canada

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract involves the installation of approximately 20 two-inch diameter PVC air sparge wells and 20 four-inch diameter PVC soil vapor extraction wells at 125 Canal Street in Shelton, Connecticut. The project aims to remediate chlorinated solvents present in the overburden soil and groundwater beneath the site, which consists mainly of sand with some gravel and cobbles. The overburden groundwater is situated roughly 12.5 to 14 feet below ground level. Bidders are invited to submit proposals electronically in PDF format or via mail by July 10th, 2025, to the specified contacts. The contract is managed by the Naugatuck Valley Council of Governments under the Connecticut Department of Administrative Services, with a project budget estimated between $200,000 and $500,000. The primary point of contact for inquiries is Ricardo Rodriguez, reachable by email or phone.

General Info

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Supply of Specialized Hardware (NSN 5340-01-523-9877)Open now, due in 10 days
  • Y-Axis CNC Pressed Explosive Lathe Upgrade.Open now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Naugatuck Valley Council of Gov.
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid for the Installation of Air Sparge and Soil Vapor Extraction Wells Drilling work will consist of installation of approximately 20, two-inch diameter PVC air sparge wells and 20, four-inch diameter PVC soil vapor extraction wells to remediate chlorinated solvents in overburden soil and groundwater beneath the site. Overburden material consists of sand and some gravel/cobbles. Overburden groundwater is located approximately 12.5 to 14 feet below grade. Proposals for the Installation of Air Sparge and Soil Vapor Extraction Wells implementation at 125 Canal Street in Shelton, CT will be accepted at Sign up to see this detail and Sign up to see this detail through July 10th, at 2PM. Proposals transmitted electronically must be submitted in PDF format. Proposals may also be mailed to Ricardo Rodriguez at 49 Leavenworth Street, 3rd Fl, Waterbury, CT 06702.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS