Instrumentation & Control (I&C) System Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Instrumentation and Control System Integration involves the design, supply, and integration of a comprehensive control system for water facility projects within the City of Conroe. The scope of work includes configuring PLC hardware, installing control panels and enclosures according to Section 13315, and interfacing systems with field instruments to deliver a fully operational programmable control and monitoring system. The project requires strict adherence to industry standards, specifically NEMA ICS 2-230, ANSI C37.90A, and IEEE 472-1974. This opportunity falls under NAICS code 541330 and is managed by the Engineering agency in Texas, with a response deadline of September 17, 2026.

General Info

Subcontract for water facility control system integration in Conroe, Texas by September 2026.

Agency

Texas → EngineeringView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-35.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replacement Well No. 5 & Control Building

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design, supply, and integration of the overall Control System for prime contractors on City of Conroe water facility projects. Configures PLC hardware, installs control panels and enclosures per Section 13315, and interfaces systems with field instruments. Ensures compliance with NEMA ICS 2-230, ANSI C37.90A, and IEEE 472-1974. Delivers a fully operational programmable control and monitoring system.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, BIM/3D modeling, and commissioning planning. Additionally, requirements include environmental assessments, permitting support, hazardous materials surveys, and CPM scheduling. Interested firms, specifically those with DBE, MBE, WBE, and OBE certifications, must contact Kiewit to receive an Invitation to Bid via the Building Connected system by the September 11, 2026, deadline. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. Plans and specifications are available for review at Kiewit's Costa Mesa, California office.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Texas → Engineering

Same awarding agency

NAICS: 237110
New
SLED
US 90A at Circle Drive/John Sharp Drive Utility Casings CST2003
Solicitation # 2026-ITB-043
Solicitation 2026-ITB-043 involves the installation of two 24-inch steel utility casings at the intersection of US 90A and John Sharp Drive/Owens Road in Sugar Land, Texas. The project requires the use of trenchless methods to install approximately 360 linear feet of casing for a future water line and 303 linear feet for a future wastewater force main. The scope of work includes the construction of bore and receiving pits, capping and marking casing ends, utility coordination, traffic control, dewatering, excavation, backfill, and the restoration of all disturbed pavement, sidewalks, and landscaped areas. The contractor is responsible for providing all labor, materials, equipment, and supervision, and must coordinate with the City of Sugar Land, TxDOT, Union Pacific Railroad, and other utility owners. Note that the actual carrier water line and force main are not part of this contract and will be installed under a separate project. The procurement process is managed by the City of Sugar Land Engineering department, with a response deadline of September 24, 2026. Bidders must submit a comprehensive proposal package including a signed bid, financial statements, pricing forms, bid bonds, and insurance agreements. The project is governed by the City of Sugar Land Standard Contract for Civil Engineering Construction Projects, which includes provisions for liquidated damages, performance and payment bonds, and compliance with Texas government codes. The contract framework also provides standardized templates for change order requests, addendums, and a final Contractor's Affidavit of Bills Paid to ensure all subcontractors are paid before final settlement.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 18 days
View Details