This Solicitation opportunity from Government of Canada was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Intégration scénographique pour le nouveau toit -treuils de sonorisation et de service

Closed
20148516International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract involves the design, permitting, and construction of a new camera system to enhance security and operational oversight in the Bagwell and North Cargo Operations areas of the Port of Seattle. The project will install a total of 50 high-resolution cameras across 43 locations to improve forensic capabilities and enforce the Port’s movement rules and regulations. Current camera coverage is limited to conveyor systems and security doors, so the new system will significantly expand surveillance along main terminal drive lanes and entrances in the Bagwell area, providing clearer and more comprehensive visual monitoring. In the North Cargo area, flexible surface area monitoring will be implemented using pan-tilt-zoom units that allow user-controlled adjustment to cover gaps and critical zones not currently addressed. All work will be managed by the Aviation Project Management Group under the Port of Seattle, with point of contact provided by Angela Peterson and Randa Williams. The project falls under NAICS code 238210 for electrical and other construction wiring services, indicating the scope includes both hardware installation and supporting infrastructure upgrades. The solicitation was posted in July 2026 and is intended to improve long-term security posture through advanced, user-controlled camera technology, enabling real-time responsiveness and detailed post-event analysis in high-traffic cargo environments.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle’s Aviation Project Management Group is seeking to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility in SeaTac, which contains per- and polyfluoroalkyl substances (PFAS). The project involves the complete removal of the contaminated foam and associated system components, followed by the design and installation of a full dry fire suppression system. This new system will include tanks, valves, pumps, sprinkler lines, sprinkler heads, and reserve tanks, ensuring compliance with modern fire safety standards while eliminating PFAS contamination. All new components must be integrated with the facility’s existing fire alarm system to maintain operational continuity and regulatory compliance. The work is part of a quick turnaround initiative, emphasizing efficiency and prompt execution. The solicitation, titled Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid), is classified under NAICS code 238210 for fire protection system contractors. It was posted on July 19, 2026, and is managed by the Port of Seattle, with Todd Rehm as the primary point of contact and Pat Nakamura serving as the project manager. The project has no set-aside designation and will be performed at the facility located at 3150 S 160th Street, SeaTac. Interested parties can access further details through the Port’s solicitation portal using the provided UI link. The project represents a significant infrastructure upgrade to enhance safety, environmental responsibility, and system reliability at one of the Port’s key operational facilities.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026The Contract for Electrical Unit Price Portwide 2026 outlines the scope of electrical work to be performed for the Port of Seattle under a unit price format, covering a broad range of activities including installation of raceways, wiring, medium voltage cabling, electrical boxes, transformers, miscellaneous devices, temporary power and lighting systems, as well as testing and grounding—all in strict compliance with applicable code-enforcing agency requirements. The Contractor is responsible for providing all labor, tools, equipment, materials, and incidental items necessary to complete each task authorized by the Port through a formal Work Authorization, ensuring full adherence to the specified standards and safety protocols. All labor must be delivered according to the defined labor classifications listed in the Schedule of Unit Prices, ensuring consistent pricing and qualification standards across tasks. The contract is formally forecasted with a posted date of July 19, 2026, under NAICS code 238210, and is managed by Port Construction Services. Primary point of contact is Heather Bowden, with Lesley Miles serving as Project Manager, both reachable through their respective Port of Seattle email and phone lines. The work is to be performed at locations designated by the Port throughout its facilities, and all activities are subject to the terms outlined in the unit price schedule and authorized work directives.
Port Construction Services

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Well Enclosure and Control Panel InstallationThe contract entails the construction and installation of protective enclosures and electrical control panels at water well sites, requiring specialized work in civil and electrical infrastructure to ensure safe and reliable operation of water well systems. The work is classified under NAICS code 238210, indicating it falls under specialty trade contractors performing construction-related services, and is structured as a subcontract opportunity issued by the City of Elizabeth City in North Carolina. The solicitation was posted on July 18, 2026, with responses due by July 28, 2026, providing potential bidders a ten-day window to submit proposals. Performance location details are unspecified, but the work will occur at various water well sites under the jurisdiction of the City of Elizabeth City, suggesting the need for contractors to be prepared for site-specific conditions and logistics across multiple locations in the region. The subcontract nature implies the winning party will likely be working under a larger prime contractor or municipal initiative, and all work must comply with applicable technical, safety, and regulatory standards for water utility infrastructure. Bidders are expected to demonstrate experience in handling similar construction and electrical installations, with attention to durability, environmental protection, and long-term maintenance accessibility of the enclosures and control panels.
City of Elizabeth City

POSTED

1 day ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Le contrat porte sur l’intégration scénographique pour un nouveau toit, incluant la fourniture et l’installation complète des équipements de scénographie, notamment les systèmes de levage destinés aux installations de sonorisation et le treuil de service de la toiture centrale, ainsi que les systèmes de contrôle et d’automatisation associés. L’entrepreneur est chargé de fournir l’ensemble des ressources nécessaires, soit la main-d’œuvre, les matériaux, les câbles, les conduits électriques, l’équipement, la machinerie, l’échafaudage, les supports, les appareils d’essais et tous les accessoires requis pour la fabrication, la livraison, l’entreposage, l’installation, les raccordements, les tests, la mise en service et la garantie de l’ensemble des éléments définis dans le cadre du projet. Tous les travaux doivent être exécutés selon les exigences techniques et opérationnelles pour assurer la fonctionnalité intégrée et sécuritaire des équipements sur le site de Montréal. L’appel d’offres, identifié sous le numéro 20148516, a été publié le 3 juin 2026 par l’agence Parc olympique, une entité du gouvernement du Canada, et la soumission doit être déposée avant le 9 juillet 2026 à 15 h. Le code NAICS applicable est 238210, correspondant aux travaux de mise en place de systèmes électriques et de finition. Le point de contact principal pour toute question relative à l’appel d’offres est Anie-Claude Vendettoli, autorité contractuelle, joignable par téléphone ou courriel. Le lieu d’exécution des travaux est à Montréal, et l’offre est ouverte sans restriction particulière de mise en réservation.

General Info

Complete installation and commissioning of roof scenographic sound systems and hoist with full turnkey responsibility.

Agency

Government of Canada → Parc olympique

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Montréal, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parc olympique
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Parc olympique
Office AddressN/A
Contacts
Vendettoli Anie-ClaudeContracting Authority

Full Description

Show more
Les travaux consistent principalement en la fourniture de la main-d'œuvre, des matériaux, des équipements, du matériel et des services nécessaires pour exécuter l'installation complète et opérationnelle des équipements de scénographie tels que les moyens de levages pour les [SK1] installations de sonorisation et le treuil de service de la toiture centrale, ainsi que les contrôles et automation associées. L'Entrepreneur devra notamment fournir (et sans s’y limiter) la main-d’œuvre, les appareils, câbles, conducteurs et conduits électriques, la documentation, l'équipement, la machinerie, l'échafaudage, les supports, les services, les appareils d'essais, les matériaux et tous les accessoires nécessaires pour la fabrication, la fourniture, la livraison, l'entreposage, l'installation, les raccordements, les essais, la mise en route et la garantie de l'équipement et des matériaux, pour les ouvrages décrits ci-haut. [SK1]A modifier