This Solicitation opportunity from Department Of Energy was posted on December 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Integrated Biorefinery Facility North High Bay Revitalization Custom Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the design, fabrication, delivery, and commissioning of custom plug-and-play process equipment to revitalize the National Renewable Energy Laboratory’s (NREL) Integrated Biorefinery Research Facility (IBRF) North High Bay (NHB). The overall objective is to enhance piloting capacity for biomass conversion and waste carbon utilization technologies at a scale of approximately one barrel per day. The equipment will support continuous, integrated piloting experiments to advance renewable technologies toward commercial deployment. The scope includes engineering design, procurement, fabrication, factory acceptance testing, delivery, and partial commissioning, emphasizing operational flexibility, safety, value engineering, and compliance with applicable codes such as ASME and industry standards for instrumentation and electrical systems. Key equipment units include a hydroprocessor and a distillation column, for which detailed process design bases, engineering assumptions, P&IDs, and specifications are provided and periodically updated through amendments. The solicitation (RFP SUB-2025-10354) is a best-value, firm fixed-price procurement with an estimated funding range of $750,000 to $3,500,000 and a performance period extending through March 30, 2027. Evaluation criteria weigh technical approach most heavily (45%), followed by experience (40%) and capability (15%), with price as a secondary factor. Technical proposals must demonstrate the ability to meet stringent design requirements, quality standards, and integration with data management systems while maintaining adaptability for future upgrades. The subcontractor is required to submit a comprehensive package including a technical proposal with separate volumes for each unit, payment schedules, and required representations and certifications, with the contract emphasizing government rights to technical data and strict compliance with export control laws. Deliverables and milestones are precisely scheduled, including multiple design reviews, hazard analyses, equipment orders, factory acceptance tests, documentation, delivery, and commissioning. The contract enforces rigorous inspection and acceptance criteria at NREL’s facilities and incorporates clauses governing key personnel, subcontracting plans, organizational conflicts of interest, and intellectual property rights to ensure alignment with NREL’s mission and DOE regulations.
General Info
Place of Performance
Golden, CO, 80401, USASet-Aside
Documents
12AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Analytical Laboratory Instrument SupplyOpen now, due in 25 days
- Scientific EquipmentOpen now, due in 25 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The National Renewable Energy Laboratory (NREL) is revitalizing the Integrated Biorefinery Research Facility (IBRF) North High Bay (NHB) to enhance its capacity for piloting biomass conversion and waste carbon utilization technologies. After the renovation, new process equipment will be required to establish a flexible, the plug-and-play environment for research and testing.
The objective of this project is to design, build and commission process equipment for use in scale-up piloting experiments. Researchers will use this equipment to advance NREL’s mission of developing renewable technologies for commercial deployment.
This project will support the engineering design, procurement, and fabrication of plug-and-play equipment, sized for a production capacity of approximately one barrel per day. The design will prioritize value engineering, operational flexibility, and process safety to maximize scalability and adaptability. By providing standard unit operations, the equipment will make it easier for researchers to test technologies in a continuous, integrated manner, lowering the barriers to conducting pilot experiments.
NREL is seeking additional expertise in the area of this process equipment design, fabrication and procurement for a process of this magnitude.
11/3/25: Amendment 1 posted - Q&A's + added Attachment 5.
11/12/25: Amendment 2 posted - Q&A's.
12/16/25: Amendment 3 posted - Q&A + updated attachments 2 and 3, updated proposal due date to 1/30/2026
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
