Interdisciplinary Research Building Replacement of the Fire Alarm System
Open
State & Local
Response DeadlineDue in 6 days
Solicitation #
PE-51200-RFQ-2027-000000040
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Augusta University is soliciting Construction Management at-Risk (CM/GC) services for the replacement of the fire alarm system in the Interdisciplinary Research Building (IRB), a 211K GSF facility. The project scope includes replacing the fire alarm panel, sensors, horns, strobes, detectors, and the communication backbone, as well as integrating the new system into the existing campus fire alarm mesh network. The estimated construction cost is $3,670,000, with a contract format based on actual cost plus a fixed fee not to exceed a Guaranteed Maximum Price.
The project follows a multi-step selection process. Step I evaluates statements of qualifications based on relevant project experience (45%), suitability to provide services (30%), and firm stability (25%). Finalists in Step II are evaluated on their interview methodology, team communications, project team qualifications, management plan quality, and previous performance. Key milestones include the commencement of design professional services on November 1, 2026, the completion of construction documents in June 2027, and a projected construction start in August 2027. The project requires adherence to the Energy Efficiency and Sustainable Construction Act of 2008 and must achieve Georgia Peach certification upon commissioning. There is no set-aside status for this solicitation.
General Info
Augusta University seeks CM/GC services for a $3.67M fire alarm system replacement project.
HighAI Summary for ADDENDUM 3: This document is Addendum 3, a modification to a procurement solicitation. While the provided content is primarily an image string, the filename and structure indicate it is an amendment to the original solicitation terms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Augusta University Fire Alarm System Replacement - Addendum 2: Addendum 2 for solicitation PE-51200-RFQ-2027-000000040 regarding the Interdisciplinary Research Building replacement of the fire alarm system. Posted on 11/12/2026, this document provides the date, time, and location for finalist firm interviews scheduled for December 12, 2026, at 9:00 A.M. in Conference Room HP 1001.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Augusta University RFQ PE-51200-RFQ-2027-000000040 Addendum 1: Addendum 1 for the Interdisciplinary Research Building Replacement of the Fire Alarm System solicitation (PE-51200-RFQ-2027-000000040), issued by Augusta University on 10/06/2026. This document establishes the date, time, and location for a mandatory walk-thru scheduled for November 5, 2026, at 10:00 A.M. at 1462 Laney Walker Boulevard, Augusta, GA.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CA0BBASE - Basement Design Drawings: A design document dated 1/1/2020 for a basement project, containing approximate measurements and location identifiers for design purposes. It includes a list of reference codes (B063, B000K, etc.) and was drawn by BSM on 10.26.2026.
PDF
PDF, High priority: read this firstfee-proposal
HighAI Summary for Exhibit C - CM/GC Fee Proposal: Exhibit C CM/GC Fee Proposal form for a Georgia project. It captures the Construction Manager/General Contractor's preconstruction fee, construction fee, and maximum preconstruction and construction overhead costs, with blanks for total amounts and signature by the CM/GC officer.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Exhibit D - Preconstruction Costs and Expenses Breakdown: Exhibit D is a preconstruction costs and expenses breakdown table for pricing. It lists supervision and management labor categories, miscellaneous preconstruction expenses, units, labor/material subtotals, and total all preconstruction cost fields. The document appears to be a pricing exhibit dated 8/25/2026 12:32 PM and is intended to support preparation of a bid or proposal with detailed cost inputs.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Exhibit E - General Conditions Breakdown: Exhibit E construction overhead cost breakdown form for a project proposal. It requires offerors to fill in applicable costs for site supervision, office setup, safety/security, temporary utilities, permits, and related jobsite overhead items. The document warns that recategorizing items as fee, cost of work, or by others will be treated as non-responsive. Dated 8/25/2026 and appears to be a pricing/supporting exhibit with line-item cost entries and subtotals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit F - Project Cost Matrix: Exhibit F is a project cost matrix for a construction project at an institution in Georgia. It allocates costs among Construction Fee, General Conditions, and Cost of Work, and lists categories such as site supervision, site office expense, safety and security, cleaning, general equipment, bonds and insurance, and miscellaneous items. The document uses X marks to indicate how costs are assigned, and includes notes explaining the table structure and markings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Interdisciplinary Research Center - 1st Floor Plan: A technical drawing/specification sheet for the 1st floor of the Interdisciplinary Research Center, prepared by the U.S. Army Corps of Engineers Los Angeles District, dated October 26, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Interdisciplinary Research Center - 2nd Floor Base Plan: A technical drawing/specification sheet for the 2nd floor of the Interdisciplinary Research Center project, issued by the Office of Facilities Services (Planning, Design & Construction) in Augusta, Georgia. Dated 10.26.2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Interdisciplinary Research Center - 3rd Floor/Basement Level Plan: Technical drawing/specification document for the Interdisciplinary Research Center project (Project: BASE), dated 10.26.2026. The document provides layout details for the 3rd Floor and Basement Level, including walking areas and staircase configurations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Interdisciplinary Research Center - 4th Floor Base Plan: A technical drawing/base plan for the 4th floor of the Interdisciplinary Research Center, issued by the Office of Facilities Services (Planning, Design & Construction) in Augusta, Georgia. Dated 09.02.2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Interdisciplinary Research Center - Penthouse Base Drawing: A technical drawing/specification document dated 10.26.2026 for the Interdisciplinary Research Center Penthouse project, issued by the Office of Facilities Services Planning, Design & Construction in Augusta, Georgia.
PDF
PDF, High priority: read this firstrfq-rfp
HighAI Summary for Project No. J-473 RFQ/RFP for CM/GC Services: Board of Regents, University System of Georgia RFQ Step I and RFP Step II for Construction Management at-Risk (CM/GC) services for Project No. J-473, Interdisciplinary Research Building – Replacement of the Fire Alarm System at Augusta University, Augusta, Georgia. Solicited August 25, 2026; qualifications packages due October 5, 2026. The document describes the project background, scope, sustainable construction requirements, delivery method, estimated budget of $3,670,000, schedule, CM/GC service requirements, qualifications review process, and submittal instructions, along with exhibits for certifications, affidavits, fee proposal, cost breakdowns, matrix, and disclosure statements.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Augusta University - Interdisciplinary Research Building Fire Alarm System - Q&A Round 1: A Question and Answer (Q&A) document for solicitation PE-51200-RFQ-2027-000000040 regarding the Interdisciplinary Research Building Replacement of the Fire Alarm System at Augusta University. This Round 1 posting, dated 08/27/2026, addresses a supplier inquiry regarding the availability of drawings and specifications, with the issuing officer clarifying that a design professional is currently being selected.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Augusta University IRC CA - Annual NFPA 72 Fire Alarm Inspection Report: Annual NFPA 72 fire alarm inspection and testing report for Augusta University - IRC CA, conducted on 2024-06-27 by Cody Cook of Acom Fire Solutions. The document details the testing of fire alarm devices (pull stations, detectors), power supplies, and system functionality, with all listed components passing inspection.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Bidders/Offerors’ Conference Sign-In Form - PE-51200-RFQ-2027-000000040: A sign-in sheet from a Bidders/Offerors’ Conference held on November 5, 2026, for the State of Georgia Department of Administrative Services regarding the Interdisciplinary Research Building Replacement of the Fire Alarm System (Solicitation PE-51200-RFQ-2027-000000040) at Augusta University.
PDF
PDF, Low prioritycertification-form
LowAI Summary for Exhibit A Certification Form: Exhibit A certification form for a proposal/statement of qualifications. The signer certifies the accuracy and truthfulness of the submitted proposal information, confirms no recent convictions, suspensions, debarments, defaults, or disciplinary actions, and authorizes the Board of Regents to verify information. Includes signature, notary, and commission expiration blocks.
PDF
PDF, Low priorityaffidavit
LowAI Summary for Exhibit B Contractor Affidavit (E-Verify): Exhibit B contractor affidavit under O.C.G.A. § 13-10-91(b)(1) for the Board of Regents of the University System of Georgia. The form certifies that the contractor is registered to use the federal E-Verify work authorization program, will continue using it during the contract term, and will require subcontractors to provide similar affidavits. It includes fields for the contractor name, user identification number, date of authorization, project number/description, execution date, signature, and notarization.
PDF
PDF, Low priorityother
LowAI Summary for Exhibit G - Proposer’s Disclosure Statement: Exhibit G is a Proposer’s Disclosure Statement for a Georgia public project. It requires the proposer to disclose prior business transactions with BOR, any gifts or hospitality provided to BOR, the using agency, or the end-user within the stated periods, and any actual or potential conflicts of interest. The form must be dated and signed by an authorized signatory and submitted with the proposal.
This project will replace the fire alarm system in the Interdisciplinary Research Building (IRB), a 211K GSF building built in 1995 containing 25% of the research laboratory, lab service, and animal facilities on the Health Science campus. The scope includes the existing fire alarm panel, sensors, horns, strobes detectors and communication backbone, and the connection of the new system into the existing campus fire alarm mesh network.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.