Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Interior and Exterior Painting Maintenance Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Interior and Exterior Painting Maintenance Services involves providing professional painting services for prime contractors on facility projects within the Fontana Unified School District in Fontana, California. The scope of work includes comprehensive surface preparation such as cleaning, scraping, sanding, and patching, followed by the application of coatings to a variety of materials including cement, plaster, stucco, concrete, masonry, wood, and metals. Specialized requirements include the use of electronic moisture meters, backrolling techniques, and the application of weather-resistant two-component polyurethane for exterior metal surfaces. All work must be completed to deliver finished surfaces that adhere to Section 09 90 00 specifications. The opportunity was posted on October 6, 2026, with a response deadline of November 2, 2026. This project falls under NAICS code 238320 and is specifically designated for maintenance services within the district's facilities.

General Info

Painting maintenance subcontract for Fontana Unified School District facilities, deadline November 2, 2026.

Place of Performance

Fontana, CA, 92335, USA

Set-Aside

NONE

Documents

This scope was carved out of 26/27-0012.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Interior & Exterior Painting - Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fontana Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs painting services for prime contractors on Fontana Unified School District facility projects. Prepares surfaces via cleaning, scraping, sanding, and patching; applies coatings to cement, plaster, stucco, concrete, masonry, wood, and metals. Uses electronic moisture meters and backrolling techniques. Applies weather-resistant two-component polyurethane for exterior metal. Delivers completed, finished surfaces per Section 09 90 00 specifications.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
GROVE STREET TANK REHABILIATION
Solicitation # DPW-27-440-05
The Town of Hopkinton Department of Public Works is soliciting bids for the Grove Street Tank Rehabilitation in Hopkinton, Massachusetts, under solicitation number DPW-27-440-05. The project involves a comprehensive interior and exterior coating rehabilitation of a welded steel tank, including the installation of a passive mixing system, vault rehabilitation of process piping and valves, and welding repairs to address corrosion and metal loss. Additionally, the scope requires a licensed electrician to perform electrical modification work and the demolition of three exterior electrical panels. The contract is governed by EJCDC C-700 Standard General Conditions and various Massachusetts General Laws, with a required completion timeline of seventy-five days for the fall work. The contract will be awarded to the lowest responsible and eligible bidder. Bidders must provide a bid deposit of at least 5 percent of the proposed work value, and the successful awardee must provide a 100 percent performance bond and a 50 percent labor and materials payment bond. Key requirements include strict adherence to paint age limits, where no paint manufactured more than six months prior to application is accepted, and compliance with OSHA 10-hour safety training for all employees. The contractor is responsible for providing an approved air quality containment plan, conducting pre- and post-construction soil analysis, and maintaining detailed records for six years after final payment. Final acceptance is contingent upon the submission of as-built record drawings.
Town of Hopkinton

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238320
New
SLED
Lincoln Leisure Center Plaster Repair
Solicitation # 2027-17
The City of Bloomington, Illinois, through its Parks and Recreation department, is soliciting bids for solicitation number 2027-17 to perform plaster repair and repainting at the Lincoln Leisure Center located at 1206 S Lee. The scope of work involves repairing deteriorated plaster surfaces and repainting ceilings and walls in both the North and South stairwells to match existing finishes. Work must be performed Monday through Friday between 7:00 AM and 3:00 PM. Bids are due by November 19, 2026, via the ProcureNow e-Procurement portal, with the award being granted to the lowest responsible and responsive bidder. Evaluation factors include service quality, conformity with specifications, delivery terms, and qualifications, with a local preference policy applied to qualified local consultants. The contract requires strict adherence to Illinois Prevailing Wage laws, including the submission of certified payroll. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract price within ten business days of the award. Compliance certifications are required for the Gift Ban Act, the Substance Abuse Prevention Program, and various Illinois Public Acts and federal regulations. Additionally, bidders must submit a Contract Diversity Goal Form and an Equal Employment Opportunity Plan, with a requirement for awarded contractors to provide a Good Faith Effort end-of-project summary. Payment terms are generally NET 45 days, contingent upon the City's inspection and satisfaction with the completed work.
Parks & Recreation

POSTED

about 8 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → Fontana Unified School District

Same awarding agency

NAICS: 238320
SLED
Interior & Exterior Painting - Maintenance
Solicitation # 26/27-0012
The Fontana Unified School District is soliciting bids for an indefinite-quantity unit price contract for interior and exterior painting, waterproofing, and weatherproofing maintenance services across various district sites in Fontana, California. The estimated aggregate contract value is 1,500,000 dollars. The scope of work includes comprehensive surface preparation, coating application on diverse materials such as cement, stucco, wood, and metal, and strict adherence to district paint specifications and manufacturer recommendations. The project is divided into two separate award categories: Category A for Interior and Exterior Painting and Category B for Waterproofing and Weatherproofing. Awards will be made to the lowest responsive and responsible bidder for each category, with requirements including a Class C-33 license for Category A and a D-51 authorization for Category B. Bidders must submit their proposals via the OpenGov portal by November 2, 2026, while original bid security must be delivered physically to the district office. Required submissions include a unit price sheet, various certifications regarding non-discrimination, clean air and water, and DVBE participation, as well as a prevailing wage certification. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount and comply with California Labor Code prevailing wage requirements and DIR registration. Invoicing must be itemized by bid item number and include material costs with a contracted markup percentage, with payments processed through the District Accounts Payable Department.
Painting and Wall Covering Contractors

POSTED

23 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS