Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Interior Construction & Seismic Anchorage

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Berkeley, CA, 94704, USA

Set-Aside

NONE

Documents

This scope was carved out of 12069A.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Latimer D19-D21 New Microscope Lab

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Latimer D19-D21 New Microscope Lab
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, Berkeley
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs interior framing and structural anchorage for prime contractors on University of California, Berkeley facility projects. Constructs sub-rooms in D21, converts D19 into a Lab Control Room, and provides seismic anchorage for laser tables using specialized anchors and bolts. Complies with seismic safety codes for laboratory equipment. Delivers completed room partitions and anchored equipment bases.

Similar Contracts

Same NAICS industry code

NAICS: 238390
New
Springdale JCC – Gymnasium Foundation Waterproofing
Solicitation # springdale-jcc-gymnasium-foundation-waterproofing
The Career Systems Development Corporation is seeking quotes for gymnasium foundation waterproofing at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to mitigate groundwater seepage and excessive humidity through a comprehensive scope of work that includes excavation, the installation of a minimum 24-inch high waterproof membrane on the foundation perimeter, and the implementation of a complete sump pump system with associated drainage pipes, liners, and alarms. Additionally, the contractor will be responsible for installing discharge lines, dedicated electrical outlets for pumps and dehumidifiers, and performing hydrojetting of existing drain lines. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. All work must comply with the Davis-Bacon Act, specifically Wage Determination OR20260100, R.1, and contractors must provide a valid Oregon CCB contractor's license number. Quotes must be itemized by parts and labor and remain valid for 90 days from the closing date of December 11, 2026. For projects valued at $100,000 or more, payment and performance bonds are required upon award. The successful contractor must provide a minimum 2-year materials and workmanship warranty along with appropriate manufacturer warranties. Quotes for unit replacement must include all necessary support equipment, such as dumpsters, temporary toilets, and perimeter security.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details

More opportunities from University of California, Berkeley

Same awarding agency

NAICS: 541310
New
SLED
Latimer D19-D21 New Microscope Lab
Solicitation # 12069A
The University of California, Berkeley is soliciting an Executive Architect and a team of specialized sub-consultants for the renovation of Latimer D19 and D21 to create a new microscope lab. The project involves approximately 1,100 square feet of space, with the scope including the demolition of existing furnishings, flooring, and ductwork, the conversion of D19 into a Lab Control Room, and the construction of 3-4 sub-rooms in D21 for lab and support spaces. Technical requirements include the installation of lighting at 130% of Title 24 allowable levels for laser safety, seismic anchorage for laser tables, and the use of low-particulate finishes, preferably conductive resin. The estimated construction cost is $1,400,000, and the university anticipates a design/bid/build delivery method with a targeted construction completion date of February 2028. The selection process is based on a Request for Qualifications (RFQ), evaluating consultants on their approach, staff availability, and experience with high-precision environmental controls, legacy laboratory renovations, and the University of California's design and construction processes. Submittals must be uploaded as a single PDF via BuildingConnected by 12:00 p.m. Pacific on December 18, 2026. Proposals are limited to 15 pages, using at least 10pt font, and must include a cover letter and a Summary Statement of Qualifications featuring two to three relevant projects from the last decade. The selection of the Executive Architect is expected to be finalized by January 22, 2027. This solicitation is not set aside for any specific business type.
Architectural Services

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details
NAICS: 236220
SLED
Berkeley Space Center at NASA Research ParkMoffett Partners, LLC, a joint venture between The Regents of the University of California and SKSP NRP, LLC, is proposing the development of the Berkeley Space Center at the NASA Ames Research Center in Santa Clara County, California. The project involves the redevelopment of approximately 45 acres of federal land to create a state-of-the-art research and education hub. Planned facilities include academic and research offices, laboratories, a conference center, ground-floor retail, food and beverage services, maker spaces, student and faculty housing, and short-term lodging. The development also incorporates transportation networks and landscaped open spaces designed to advance the educational and scientific research purposes of the UC Regents under Section 501(c)(3) of the Internal Revenue Code. The project is governed by a joint Final Environmental Impact Report and Environmental Impact Statement, with the University of California serving as the CEQA lead agency and NASA as the NEPA lead agency. Comprehensive technical evaluations have been conducted covering geotechnical conditions, air quality, greenhouse gas emissions, noise, vibration, and biological resources, including the delineation of aquatic resources and consultation with Native American tribes. To manage environmental risks, an Environmental Issues Management Plan is in place to address hazardous materials and soil gas. Additionally, the project includes a detailed Transportation Demand Management Plan to reduce single-occupancy vehicle trips and requires strict adherence to temporary traffic control procedures, including the submission of plans to the NASA Contracting Officer Representative 72 hours prior to any traffic-disrupting work.
Commercial and Institutional Building Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS