Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Interior/Exterior Painting Contractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Parish of Ascension involves interior and exterior painting services for the Donaldsonville Courthouse Phase 2 Renovations. The contractor is responsible for applying coatings to wood veneer panels, performing touch-ups on damaged surfaces, and delivering all finished painted and stained surfaces. All work must be performed in accordance with Master Painters Institute procedures, with a specific requirement to maintain ambient temperature controls between 45 and 90 degrees Fahrenheit during the application process. The opportunity is categorized under NAICS code 238320 and was posted on September 24, 2026. Interested parties must submit their responses by the deadline of October 22, 2026, at 3:00 PM.

General Info

Painting subcontract for Donaldsonville Courthouse Phase 2; responses due by October 22, 2026.

Documents

This scope was carved out of BID-2026-0030.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Donaldsonville Courthouse Renovation Phase 2 Re-Bid

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → Parish of Ascension
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs painting and coating of wood finishes and surfaces for prime contractors on the Donaldsonville Courthouse Phase 2 Renovations. Applies coatings to wood veneer panels and performs touch-ups on damaged surfaces. Maintains ambient temperature controls between 45°F and 90°F during application. Complies with MPI (Master Painters Institute) Manual procedures. Delivers finished, painted, and stained surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
Painting Labor: District-Wide Painting Of Surfaces Including On Dirty, Stained, Discolored, Faded, Peeled, Cracked, Or Bubbled Surfaces
Solicitation # 2286-27
The Fairfield-Suisun Unified School District is soliciting informal bids for project #2286-27, which entails district-wide minor painting services across various sites in Fairfield, California. The scope of work includes the preparation and painting of surfaces that are dirty, stained, discolored, faded, peeled, cracked, or bubbled, specifically targeting stucco, concrete blocks, rough sawn wood, and various metal surfaces such as doors and window frames. The contract is awarded based on the lowest responsive and responsible bid, with a total price not to exceed 220,000 dollars. All work must be completed by June 30, 2027, and the successful contractor must possess a valid California C-33 Painting and Decorating Contractor license. Bidders are required to provide a bid security of 10 percent of the total bid price and must adhere to California prevailing wage rates as determined by the Department of Industrial Relations. The contract includes strict quality standards, requiring the use of PPG Industries products or approved equivalents, and mandates that painting be avoided if rain is threatened within 24 hours or if temperatures are at or below 55 degrees. Key administrative requirements include a one-year warranty on workmanship and materials, performance and payment bonds, and comprehensive insurance coverage naming the District as an additional insured. Additionally, contractors must comply with stringent safety and background requirements, including criminal background investigations and tuberculosis certifications for personnel interacting with students. Liquidated damages are set at 500 dollars per day for completion delays occurring on or after July 1.
Fairfield-Suisun Unified School District

POSTED

1 day ago

DEADLINE

in 19 days
View Details

More opportunities from Louisiana → Parish of Ascension

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS