Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

INTRACOASTAL WATERWAY MAINTENANCE DREDGING VICINITY OF BAKERS HAULOVER, MIAMI-DADE COUNTY, FLORIDA.

Closed
GROUP1-26-R-J001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract is a total small business set-aside under NAICS code 237990 for maintenance dredging of the Intracoastal Waterway channel and settling basin near Bakers Haulover Inlet in Miami-Dade County, Florida, with excavated material to be placed on the beach south of the inlet. Only nine pre-qualified contractors awarded under solicitation W912EP25R0010 are eligible to respond. The work includes incidental environmental monitoring such as sea turtle and shorebird surveys, benthic assessments, water quality and turbidity tracking, beach tilling, and quality control for beach fill, all governed by specific Florida permitting protocols and federal guidelines. The project must commence within 60 calendar days after receipt of the Notice to Proceed and be fully completed within 100 calendar days, with a mandatory 65-day pre-construction marine turtle monitoring period required before any work can begin. The contract is firm-fixed price, with a price target range of $1 million to $5 million, and requires a 20% bid guarantee or $3 million, whichever is less, along with performance and payment bonds issued within 10 days of award. Liquidated damages of $2,458 per calendar day apply for delays. Proposals must be submitted electronically via PIEE by May 13, 2026, structured into three volumes—Technical Merit (maximum 25 pages), Past Performance (maximum 25 pages), and Price (no page limit)—following a strict naming convention. Evaluation will follow the Lowest Price Technically Acceptable method, with award going to the responsible offeror with the lowest price that meets minimum technical and past performance standards. All offerors must be registered in SAM.gov and self-certify as small businesses under the $37 million size standard. Environmental compliance is critical: turbidity must not exceed 4 NTUs above background within the outfall water or 29 NTUs outside it, and work must halt immediately upon exceedance. Monitoring data must be submitted on strict deadlines, and subcontractors must hold requisite permits approved by the government. Performance occurs entirely in Miami-Dade County, with access via 96th Street and staging areas near Bal Harbour Jetty and R-31, and all reports must align with Section 01 57 20, Section 35 20 23, and Florida Fish and Wildlife Conservation Commission requirements. The contracting office

General Info

Maintenance dredging and environmental monitoring at Bakers Haulover, Florida; small business set-aside.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

SBA

Documents

2

B.07+Pre-Proposal+Conference+Attendance+List_GROUP1-26-R-J001_IWW+Bakers+Haulover.pdf

PDF

B.07+Pre-Proposal+Conference_GROUP1-26-R-J001_IWW+Bakers+Haulover.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: Project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but not limited to environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS