This Solicitation opportunity from Texas was posted on May 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Tarrant Regional Water District in Texas is seeking proposals for the construction of the Integrated Pipeline Project, specifically focusing on the Pipeline Section 19 Microtunnel Crossings (PL19MT). The solicitation, identified as IPL 25-042, was posted on May 27, 2025, with a deadline for responses set for August 14, 2025. The project involves the construction of microtunnel crossings as part of a larger pipeline installation effort, with an estimated contract value ranging between 7.5 million and 10 million dollars. The project is open to qualified entities and is managed by the Tarrant Regional Water District, with a designated point of contact for inquiries being Cassandra Kay, reachable via email or phone.
This contract is part of a broader infrastructure initiative aimed at enhancing water transmission capabilities within the region. The procurement process is conducted through an open solicitation, and interested parties can access detailed project information and submission guidelines through the provided online portal. The project emphasizes technical expertise in microtunneling and pipeline construction, with a focus on meeting the specified timeline and budget parameters.
HighAI Summary for IPL-RFP-23-066 Procurement Package 12 - 84-Inch Full Port Valves and Pump Control Valves: This document is the Request for Proposals (RFP) IPL-RFP-23-066 issued by the Tarrant Regional Water District in May 2025. It solicits proposals for Procurement Package 12, which includes 84-inch Full Port Valves with Electric-Motorized Actuators and Pump Control Valves with Electro-hydraulic Actuators. The procurement covers three items with specified quantities and delivery deadlines: December 31, 2026, for the 84-inch valves and June 30, 2027, for the pump control valves. The document includes instructions for obtaining proposal documents, registration requirements, and details about a non-mandatory pre-proposal conference scheduled for June 5, 2025. The budget range for this procurement package is approximately $7.5 million to $10 million.
PDF
PDF, High priority: read this firstwps
HighAI Summary for PL19MT Appendix K Pre-Approved Welding Procedures Specification: This document is Appendix K for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It contains pre-approved welding procedure specifications (pWPS) for weld-after-backfill processes, including detailed AWS D1.1 prequalified welding procedures for SMAW and FCAW-G welding processes. The document specifies joint design, welding positions, electrical characteristics, base metal specifications, welding techniques, filler metal classifications, preheat and post-weld treatments, and weld parameters such as amperage, travel speed, and heat input calculations. It serves as a technical reference for approved welding methods and parameters to ensure compliance and quality in pipeline construction welding activities.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL19MT Contractor Off-System Haul Plan Appendix E: This document is Appendix E titled 'Contractor's Off-System Haul Plan' for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042. Dated May 2025, it outlines the contractor's plan related to off-system haul activities for this specific pipeline section. The document serves as a statement of work detailing the haul route and associated requirements for the project.
PDF
PDF, High priority: read this firstgeotechnical-baseline-report
HighAI Summary for PL19MT Geotechnical Baseline Report for Pipeline Section 19 Microtunnel Crossings: This Geotechnical Baseline Report (GBR) dated May 22, 2025, is issued for the PL19MT Contract of the Integrated Pipeline Project, covering microtunnel crossings in Pipeline Section 19 from Henderson County to Anderson County. It provides an interpretive geotechnical summary and establishes baseline ground conditions and behaviors expected during construction of five tunnel crossings: Coon Creek, Mine Creek, FM 2588, Caddo Creek, and Frankston Bluff. The report includes project information, geologic conditions, ground characterization, design and construction considerations, and references. It is intended for use by the commissioning parties and contains confidential and proprietary information.
PDF
PDF, High priority: read this firstifb-appendix
HighAI Summary for PL19MT IFB Appendix A Fair Opportunity Purchasing and Contracting Part 1: This document is Appendix A of the Invitation for Bid (IFB) for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It outlines the Fair Opportunities in Purchasing and Contracting (FOPC) policy developed by the Tarrant Regional Water District and the City of Dallas. The policy aims to provide fair opportunities for qualified businesses, including Disadvantaged Business Enterprises (DBE) and Historically Underutilized Businesses (HUB), to participate in the procurement process. It defines key terms, acceptable certifications, and the commitment to non-discrimination and good faith efforts to achieve DBE/HUB participation goals in IPL projects. The document supports the IPL Team's goal of promoting equitable contracting practices and local business development.
PDF
PDF, High priority: read this firstgeotechnical-data-report
HighAI Summary for PL19MT IFB Appendix C2c Geotechnical Data Report Test Pits Section 19: This document is the Appendix C2c Geotechnical Data Report for test pits at selected locations in Pipeline Section 19 of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025 with revisions in April 2013. It details the excavation and soil sampling of four test pits (TP-1 to TP-4) to investigate soil conditions and groundwater seepage along the pipeline alignment. The report includes soil descriptions, groundwater depths, excavation geometry, stability observations, and a field permeability test. It provides critical geotechnical data for pipeline construction planning and risk assessment.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL19MT IFB Appendix C2d Supplemental Geotechnical Data Report Section 19-2 90% Draft May 2025: This document is the 90% draft Supplemental Geotechnical Data Report for Design Section 19-2 of the Integrated Pipeline Project (IPL) from Lake Benbrook to Lake Palestine, dated May 2025. It supplements the original 30% Geotechnical Data Report from April 2013 with additional borings, laboratory tests, and geotechnical data to fill design data gaps. The report includes updated boring logs, groundwater observations, piezometer data, and revised stratigraphy interpretations. It supports the design and construction of pipeline microtunnel crossings and related infrastructure, providing critical geotechnical information for engineering evaluation and project planning.
PDF
PDF, High priority: read this firstsupplemental-geotechnical-data-report
HighAI Summary for PL19MT IFB Appendix C2e Supplemental Geotechnical Data Report Sections 19-1 & 19-2: This document is the Appendix C2e Supplemental Geotechnical Data Report for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It includes additional geotechnical data obtained from 10 borings drilled to depths of 40 feet between December 2019 and January 2020 in Anderson and Henderson Counties, Texas. The report contains boring logs, laboratory test results, Atterberg limits, and maps showing boring locations. The data supports design sections 19-1 and 19-2 of the pipeline project and provides detailed soil classification and subsurface material descriptions essential for engineering and construction planning.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL19MT IFB Appendix I SUE Level A Utility Survey: This document is Appendix I titled 'SUE Level A' for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It contains detailed Subsurface Utility Engineering (SUE) Level A information, listing utility types, descriptions, owners, and precise geographic coordinates for various parcels along the pipeline section. The data includes water lines, oil and gas lines, wastewater lines, and communication lines, providing critical utility location and ownership details essential for project planning and execution.
PDF
PDF, High priority: read this firstreport
HighAI Summary for PL19MT IPL Reports on Local Construction May 2025: This document is an appendix (C3b) for the IPL Section 19 Microtunnel Crossings (PL19MT) project, dated May 2025. It summarizes data reports and field observations from two related IPL projects (PL19TX and PL19TUN) in similar geologic formations. Key contents include piezometer readings and test pit excavation reports at FM2588, shaft and tunnel excavation reports in Queen City sand, and ironstone material testing at the Hollywood Lake Tunnel launch portal. The report provides detailed field data, groundwater measurements, and geotechnical testing results relevant to local construction conditions for the PL19MT project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PL19MT Section 19 Microtunnel Crossings Specifications: This document contains the contract specifications for Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 27, 2025. It includes detailed specification sections sealed by registered engineering firms, covering divisions 00 and 01, with topics such as request for proposals, instructions to offerors, proposal forms, bonds, general conditions, wage determinations, project coordination, quality management, and sitework. The document serves as a comprehensive technical guide and contractual reference for the project.
PDF
PDF, Low priorityreport
LowAI Summary for PL19MT Groundwater Monitoring Report Mine Creek 20250424: This document is a revised Groundwater Monitoring Report for Mine Creek B-711P and B-712P in Henderson County, Texas, dated 24 April 2025. It presents results from an ongoing groundwater monitoring program using In-Situ non-vented Level TROLLs installed in August 2023. The report includes groundwater data downloads up to 23 April 2025, with graphs and data appendices showing water level elevations and calculated groundwater elevations. Surveyed ground elevations were provided by McKim and Creed. The report is prepared by Geoscience Consultants International, LLC, and is intended to update the client, Tarrant Regional Water District, on groundwater conditions at the site.
PDF
PDF, Low priorityother
LowAI Summary for PL19MT IFB Appendix B ROCIP Manual 20240101: This document is Appendix B of the Integrated Pipeline Project, titled Rolling Owner Controlled Insurance Program II (ROCIP II) Program Manual, revised January 01, 2024. It provides an overview of the ROCIP insurance program, including definitions of Eligible, Enrolled, and Excluded Participants, insurance coverage details, and participation requirements. The manual outlines the insurance coverages provided by the Owner, the roles of the ROCIP Administrator and Safety Committee, and the mandatory enrollment process for contractors and subcontractors. It serves as a guide for insurance and safety management but does not provide complete coverage interpretations or policy details.
PDF
PDF, Low prioritypermit
LowAI Summary for PL19MT IFB Appendix D404 Permit Part 1 of 3 - IPL Eastern Segment Environmental Permit: This document is Appendix D404 Permit Part 1 of 3 for Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It includes a regulatory letter from the U.S. Army Corps of Engineers regarding Project Number SWF-2019-00364 for a 42-mile raw water supply pipeline in Texas. The permit authorizes activities under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, specifically under Nationwide Permit 12 for Utility Line Activities. The document outlines compliance requirements, invasive species controls, and certification procedures. It also includes the Nationwide Permit 12 details effective March 19, 2017, and a permit compliance certification form for the permittee to sign upon completion of authorized work.
PDF
PDF, Low priorityappendix-l-table-of-parcels
LowAI Summary for PL19MT IFB Appendix L Table of Cultivated Parcels: This document is Appendix L for the Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project IPL-CSP-25-042, dated May 2025. It provides a table listing parcels with cultivated land, specifying parcel numbers, their cultivation status, and the type of restoration (Coastal Bermuda). The appendix supports the main solicitation by detailing land use relevant to the project.
PDF
PDF, Low priorityother
LowAI Summary for PL19MT Mentor Protege Program Policy Guidelines: This document, dated May 2025, outlines the Mentor Protege Program (MPP) policy guidelines for the Pipeline Section 19 Microtunnel Crossings (PL19MT) of the Integrated Pipeline Project (IPL-CSP-25-042) managed by the Tarrant Regional Water District (TRWD). The program aims to support Minority, Women Owned Business (MWBE) and Historically Underutilized Business (HUB) firms by encouraging prime contractors to provide developmental assistance, increasing MWBE/HUB participation, and fostering long-term business relationships. The University of Texas Arlington's Cross Timbers Procurement Center provides technical assistance. The document details participant eligibility, program duration, selection and approval processes, developmental assistance types, and elements of the Mentor-Protege Agreement, including reporting and termination procedures.
PDF
PDF, Low prioritypermit-verification
LowAI Summary for USACE Nationwide Permit 58 Verification for Integrated Pipeline Eastern Segment: This document dated July 5, 2022, from the U.S. Army Corps of Engineers Regulatory Division, verifies that the Integrated Pipeline Eastern Segment project (Project Number SWF-2019-00364) is authorized under Nationwide Permit 58 for Utility Line Activities. It outlines compliance requirements under the Clean Water Act Section 404 and Rivers and Harbors Act Section 10, including invasive species control and water quality certification conditions. The permit is valid until March 14, 2026, unless modified or revoked. The document also addresses endangered species considerations and includes a permit compliance certification form for the permittee to confirm completion of authorized work and mitigation.
The Tarrant Regional Water District (Owner) is requesting Proposals for the construction of the following Project:Integrated Pipeline Project – Pipeline Section 19 Microtunnel Crossings (PL19MT)IPL-CSP-25-042
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award