This Solicitation opportunity from Texas was posted on November 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Integrated Pipeline Project IPL-CSP-25-137 - Section 19-1 Part D (PL191D) Specifications: Compiled technical specifications and contract documents for the Integrated Pipeline Project (IPL-CSP-25-137), Section 19-1 Part D (PL191D), dated November 25, 2025. The document includes designer seals, a comprehensive table of contents covering Divisions 00, 01, 02, 03, 05, 09, and 15, a list of appendices (geotechnical, permits, and haul plans), and a list of general construction drawings.
PDF
PDF, High priority: read this first140 pages · specifications
HighAI Summary for IPL-CSP-25-137 Appendix C9: Geotechnical Data Report (PL191D): Geotechnical Data Report (GDR) prepared by ETTL Engineers & Consultants, Inc. for the Tarrant Regional Water District (TRWD) regarding the Integrated Pipeline Project (IPL) Section 19. The document provides factual subsurface data, including results from geotechnical drilling, sampling, and laboratory testing for pipeline sections including PL191D. It includes site descriptions, field exploration procedures, and groundwater observations for the project area in Henderson County, Texas.
PDF
PDF, High priority: read this first29 pages · specifications
HighAI Summary for IPL-CSP-25-137 PL191D Geotechnical Data Report - Draft Logs: Draft supplemental geotechnical boring logs for Pipeline Section 19-1 Part D (PL191D) of the Integrated Pipeline Project (IPL-CSP-25-137), dated November 25, 2025. The document contains a table of boring numbers, parcel numbers, stations, coordinates, and drilling dates for borings B-801 through B-816.
PDF
PDF, High priority: read this firstgeotechnical-data-report
HighAI Summary for PL191D Appendix C2 Geotechnical Data Report Section 19-1 Part D: This document is Appendix C2 of the Integrated Pipeline Project, specifically the Geotechnical Data Report for Design Sections 19-1 Part D (PL191D). Dated November 25, 2025, it contains geophysical survey results including geophysical resistivity values and survey line data for pipeline section 19-1 parcels. The report provides detailed geophysical data essential for pipeline design and construction planning.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PL191D Appendix C6: Geotechnical Groundwater Supplement: A geotechnical groundwater supplement report dated June 21, 2022, for Pipeline Section 19-1 Part D (PL191D) of the Integrated Pipeline Project. The document provides groundwater level data and monitoring results from various piezometers (including B-261, B-610p, and others) located in Henderson and Anderson Counties, Texas, to support the design and construction of five tunnels.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL191D Appendix C8 Geotechnical Data Report Groundwater Supplement 20210908: This document is Appendix C8, a Geotechnical Data Report and Groundwater Supplement dated September 8, 2021, for Pipeline Section 19-1 Part D (PL191D) of the Integrated Pipeline Project IPL-CSP-25-137. It provides updated groundwater study data including piezometer locations, groundwater data downloads, and monitoring results for multiple piezometers installed to support design and construction of tunnels in Henderson and Anderson Counties, Texas. The report includes tables of piezometer coordinates, groundwater level graphs, and data logs, with monitoring continuing through June 2022. It supplements previous reports from March and July 2021 and is intended to support project design and construction activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PL191D Appendix J Pre-Approved Welding Procedures Specification: This document is Appendix J of the Integrated Pipeline Project IPL-CSP-25-137, dated November 25, 2025. It contains pre-approved welding procedure specifications (pWPS) for weld-after-backfill for Pipeline Section 19-1 Part D (PL19D). The document details welding processes such as SMAW and FCAW-G, joint designs, electrical characteristics, base metal specifications, welding techniques, filler metal classifications, preheat and post-weld treatments, and weld parameters including amperage, voltage, and travel speed. It serves as a technical specification for welding procedures to be followed on the project.
PDF
PDF, High priority: read this firstgeotechnical-data-report
HighAI Summary for PL191D Geotechnical Data Report Section 19-1 Integrated Pipeline Project: This Geotechnical Data Report for Section 19-1 of the Integrated Pipeline Project (PL191D) dated November 25, 2025, provides detailed geotechnical and geophysical data for the pipeline section between Lake Benbrook and Lake Palestine in North Central Texas. Prepared by Fugro Consultants, Inc., the report includes results from Phase 1 and Phase 2 geophysical surveys, field borings, laboratory testing, and geotechnical explorations. It covers soil sampling, rock coring, groundwater observations, and various geotechnical tests such as unconfined compression and triaxial tests. The report supports the design and construction of approximately 20.4 miles of 84-inch diameter pipeline, detailing site conditions, geologic setting, and survey locations. Analytical data and appendices with logs and test results are included. This document is critical for design and construction planning of the pipeline section.
PDF
PDF, High priority: read this firstgeotechnical-data-report
HighAI Summary for PL191D IFB Appendix C1 Supplemental Final Geotechnical Data Report Part 2: This document is Appendix C1, a Supplemental Final Geotechnical Data Report for Design Sections 19-1 and 19-2 of Pipeline Section 19-1 Part D (PL191D) of the Integrated Pipeline Project IPL-CSP-25-137, dated June 21, 2021, with a revision date of November 25, 2025. It includes detailed geotechnical data such as boring logs, site maps, stratigraphic columns, and test results. The report contains an addendum correcting coordinates and elevation for Boring B-265, along with updated plates and logs. It serves as a critical technical document supporting pipeline design and construction decisions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL191d IFB Appendix C4 Supplemental Geotechnical Data Report Sections 19-1 and 19-2: This document is the Supplemental Geotechnical Data Report (GDR) for Design Sections 19-1 and 19-2 of the Integrated Pipeline Project (IPL-CSP-25-137), dated March 16, 2020. It provides additional geotechnical data including 10 borings drilled to 40 feet depth, soil sample descriptions, laboratory test results, and boring logs. The report includes maps, boring locations, and detailed soil classifications to support pipeline design and construction. It is prepared by Fugro USA Land, Inc. for the Tarrant Regional Water District and serves as a technical supplement to the project specifications.
PDF
PDF, High priority: read this firstgeotechnical-design-memorandum
HighAI Summary for PL191d IFB Appendix C5 Geotechnical Design Memorandum Test Pits Sections 19-1 and 19-2: This document is the Geotechnical Design Memorandum (Appendix C5) dated April 29, 2013, for Pipeline Section 19-1 Part D (PL191D) of the Integrated Pipeline Project. It reports on test pit excavations at selected locations in Sections 19-1 and 19-2 to investigate soil conditions and groundwater seepage relevant to pipeline construction. The memorandum details excavation depths, soil types encountered, groundwater levels, excavation stability, and permeability testing results. It includes tables summarizing test pit locations, geologic formations, and groundwater data, as well as descriptions of excavation geometry and soil sampling procedures. The document supports geotechnical design decisions for the pipeline project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for PL191D IFB Appendix I SUE Level A Utility Survey: This document is Appendix I titled 'SUE Level A' for Pipeline Section 19-1 Part D (PL19D) of the Integrated Pipeline Project IPL-CSP-25-137, dated November 25, 2025. It contains detailed utility survey information including utility types, descriptions, owners, and precise geographic coordinates (Northing and Easting) for various parcels along the pipeline route. The data covers water lines, oil and gas lines, wastewater lines, and communication lines, providing critical subsurface utility engineering (SUE) Level A information necessary for project planning and execution.
PDF
PDF, High priority: read this firstgeotechnical-data-report
HighAI Summary for PL191D Supplemental Final Geotechnical Data Report Sections 19-1 and 19-2: This document is the Supplemental Final Geotechnical Data Report for Design Sections 19-1 and 19-2 of the Integrated Pipeline Project (PL191D), dated June 1, 2021. It supplements previous geotechnical data reports by including additional data from 29 borings drilled between October 2020 and January 2021, as well as data from earlier reports and addenda dating back to 2013. The report covers geotechnical explorations, field geophysical surveys, laboratory data, groundwater monitoring, and test pit excavation data for pipeline sections crossing various locations in North Central Texas. Prepared by Fugro USA Land, Inc. for the Tarrant Regional Water District, the report is intended to support the design and construction of a 150-mile pipeline between Lake Benbrook and Lake Palestine.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PL19D Appendix G - Special Surface Restoration Requirements: Appendix G for Pipeline Section 19-1 Part D (PL19D) of the Integrated Pipeline Project (IPL-CSP-25-137), dated November 25, 2025. The document contains specific surface restoration requirements and special provisions for land easements, including tree protection, debris removal, re-sprigging of Bermuda grass, and soil management (double ditching) to be performed by contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PL19D - NW Permit 58 for Utility Line Activities (SWF-2019-00364): This document is Appendix D - Part 4 for the Integrated Pipeline Project (IPL-CSP-25-137), containing a July 5, 2022, authorization letter from the U.S. Army Corps of Engineers (Fort Worth District) for Nationwide Permit #58. It authorizes the Tarrant Regional Water District to construct a 42-mile raw water supply pipeline (Project SWF-2019-00364) in Texas, subject to specific environmental conditions, invasive species controls, and Endangered Species Act compliance. The authorization is valid until March 14, 2026.
PDF
PDF, Low priorityspecifications
LowAI Summary for IPL-CSP-25-137 Pipeline Section 19-1 Part D - Educational Materials: Environmental condition exhibits dated November 25, 2025, for Pipeline Section 19-1 Part D (PL19D) of the Integrated Pipeline Project. The document provides educational materials and response procedures for protected species, including the Alligator Snapping Turtle, Timber Rattlesnake, Texas Horned Lizard, Northern Scarlet Snake, Bachman’s Sparrow, and Texas Fawnsfoot.
PDF
PDF, Low priorityother
LowAI Summary for PL191D IFB Appendix D404 Environmental Permit Part 3 of 3: This document is Appendix D404 Permit Part 3 of 3 for Pipeline Section 19-1 Part D (PL19D) of the Integrated Pipeline Project IPL-CSP-25-137, dated November 25, 2025. It includes an Environmental Information Document (EID) for the Integrated Pipeline Project Eastern Segment prepared for Tarrant Regional Water District and City of Dallas Water Utilities by Freese and Nichols, Inc. The EID covers general project information, affected environment, alternatives, environmental impacts, and appendices with figures and tables. The purpose is to provide conveyance for additional water supply to the TRWD and DWU service areas, addressing environmental considerations for the eastern segment of the pipeline project.
PDF
PDF, Low prioritypermit
LowAI Summary for PL191D IFB Appendix D404 Permit Part 1 of 3 - IPL Eastern Segment Environmental Permit: This document is Appendix D404 Permit Part 1 of 3 for Pipeline Section 19-1 Part A (PL191A) of the Integrated Pipeline Project IPL-CSP-23-118 dated October 28, 2024. It includes a regulatory letter from the U.S. Army Corps of Engineers regarding Project Number SWF-2019-00364 for the construction of a 42-mile raw water supply pipeline in Texas. The permit authorizes activities under Nationwide Permit 12 for Utility Line Activities, subject to compliance with specified conditions including invasive species controls. The permit is valid until March 18, 2022, and includes certification requirements and compliance instructions. The document also contains the Nationwide Permit 12 details effective March 19, 2017.
PDF
PDF, Low priorityother
LowAI Summary for PL191D IFB Appendix D 404 Permit Part 2 of 3 - IPL Eastern Segment Environmental Permit: This document is Appendix D, Part 2 of 3, related to the 404 Permit for Pipeline Section 19-1 Part D (PL19D) of the Integrated Pipeline Project IPL-CSP-25-137. Dated November 25, 2025, it includes a Preconstruction Notification (PCN) for the IPL Eastern Segment prepared for the Tarrant Regional Water District. The document covers environmental and regulatory details such as impacts on waters of the U.S., cultural resources, threatened and endangered species, invasive species management, and project schedule. It references multiple supporting documents including jurisdictional evaluations, species reports, and cultural resource surveys. The project involves a 42-mile pipeline with specific construction and environmental considerations.
PDF
PDF, Low priorityappendix
LowAI Summary for PL191D IFB Appendix H Cultivated Parcels: This document is Appendix H of the Integrated Pipeline Project IPL-CSP-25-137, dated November 25, 2025. It provides a detailed table of parcels with cultivated land for Pipeline Section 19-1 Part D (PL19D). The appendix lists parcel numbers, their cultivation status, and restoration details, primarily Coastal Bermuda grass. The document serves as a reference for land cultivation status related to the pipeline project.
The Tarrant Regional Water District (Owner) is requesting Proposals for the construction of the following Project: Integrated Pipeline Project – Pipeline Section 19-1 Part D (PL191D) IPL-CSP-25-137