Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on March 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Iron Rd. Subdivision - Douglas Coffee Co. IA

Closed
PE-33260-NONST-2026-000000003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves a comprehensive infrastructure construction project for the Iron Rd. Subdivision in Douglas Coffee County, Georgia, managed by the Douglas-Coffee County Industrial Authority. The scope includes the installation of approximately 4,359 linear feet of 6-inch PVC C900 water main and around 5,190 linear feet of 8-inch SDR 26 sewer trench cut. A key element is the construction of a submersible duplex pump station along with roughly 1,179 linear feet of 4-inch PVC force main. Additionally, the project entails building a new roadway featuring about 6,456 square yards of 8-inch graded aggregate base, nearly 710 tons of 9.5mm Superpave asphalt, and extensive curb and gutter work measuring approximately 9,426 linear feet. The drainage system components to be constructed include multiple reinforced concrete pipes of various diameters (18”, 24”, 30”, and 36”) totaling over 3,400 linear feet, as well as 23 catch basins. All work will encompass the necessary roadway and drainage improvements to complete the neighborhood’s right-of-way infrastructure, including all required appurtenances. The solicitation was posted on March 26, 2026, with a response deadline of May 7, 2026. The project is categorized as a solicitation and is overseen by a primary point of contact, JamieLynn Harris, reachable via email.

General Info

Infrastructure project in Douglas Coffee County installing water, sewer, pump station, roadway, drainage systems.

Documents

1

Advertisement for Bids - Iron Road Subdivision Douglas GA

PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Douglas-coffee County Industrial Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
JamieLynn Harris

Full Description

Show more
The Construction includes the installation of approximately ± 4,359 LF of 6¿ PVC C900 water main, ± 5,190 linear feet of 8¿ SDR 26 sewer trench cut, one (1) submersible duplex pump station with ±1,179 LF of 4¿ PVC force main, new roadway with ±6,456 SY of 8¿ GAB, ±710 TNS of 9.5mm Superpave asphalt, ±9,426 LF of curb and gutter, ±1,285 LF of 18¿ RCP, ±1,495 LF of 24¿ RCP, ±464 LF of 30¿ RCP, ±183 LF of 36¿ RCP, ±23 catch basins, and all roadway and drainage improvement construction necessary for the completion of the neighborhood right of way infrastructure. This includes all appurtenances necessary to complete the job.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS