Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Irvine Business Complex (IBC) Multi-Use Trail Creekwalk Segment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Irvine Business Complex (IBC) Multi-Use Trail Creekwalk Segment Project, managed by the City of Irvine, involves the construction of approximately 1.75 miles of an off-street paved Class I shared-use path. The trail will run along the western edge of San Diego Creek and Peters Canyon Wash, extending from Coronado Drive in the south to Warner Avenue in the north. The design features a two-foot paved shoulder and an eight-foot paved trail for pedestrians and cyclists, complemented by a five-foot decomposed granite trail for equestrian use and a two-foot earthen bio-swale. Additionally, the project includes at-grade crossing improvements at the intersection of Coronado and Main Street. The project is subject to the California Environmental Quality Act (CEQA), with a Notice of Determination approved on June 9, 2026, following a Mitigated Negative Declaration. Comprehensive environmental assessments have been completed, including a Phase I Environmental Site Assessment that found no recognized environmental conditions, as well as paleontological, cultural, and geotechnical investigations. The construction schedule is slated to begin on January 1, 2028, progressing through demolition, grading, and concrete paving in 2028, with asphalt paving continuing into February 2029. Technical modeling has been performed to ensure compliance with air quality, greenhouse gas emissions, and noise and vibration thresholds.

General Info

Irvine to build 1.75-mile shared-use trail with pedestrian, cyclist, and equestrian paths, bio-swale, and intersection upgrades.

Agency

California → City of Irvine

Place of Performance

Coronado to Warner and Coronado and Main Street, Irvine, CA, N/A

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Irvine
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Irvine
Office AddressN/A
Contacts
Amir AinechiAssociate Engineeer

Full Description

Show more
The proposed trail is located along the western edge of the San Diego Creek and Peters Canyon Wash, extending from Coronado Drive in the south to Warner Avenue in the north. The proposed trail would total approximately 1.75 miles of an off-street paved Class I shared-use path. The proposed trail would include two components: 1) a two-foot wide paved shoulder nearest to the channel and an eight-foot wide paved trail for pedestrians and cyclists and 2) a five-foot wide decomposed granite trail for equestrian use and a two-foot wide earthen bio-swale located on the western side of the path. Proposed intersection improvements at Coronado and Main Street would include at-grade crossings.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Fuel Pump Renovation
Solicitation # 6581
The Town of Trumbull is soliciting sealed proposals for the Department of Public Works Fuel Pump Renovation project, identified as solicitation 6581. The scope of work requires the contractor to provide all labor, materials, and equipment for the demolition, removal, and installation of fuel pump facilities. Key deliverables include the construction of fuel islands, tank slabs, and canopies, as well as the implementation of fire suppression and electrical systems. The project must adhere to the 2024 Connecticut Sediment and Erosion Control Guidelines, Town of Trumbull noise regulations, and technical standards such as NFPA 30, 30A, and 70. Proposals are due by December 1, 2026, at 2:00 PM ET and must be submitted in a sealed envelope to the Purchasing Agent. The selection process may evaluate proposers based on their previous experience with comparable work and available financial and technical resources. Required submission documents include a completed bid form, a list of subcontractors, and evidence of similar services provided to at least four clients in the last five years. The successful contractor must provide a 10% bid security, 100% performance and payment bonds, and a Certificate of Insurance naming the Town of Trumbull and the State of Connecticut as additional insureds. Additionally, the contractor must comply with Connecticut State Prevailing Wage Rates and ensure personnel have completed the 10-hour OSHA Construction Safety and Health Course. Payment is structured via estimates with a 5% retainage, though the Town may approve payments for long-lead equipment prior to delivery.
DAS Procurement

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
International
Fort William Historical Park – Bank Stabilization Construction Services (Historic Wharf)
Solicitation # tender_22303
The Government of Ontario, through the Ministry of Tourism, Culture and Gaming, is seeking a qualified contractor for bank stabilization and erosion mitigation works at the Historic Wharf of Fort William Historical Park in Thunder Bay, Ontario. The project aims to stabilize the existing embankment, protect the boardwalk and surrounding infrastructure, and restore safe conditions. The scope of work encompasses all necessary labor, materials, and supervision for site preparation, earth excavation, installation of geotextile and gabion basket retaining systems, placement of blast rock and clear stone, temporary dewatering, erosion and sediment control, and final site restoration including topsoil and sodding. The procurement process, identified as tender 22303, utilizes a multi-stage evaluation totaling 250 points. Bidders must first pass a technical evaluation focusing on health and safety, requiring a minimum score of 60 points to proceed to the commercial evaluation. The final selection is based on the highest scoring compliant bid, with a 10 percent score increase awarded to the bidder demonstrating the highest proportion of Ontario-made goods and services. Mandatory requirements include a non-U.S. business status, a commitment that 90 percent of staff are located in Canada, and a bid deposit of at least 10 percent of the total bid price. Selected contractors must provide a detailed project plan, procurement plan, and health and safety plan, while ensuring all Ontario tax obligations are in good standing.
Tourism, Culture and Gaming

POSTED

1 day ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS