Isolation Valve and Valve Box Instillation at the Santa Ysabel Pump Station for the Nacimiento Water Project

Forecast
310018/ED25-0223State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Luis Obispo County Public Works department is initiating a project for the installation of a new isolation valve and valve box along the existing Nacimiento Water Project (NWP) main pipeline. Located on the north side of the Santa Ysabel Pump Station at APN 020-282-010 and 020-282-012 in California, the project aims to address the limited number of isolation valves on the main transmission line. By performing these upgrades, the county intends to improve operations and maintenance, enhance public health and safety, and increase supply reliability. Additionally, the project is designed to reduce overall water loss and minimize environmental impacts, specifically reducing the risk of unplanned discharges into waters of the United States. All ground disturbances, including minor trenching and backfilling, will be confined to the original pipeline alignment. Due to the nature of the work as a minor alteration of an existing public facility, the project has been granted a CEQA categorical exemption. The solicitation, identified by number 310018/ED25-0223, is managed by the San Luis Obispo County Public Works office, with Delaney DeBoer serving as the Lead Agency Contact and Kate Shea as the Environmental Division Manager. While specific contract values and evaluation factors are not provided in the current documentation, the project is categorized under NAICS code 237110.

General Info

San Luis Obispo County project to install isolation valves on Nacimiento Water Project pipeline.

Agency

California → San Luis Obispo County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A

Full Description

Show more
The County of SLO proposes the of installation of new isolation valve and valve box along the existing Nacimiento Water Project (NWP) system main pipeline on the north side of the Santa Ysabel Pump Station (SYPS). All ground disturbances associated with the project will occur along the original pipeline alignment. This project aims to sati sfy concerns raised regarding the limited number of isolation valves on the main transmission line. The project's goal is to help provide participants of the NWP with reliable, efficient and high-quality water service, and to help reduce overall water loss. The proposed project will improve operations & maintenance, public health & safety, and supply reliability of the NWP. while reducing environmental impacts and penalties associated with unplanned discharges into waters of the US. During review of the project. no exceptions as described in Section 15300.2 of the CEOA Guidelines were determined to be applicable.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS