This Solicitation opportunity from Virginia was posted on June 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 17 - War Memorial Stadium Locker Room Renovation: Technical architectural drawings and specifications for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes roof plan demolition and new construction details, specifically focusing on roofing systems, insulation (R-30), flashing, and drainage. It contains detailed construction notes, material requirements for modified bitumen and single-ply membranes, and an issuance schedule dated January 19, 2024, with an addendum update from June 20, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 19 - Enlarged Toilet Plans: Technical drawing specifications and enlarged toilet plans for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes detailed dimensions for accessible lavatories, toilet stalls, shower partitions, and athletic lockers, as well as general construction notes regarding field verification and wall blocking. This is part of Addendum No. 1 issued on 06/20/2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 1 - Plumbing Demolition Plan: This document is a technical drawing and specification sheet (PD101) for the City of Hampton War Memorial Stadium Locker Room Renovation. It details the first floor plumbing demolition requirements, including the removal of water closets, lavatories, urinals, showers, water heaters, and gas meters. This specific version is part of Addendum No. 1, issued on June 14, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 21 - Mechanical First Floor Plan: Mechanical First Floor Plan (Sheet M101) for the City of Hampton War Memorial Stadium Locker Room Renovation. This document, issued as part of Addendum No. 1 on 06/14/2024, contains technical mechanical specifications, ductwork routing notes, equipment installation requirements for DOAU units and electric heaters, and specific room designations for locker and dressing areas.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 22 - War Memorial Stadium Locker Room Renovation: Plumbing first floor plan (Sheet P-101) for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes sanitary and domestic water layouts, general notes regarding demolition and piping, and is part of Addendum No. 1 issued on 06/14/2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 2 - War Memorial Stadium Locker Room Renovation: Architectural floor plans and demolition specifications for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes detailed demolition keynotes (D02-D38), general construction notes, and specific instructions for the removal and reuse of equipment (washers, dryers, ice machines). It identifies specific rooms for renovation, including visitor and home toilets, showers, and locker rooms, and is part of Addendum No. 1 dated June 14, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 3 - Building Elevations: Architectural drawing sheet A-201 for the City of Hampton War Memorial Stadium Locker Room Renovation (Project No. 10015987). The document provides exterior elevations (North, South, East, and West) for new work, including material callouts for CMU, metal fascia, and aluminum lettering. This specific version is part of Addendum No. 1, dated 06/20/2024, relating to slab work.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 4 - War Memorial Stadium Locker Room Renovation: Technical architectural drawings and wall/roof section details for the City of Hampton War Memorial Stadium Locker Room Renovation. This document, part of Addendum No. 1 (dated 06/20/2024), provides specific construction details regarding aluminum gutters, EPDM roofing, CMU wall sections, and insulation requirements.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 7 - Mechanical Details: Technical mechanical detail drawings for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes typical details for duct and pipe penetrations (interior and exterior), support details, branch connections, splash blocks, and housekeeping pads. It is part of Addendum No. 1, dated June 14, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 Attachment 8 - Plumbing Isometrics: Technical plumbing isometric drawings for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes sanitary piping specifications (e.g., 4-inch and 2-inch SAN) and is part of Addendum No. 1, issued June 14, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 1 - Lighting Fixture Schedule: This document is an attachment to Addendum No. 1 for ITB 24-58TM regarding the City of Hampton War Memorial Stadium Locker Room Renovation. It contains the Lighting Fixture Schedule, including technical specifications for LED fixtures, voltage, wattage, and lumens, as well as the First Floor Plan Lighting layout and general electrical notes.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 2 Attachment 1 - S-001: This document contains general structural notes and technical specifications for a construction project under ITB 24-58TM. It details coordination requirements, design codes (including 2018 VUSBC and IBC), governing standards, and specific material requirements for concrete and reinforcing steel. It serves as a technical attachment to Addendum 2.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Addendum 2 Attachment 2 - S-004: Technical drawing details for ITB 24-58TM, including masonry wall infill, concentrated loads on steel joists, typical base plate, and typical trench slab infill details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Addendum 2 Attachment 3 - S-102: Technical drawing notes for Roof Framing Plan S-102, provided as Attachment 3 to Addendum 2 for ITB 24-58TM. The document contains critical construction specifications regarding joist bearing elevations, masonry lintel beams, roof deck requirements, and structural steel components.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Addendum 2 Attachment 9 - A-301: Architectural wall sections and detail drawings (Sheet A-301) for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes technical specifications for construction materials such as CMU block, metal fascia, roofing membranes, and insulation, as well as specific section details for canopies and columns. Dated January 19, 2024, with an addendum note from June 20, 2024.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-58TM Addendum No 2 - War Memorial Stadium Locker Room Project: Issued June 27, 2024, for the War Memorial Stadium Locker Room Project (ITB 24-58TM). This addendum provides missing attachments from Addendum 1, updated structural drawings, and a response to a substitution request regarding Columbia Lockers, which was not approved due to insufficient information. The bid due date is noted as July 3, 2024, at 2:00 p.m.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Attachment 11 - Handling of PCB Ballasts and Mercury Lamps: Technical specification section 028416 detailing the requirements for the removal, handling, and disposal of PCB-containing lighting ballasts and mercury-containing lamps. It outlines regulatory compliance (CFR and VAC), the requirement for a Certified Industrial Hygienist (CIH), mandatory submittals including work and disposal plans, and specific execution procedures for spill cleanup and waste management.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Attachment 13 - Preparation for Reroofing: Technical specifications (Section 070150.19) for reroofing preparation, including partial roof tear-off, base flashing removal, and roof re-cover preparation. The document details pre-installation meeting requirements, submittal needs, quality assurance, and execution procedures for removing EPDM roofing and preparing the deck.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Attachment 25 - Selective Demolition: Technical specifications for Section 024119 - Selective Demolition, provided as Attachment 25 to Addendum 1 of ITB 24-58TM. The document outlines requirements for the removal of building and site elements, salvage procedures, refrigerant recovery, engineering surveys, and coordination of utility services to ensure minimal disruption to Owner operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Attachment 29 - Metal Composite Material Wall Panels: Technical specifications for Section 074213.23 regarding Metal Composite Material Wall Panels. The document outlines requirements for action and informational submittals, quality assurance, delivery, storage, and warranty periods (5 years for materials, 20 years for finishes). It defines structural performance standards (ASTM E330, E283, E331), approved manufacturers (Alcoa, ALPOLIC, ALUCOBOND), and material compositions for aluminum-faced composite panels.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Attachment 31 - Plastic Toilet Compartments: Technical specifications for Section 102113.19 regarding the procurement and installation of solid-plastic toilet compartments. The document details material requirements (HDPE), performance standards (NFPA 286, ADA), submittal requirements, and specific hardware components for an overhead-braced, floor-anchored system.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Attachment 5 - S-202 (Sections and Details): Structural drawing sheet S-202 for the City of Hampton War Memorial Stadium Locker Room Renovation. The document contains technical sections and details regarding roofing systems, steel joists, CMU bond beams, and masonry veneer, dated January 19, 2024, with an update for Addendum No. 1 on June 14, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Attachment 6 - Panelboard MDP Schedule: Technical electrical specifications and panelboard MDP schedules for the City of Hampton War Memorial Stadium Locker Room Renovation. The document includes circuit numbers, breaker trips, load amps, and a power riser diagram, dated June 14, 2024, as part of Addendum No. 1.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM Attachment 8 - A-101 Floor Plan: Architectural drawing (Sheet A-101) for the City of Hampton War Memorial Stadium Locker Room Renovation. The document provides detailed floor plans for demolition and new construction, including specific demolition keynotes (D02-D38), room labels (locker rooms, showers, toilets), and general construction notes. Issued as part of Addendum No. 1 dated 06/14/2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Cold-Formed Metal Framing Specifications: Technical specifications for Section 054000 - Cold-Formed Metal Framing, provided as Attachment 12 to Addendum 1 of ITB 24-58TM. The document details requirements for exterior and interior non-load-bearing wall framing, including material standards (ASTM C955, A1003), performance criteria, delegated design requirements, and specific product data for steel studs, tracks, and deflection clips.
PDF
PDF, High priority: read this firstbid-sheet
HighAI Summary for ITB 24-58TM Revised Bid Sheet (Mod 1): Revised bid sheet for the War Memorial Stadium Locker Room Renovation (ITB 24-58TM). The document requests lump sum pricing for two options: Option A (completion by May 1, 2025) and Option B (accelerated completion by February 15, 2025), with a notice to proceed date of August 15, 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM - S-201 Sections and Details: Structural engineering drawing (Sheet S-201) for the City of Hampton War Memorial Stadium Locker Room Renovation. The document contains detailed sections and specifications for CMU wall infill, steel lintels, concrete slab-on-grade, and reinforcement details. It is part of Addendum No. 1 for ITB 24-58TM, dated June 14, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Section 012100 - Allowances: Technical specification section 012100 regarding Allowances for ITB 24-58TM. It outlines administrative procedures for lump-sum and quantity allowances, including selection, purchase, and submittal requirements. Specifically, it establishes a bidding allowance of $11,250 for patching and filling holes in CMU walls.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Section 015000 - Temporary Facilities and Controls: Technical specifications for Section 015000 regarding temporary facilities and controls for project ITB 24-58TM. The document outlines requirements for temporary utilities, site utilization plans, dust and noise control, quality assurance standards, and specific material requirements for fencing and field offices.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Section 028313 - Lead, Cadmium and Chromium in Construction: Technical specifications for the removal and disturbance of paint containing lead, cadmium, and chromium during the War Memorial Stadium Improvements project in Hampton, VA. The document outlines work requirements, safety compliance with 29 CFR 1926 regulations, contractor responsibilities for disposal and air monitoring, and references to ANSI standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Section 042613 - Masonry Veneer: Technical specifications for Section 042613 - Masonry Veneer, part of ITB 24-58TM. The document details requirements for brick, concrete masonry units (CMU), ties, anchors, and mortar mixes. It includes comprehensive guidelines for action and informational submittals, quality assurance, mockup requirements, delivery, storage, and field conditions for both cold and hot weather.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Section 055000 Metal Fabrications: Technical specifications for Section 055000 - Metal Fabrications, provided as Attachment 7 to Addendum 2 of ITB 24-58TM. The document details requirements for metal ladders, steel lintels, anchor bolts, and miscellaneous framing. It includes standards for materials (ASTM A 36, A 500, A 53), welding qualifications (AWS D1.1), fabrication methods, and submittal requirements for shop drawings and delegated design.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Section 055000 Metal Fabrications: Technical specifications for Section 055000 - Metal Fabrications, associated with ITB 24-58TM. The document details requirements for metal ladders, steel plates, shapes, bars, and fasteners, including material standards (ASTM), fabrication methods, and submittal requirements for shop drawings and professional engineering certifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Section 077200 Roof Accessories: Technical specifications for roof accessories associated with ITB 24-58TM, Addendum 1. The document details requirements for roof curbs, equipment supports, roof hatches, and pipe/duct supports, including material standards (galvanized steel), performance criteria for wind restraint, and submittal requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Section 081416 Flush Wood Doors: Technical specifications for flush wood doors as part of the War Memorial Stadium Locker Room Renovation (ITB 24-58TM). The document details requirements for five-ply flush wood veneer-faced doors, including material standards (ANSI/WDMA I.S. 1A), factory finishing, fabrication, and installation criteria.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM Section 089119 - Fixed Louvers: Technical specifications for Section 089119 - Fixed Louvers, part of solicitation ITB 24-58TM. The document details requirements for fixed extruded-aluminum louvers, including performance standards (AMCA 500-L), material specifications (ASTM B221/B209), submittal requirements, and installation criteria for insect screening and blank-off panels.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITb 24-58TM Section 102800 - Toilet, Bath, and Laundry Accessories: Technical specifications for Section 102800 regarding toilet, bath, and laundry accessories. The document details requirements for public-use washroom, shower, childcare, and custodial accessories, including specific product standards for Bobrick (or equal) dispensers and soap units, structural performance for grab bars, and warranty terms.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - Statement of Special Inspections (War Memorial Phase 1): A Statement of Special Inspections for the War Memorial Stadium Locker Room Renovation in Hampton, Virginia. Prepared by McPherson Design Group, Inc., the document outlines the required special inspections per the International Building Code and Virginia Uniform Statewide Building Code, identifies the structural engineer of record, and establishes the reporting requirements for the Special Inspector.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM War Memorial Locker Room Renovation - Hazmat/Permit: Technical specifications and building planning review submission for the War Memorial Stadium Locker Room Renovation (Phase 1). The document contains critical hazardous materials (Hazmat) notes regarding the removal of asbestos-containing materials, lead, chromium, and PCB-containing ballasts, as well as erosion and sediment control standards.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-58TM War Memorial Stadium Locker Room Project - Addendum 1: Addendum No. 1 issued June 21, 2024, for the War Memorial Stadium Locker Room Project (ITB 24-58TM). This document extends the bid closing date to July 3, 2024, provides updated drawings and specifications, introduces a revised bid sheet, responds to substitution requests, and answers 15 technical questions from bidders.
PDF
PDF, High priority: read this firstitb
HighAI Summary for ITB 24-58TM: War Memorial Stadium Locker Room Renovation: Issued May 28, 2024, by the City of Hampton, VA, this Invitation to Bid (ITB #24-58TM) seeks qualified bidders for the renovation of the War Memorial Stadium locker room. The document outlines competitive sealed bidding procedures per Virginia Code, submission deadlines (June 25, 2024), and detailed requirements including bid submission terms, insurance, performance/payment bonds, and a scope of work.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM - War Memorial Stadium Locker Room Renovation Finish Schedule: This document is a Finish Schedule and Plan (Sheet A-701) dated 01/19/2024 for the City of Hampton War Memorial Stadium Locker Room Renovation. It provides detailed material specifications for flooring, walls, and ceilings across various rooms (e.g., locker rooms, showers, toilets), including specific manufacturer data for epoxy flooring, athletic tiles, and porcelain tiles, as well as a comprehensive finish legend and installation notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM - War Memorial Stadium Locker Room Renovation Specifications: Technical specifications for the Phase 1 renovation of a 2,272 square foot locker room at War Memorial Stadium in Hampton, VA. Dated April 19, 2024, the document includes a detailed table of contents covering divisions 00 through 12, project information, and a summary of work including mechanical, plumbing, and electrical system updates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-58TM War Memorial Stadium Locker Room Renovation - Table of Contents: Table of Contents for the War Memorial Stadium Locker Room Renovation project (ITB 24-58TM). It outlines the technical specifications across multiple divisions, including General Requirements, Existing Conditions, Masonry, Metals, Wood/Plastics, Thermal and Moisture Protection, Openings, Finishes, Specialties, and Furnishings, as well as hazardous materials and special inspection appendices.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM War Memorial Stadium Phase 1 - Site Plans (CG101): Technical site plan (Sheet CG101) for Plan Grading and Drainage regarding the Locker Room Renovation at War Memorial Stadium for the City of Hampton. This document is part of Addendum 1, issued on 06/14/2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for ITB 24-58TM - War Memorial Stadium Site Plans (CS101): Technical site plan (Sheet CS101) for the War Memorial Stadium Locker Room Renovation for the City of Hampton, VA. This document is part of Addendum 1, issued on 06/14/2024, and provides plan layout and utility details.
PDF
PDF, Low priorityindustry-day
LowAI Summary for ITB 24-58TM War Memorial Stadium Locker Room Project - Pre-Bid Sign-In Sheet: A non-mandatory pre-bid sign-in sheet for the War Memorial Stadium Locker Room Project (ITB 24-58TM), used to record the names, titles, and contact information of attending company representatives.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
2 updates
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Jun 25, 2025 to Jun 25, 2024.
Deadline changed
Response deadline changed from Jun 25, 2024 to Jul 3, 2024.
Response Deadline
Deadline has passed
Submission Closed