Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

ITB - Construction of a Sanitary Sewer System Extension at Castledale Drive for Harris County Precinct 2 (CDBG BABAA)

Active
26/0353State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Harris County is soliciting bids for the construction of a sanitary sewer system extension at Castledale Drive for Precinct 2, identified by UPIN 26289MF40101 and solicitation number 26/0353. The scope of work involves site preparation, groundwater control, and the installation of pipes, including those crossing under roadways. Technical execution must adhere to ASTM and TXDOT soil laboratory test designations and comply with OSHA 29 CFR Part 1926 safety regulations for excavation and trenching. Specifically, any trench deeper than 20 feet requires shoring or bracing designed by a licensed professional engineer. The contract is an Invitation for Bid with a response deadline of November 16, 2026. A critical requirement for award is the achievement of a 15 percent goal for Minority- and Woman-owned Business Enterprise (M/WBE) participation. Bidders must submit a completed Utilization Plan, signed Letters of Intent, and active certifications via the Bonfire portal; failure to demonstrate these goals or provide documentation of good faith efforts will result in the bid being rejected as non-responsive. All pricing and bid schedules must be submitted electronically through the Bonfire portal.

General Info

Harris County seeks bids for a sanitary sewer extension at Castledale Drive.

Documents

4

Attachment A - Bid Addenda Acknowledgement

PDF, High priority: read this first1 page · bid-addenda-acknowledgement
High

Attachment B - Bid Schedule - Pricing Form

PDF, High priority: read this first1 page · bid-schedule
High

Attachment BB – Non-HUB MWBE Goal Participation Information Packet

PDF, High priority: read this firstspecifications
High

Geotechnical Investigation - Aldine Westfield Precinct Two Mary Eleanor Subdivision

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Harris County
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → Harris County
Office AddressTX, USA
Contacts
Luke Herdrich

Interested Companies (12)

Gov AlphaBrooklyn, NY
Blazey Construction Services
Amtek Information Service

See All 12 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Construction of a Sanitary Sewer System Extension at Castledale Drive for Harris County Precinct 2 - UPIN: 26289MF40101

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Bids must be submitted using the EJCDC C-410 Bid Form and must include a bid bond. The successful contractor will be required to provide performance and payment bonds and proof of insurance. Performance is governed by EJCDC standard general and supplementary conditions, with substantial completion determined through joint inspections by the owner, contractor, and engineer. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the City of Belmont.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Texas → Harris County

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS